Shinkansen
The Shinkansen, colloquially known in English as the bullet train, is a network of high-speed railway lines in Japan. Initially, it was built to connect distant Japanese regions with Tokyo, the capital, in order to aid economic growth and development. Beyond long-distance travel, some sections around the largest metropolitan areas are used as a commuter rail network. It is operated by five Japan Railways Group companies.
Over the Shinkansen's 50-plus year history, carrying over 10 billion passengers, there has been not a single passenger fatality or injury due to train accidents.
Starting with the Tōkaidō Shinkansen in 1964, the network has expanded to currently consist of of lines with maximum speeds of, of Mini-Shinkansen lines with a maximum speed of, and of spur lines with Shinkansen services. The network presently links most major cities on the islands of Honshu and Kyushu, and Hakodate on northern island of Hokkaido, with an extension to Sapporo under construction and scheduled to commence in March 2031. The maximum operating speed is . Test runs have reached for conventional rail in 1996, and up to a world record for SCMaglev trains in April 2015.
The original Tōkaidō Shinkansen, connecting Tokyo, Nagoya and Osaka, three of Japan's largest cities, is one of the world's busiest high-speed rail lines. In the one-year period preceding March 2017, it carried 159 million passengers, and since its opening more than five decades ago, it has transported more than 5.6 billion total passengers The service on the line operates much larger trains and at higher frequency than most other high speed lines in the world. At peak times, the line carries up to thirteen trains per hour in each direction with sixteen cars each with a minimum headway of three minutes between trains.
Japan's Shinkansen network had the highest annual passenger ridership of any high-speed rail network until 2011, when the Chinese high-speed railway network surpassed it at 370 million passengers annually, reaching over 1.7 billion annual passengers in 2017, though the total cumulative passengers, at over 10 billion, is still larger. While the Shinkansen network has been expanding, Japan's declining population is expected to cause ridership to decline over time. The recent expansion in tourism has boosted ridership marginally.
Etymology
Shinkansen in Japanese means 'new trunk line' or 'new main line', but this word is used to describe both the railway lines the trains run on and the trains themselves. In English, the trains are also known as the bullet train. The term bullet train originates from 1939, and was the initial name given to the Shinkansen project in its earliest planning stages. Furthermore, the name superexpress, used exclusively until 1972 for trains on the Tōkaidō Shinkansen, is used today in English-language announcements and signage.History
Japan was the first country to build dedicated railway lines for high-speed travel. Because of the mountainous terrain, the existing network consisted of narrow-gauge lines, which generally took indirect routes and could not be adapted to higher speeds. Consequently, Japan had a greater need for new high-speed lines than countries where the existing standard gauge or broad gauge rail system had more upgrade potential.Among the key people credited with the construction of the first Shinkansen are Hideo Shima, the Chief Engineer, and Shinji Sogō, the first President of Japanese National Railways who managed to persuade politicians to back the plan. Other significant people responsible for its technical development were Tadanao Miki, Tadashi Matsudaira, and Hajime Kawanabe based at the Railway Technical Research Institute, part of JNR. They were responsible for much of the technical development of the first line, the Tōkaidō Shinkansen. All three had worked on aircraft design during World War II.
Early proposals
The popular English name bullet train is a literal translation of the Japanese term dangan ressha, a nickname given to the project while it was initially being discussed in the 1930s. The name stuck because of the original 0 Series Shinkansen's resemblance to a bullet and its high speed.The Shinkansen name was first formally used in 1940 for a proposed standard gauge passenger and freight line between Tokyo and Shimonoseki that would have used steam and electric locomotives with a top speed of. Over the next three years, the Ministry of Railways drew up more ambitious plans to extend the line to Beijing and even Singapore, and build connections to the Trans-Siberian Railway and other trunk lines in Asia. These plans were abandoned in 1943 as Japan's position in World War II worsened. However, some construction did commence on the line; several tunnels on the present-day Shinkansen date to the war-era project.
