Second Link Expressway


The Second Link Expressway is a controlled-access highway in Johor, Malaysia. It runs from Senai, Kulai District near the international airport to the Malaysia–Singapore Second Link at Tanjung Kupang, Johor Bahru District.

Route background

The Kilometre Zero for the entire expressway is located at the Malaysia–Singapore border at the Malaysia–Singapore Second Link.

History

Construction of the Second Link

In July 1989, United Engineers Malaysia Berhad submitted a proposal to the government of Malaysia to privatize the construction of a second link to Singapore. The acceptance of the proposal brought about the signing of a concession agreement in July 1993, giving exclusive rights and authority to UEM to design, construct, manage, operate and maintain the bridge and expressways for a period of 30 years commencing 27 July 1993.
Following this, a novation agreement was executed in May 1994, whereby UEM assigned all its rights, liabilities and obligations in respect of the concession agreement to Linkedua Berhad, a wholly owned subsidiary of UEM.
The major components of the project are the Second Crossing bridge, 44 kilometers of expressways, The Sultan Abu Bakar Customs, Immigration and Quarantine Complex, three toll plazas, two rest and service areas and other ancillary facilities. The bridge was designed to accommodate up to 200,000 vehicles a day.

Opening ceremony

The Second Link was opened to traffic on 2 January 1998. It was officially opened on 18 April the same year by the Prime Ministers of both countries, namely Dato' Seri Dr. Mahathir Mohamad of Malaysia and Goh Chok Tong of Singapore. The Malaysia–Singapore Second Crossing heralded a new era in bilateral relations, and brought with it the promise of improved economic and social ties.
At 2007, PLUS Expressway Berhad has entered into conditional agreements with the UEM Group to acquire the entire interests in Expressway Lingkaran Tengah Sdn Bhd and Linkedua Bhd for RM866mil. That mean ELITE and LINKEDUA became wholly owned subsidiaries of PLUS Expressways Berhad.

Pontian Link

A new link heading towards Pontian through the Pulai Interchange Exit 307A at km 15.3 on the Second Link Expressway was opened to traffic starting from 1:00 pm, 10 November 2007 on Saturday.
The Pontian Link provides easy access for highway users, connecting the Second Link Expressway to Ulu Choh-Gelang Patah Interchange.
Construction of the 2.7 km link started on 17 April 2006 and was fully completed on 16 October 2007