Construction
Following the end of World War II, high-speed rail was forgotten for several years while traffic of passengers and freight steadily increased on the conventional Tōkaidō Main Line along with the reconstruction of Japanese industry and economy. By the mid-1950s the Tōkaidō Line was operating at full capacity, and the Ministry of Railways decided to revisit the Shinkansen project. In 1957, Odakyu Electric Railway introduced its 3000 series SE Romancecar train, setting a world speed record of for a narrow gauge train. This train gave designers the confidence that they could safely build an even faster standard gauge train. Thus the first Shinkansen, the 0 series, was built on the success of the Romancecar.In the 1950s, the Japanese national attitude was that railways would soon be outdated and replaced by air travel and highways as in America and many countries in Europe. However, Shinji Sogō, President of Japanese National Railways, insisted strongly on the possibility of high-speed rail, and the Shinkansen project was implemented.
Government approval came in December 1958, and construction of the first segment of the Tōkaidō Shinkansen between Tokyo and Osaka started in April 1959. The cost of constructing the Shinkansen was at first estimated at nearly 200 billion yen, which was raised in the form of a government loan, railway bonds and a low-interest loan of US$80 million from the World Bank. Initial cost estimates, however, had been deliberately understated and the actual figures were nearly double at about 400 billion yen. As the budget shortfall became clear in 1963, Sogo resigned to take responsibility.
A test facility for rolling stock, now part of the line, opened in Odawara in 1962.
Initial success
The Tōkaidō Shinkansen began service on 1 October 1964, in time for the first Tokyo Olympics. The conventional Limited Express service took six hours and 40 minutes from Tokyo to Osaka, but the Shinkansen made the trip in just four hours, shortened to three hours and ten minutes by 1965. It enabled day trips between Tokyo and Osaka, the two largest metropolises in Japan, changed the style of business and life of the Japanese people significantly, and increased new traffic demand. The service was an immediate success, reaching the 100 million passenger mark in less than three years on 13 July 1967, and one billion passengers in 1976. Sixteen-car trains were introduced for Expo '70 in Osaka. With an average of 23,000 passengers per hour in each direction in 1992, the Tōkaidō Shinkansen was the world's busiest high-speed rail line. As of 2014, the train's 50th anniversary, daily passenger traffic had risen to 391,000 which, spread out over its 18-hour schedule, represented an average of just under 22,000 passengers an hour.The first Shinkansen trains, the 0 series, ran at speeds of up to, later increased to. The last of these trains, with their classic bullet-nosed appearance, were retired on 30 November 2008. A driving car from one of the 0 series trains was donated by JR West to the National Railway Museum in York, United Kingdom in 2001.
Network expansion
The Tōkaidō Shinkansen's rapid success prompted an extension westward to Okayama, Hiroshima and Fukuoka, which was completed in 1975. Prime Minister Kakuei Tanaka was an ardent supporter of the Shinkansen, and his government proposed an extensive network paralleling most existing trunk lines. Two new lines, the Tōhoku Shinkansen and Jōetsu Shinkansen, were built following this plan. Many other planned lines were delayed or scrapped entirely as JNR slid into debt throughout the late 1970s, largely because of the high cost of building the Shinkansen network. By the early 1980s, the company was practically insolvent, leading to its privatization in 1987.Development of the Shinkansen by the privatised regional JR companies has continued, with new train models developed, each generally with its own distinctive appearance. Since 2014, Shinkansen trains run regularly at speeds up to on the Tōhoku Shinkansen, only the Shanghai maglev train and China Railway High-speed networks have commercial services that operate faster.
Since 1970, development has also been underway for the Chūō Shinkansen, a planned maglev line from Tokyo to Osaka. On 21 April 2015, a seven-car L0 series maglev trainset set a world speed record of.
Technology
To enable high-speed operation Shinkansen uses a range of advanced technology compared with conventional rail, achieving not only high speed but also a high standard of safety and comfort. Its success has influenced other railways in the world and the importance and advantage of high-speed rail has consequently been reevaluated.Routing
Shinkansen routes are completely separate from conventional rail lines. Consequently, the shinkansen is not affected by slower local or freight trains, and has the capacity to operate many high-speed trains punctually. The lines have been built without road crossings at grade. Tracks are strictly off-limits with penalties against trespassing strictly regulated by law. It uses tunnels and viaducts to go through and over obstacles rather than around them, with a minimum curve radius of 4,000 meters.Track
The Shinkansen uses standard gauge in contrast to the narrow gauge of older lines. Continuous welded rail and swingnose crossing points are employed, eliminating gaps at turnouts and crossings. Long rails are used, joined by expansion joints to minimize gauge fluctuation due to thermal elongation and shrinkage.A combination of ballasted and slab track is used, with slab track exclusively employed on concrete bed sections such as viaducts and tunnels. Slab track is significantly more cost-effective in tunnel sections, since the lower track height reduces the cross-sectional area of the tunnel, thereby reducing construction costs by up to 30%.
However, the smaller diameter of Shinkansen tunnels compared to some other high-speed lines has resulted in the issue of tunnel boom becoming a concern for residents living close to tunnel portals.
The slab track consists of rails, fasteners and track slabs with a cement asphalt mortar. On the roadbed and in tunnels, circular upstands are located at 5-metre intervals. The
prefabricated upstands are made of either reinforced concrete or pre-stressed reinforced concrete; they prevent the track slab from moving along either the latitudinal or the longitudinal directions. One track slab weighs approximately 5 tons, measuring 2220–2340 mm wide, 4900–4950 mm long and 160–200 mm thick.
Signal system
The Shinkansen employs an ATC system, eliminating the need for trackside signals. It uses a comprehensive system of Automatic Train Protection. Centralized traffic control manages all train operations, and all tasks relating to train movement, track, station and schedule are networked and computerized.Electrical systems
Shinkansen uses a 25 kV AC overhead power supply, to overcome the limitations of the 1,500 V direct current used on the existing electrified narrow-gauge system. Power is distributed along the axles of the train to reduce the heavy axle loads under single power cars. The AC frequency of the power supply for the Tokaido Shinkansen is 60 Hz.Trains
Shinkansen trains are electric multiple units, offering fast acceleration, deceleration and reduced damage to the track because of the use of lighter vehicles compared to locomotives or power cars. The coaches are air-sealed to ensure stable air pressure when entering tunnels at high speed.Traction
The Shinkansen has used the electric multiple unit configuration from the outset, with the 0 Series Shinkansen having all axles powered. Other railway manufacturers were traditionally reluctant, or unable to use distributed traction configurations TGV use the locomotive In Japan, significant engineering desirability exists for the electric multiple unit configuration. A greater proportion of motored axles results in higher acceleration, meaning that the Shinkansen does not lose as much time if stopping frequently. Shinkansen lines have more stops in proportion to their lengths than high-speed lines elsewhere in the world.Reliability
Punctuality
The Shinkansen is very reliable thanks to several factors, including its near-total separation from slower traffic. In 2016, JR Central reported that the Shinkansen's average delay from schedule per train was 24 seconds. This includes delays due to uncontrollable causes, such as natural disasters. The record in 1997 was 18 seconds.Safety record
Over the Shinkansen's 50-plus year history, carrying over 10 billion passengers, there have been no passenger fatalities due to train accidents such as derailments or collisions, despite frequent earthquakes and typhoons. Injuries and a single fatality have been caused by doors closing on passengers or their belongings; attendants are employed at platforms to prevent such accidents. There have, however, been suicides by passengers jumping both from and in front of moving trains. On 30 June 2015, a passenger committed suicide on board a Shinkansen train by setting himself on fire, killing another passenger and seriously injuring seven other people.There have been two derailments of Shinkansen trains in passenger service. The first one occurred during the Chūetsu earthquake on 23 October 2004. Eight of ten cars of the Toki No. 325 train on the Jōetsu Shinkansen derailed near Nagaoka Station in Nagaoka, Niigata. There were no casualties among the 154 passengers.
Another derailment happened on 2 March 2013 on the Akita Shinkansen when the Komachi No. 25 train derailed in blizzard conditions in Daisen, Akita. No passengers were injured.
In the event of an earthquake, an earthquake detection system can bring the train to a stop very quickly; newer trainsets are lighter and have stronger braking systems, allowing for quicker stopping. A new anti-derailment device was installed after detailed analysis of the Jōetsu derailment.
Several months after the expose of the Kobe Steel falsification scandal, which is among the suppliers of high-strength steel for Shinkansen trainsets, cracks were found upon inspection of a single bogie, and removed from service on 11 December 2017.
Impacts
Economics
The Shinkansen has had a significant beneficial effect on Japan's business, economy, society, environment and culture beyond mere construction and operational contributions. The results in time savings alone from switching from a conventional to a high-speed network have been estimated at 400 million hours, and the system has an economic impact of per year. That does not include the savings from reduced reliance on imported fuel, which also has national security benefits. Shinkansen lines, particularly in the very crowded coastal Taiheiyō Belt megalopolis, met two primary goals:- Shinkansen trains reduced the congestion burden on regional transportation by increasing throughput on a minimal land footprint, therefore being economically preferable compared to modes common in less densely populated regions of the world.
- As rail was already the primary urban mode of passenger travel, from that perspective it was akin to a sunk cost; there was not a significant number of motorists to convince to switch modes. The initial megalopolitan Shinkansen lines were profitable and paid for themselves. Connectivity rejuvenated rural towns such as Kakegawa that would otherwise be too distant from major cities.
Such expansion had a significant cost. JNR, the national railway company, was already burdened with subsidizing unprofitable rural and regional railways. Additionally it assumed Shinkansen construction debt to the point the government corporation eventually owed some, contributing to it being regionalised and privatized in 1987. The privatized JRs eventually paid a total of to acquire JNR's Shinkansen network.
Following privatization, the JR group of companies have continued Shinkansen network expansion to less populated areas, but with far more flexibility to spin off unprofitable railways or cut costs than in JNR days. Currently an important factor is the post bubble zero interest-rate policy that allows JR to borrow huge sums of capital without significant concern regarding repayment timing.
Environment
Traveling by the Tokaido Shinkansen from Tokyo to Osaka produces only around 16% of the carbon dioxide of the equivalent journey by car, a saving of 15,000 tons of per year.Challenges encountered
Noise pollution
concerns mean that increasing speed is becoming more difficult. In Japan, the population density is high and there have been severe protests against the Shinkansen's noise pollution, meaning that its noise is now limited to less than 70 dB in residential areas.Hence, improvement and reduction of the pantograph, weight saving of cars, and construction of noise barriers and other measures have been implemented. Current research is primarily aimed at reducing operational noise, particularly the tunnel boom phenomenon caused when trains transit tunnels at high speed.
Earthquake
Because of the risk of earthquakes, the Urgent Earthquake Detection and Alarm System was introduced in 1992. It enables automatic braking of Shinkansen trains in the case of large earthquakes.Heavy snow
The Tōkaidō Shinkansen often experiences heavy snow in the area around Maibara Station in winter. Trains have to reduce speed, which can disrupt the timetable. Sprinkler systems were later installed, but delays of 10 to 20 minutes still occur during snowy weather. Additionally, treefalls related to excess snow have caused service interruptions. Along the route of the Jōetsu Shinkansen, winter snow can be very heavy, with snow depths of two to three metres, so the line is equipped with stronger sprinklers and slab track, to mitigate the effects of deep snow.Ridership
Annual
Until 2011, Japan's high-speed rail system had the highest annual patronage of any system worldwide, China's HSR network's patronage reached 1.7 billion and is now the world's highest.
Cumulative comparison
Year | Shinkansen | Asia | Europe | World | Shinkansen share |
1964 | 11.0 | 0 | 0 | 11.0 | 100% |
1980 | 1,616.3 | 0 | 0 | 1,616.3 | 100% |
1985 | 2,390.3 | 0 | 45.7 | 2,436.0 | 98.1% |
1990 | 3,559.1 | 0 | 129.9 | 3,689.0 | 96.5% |
1995 | 5,018.0 | 0 | 461 | 5,479 | 91.6% |
2000 | 6,531.7 | 0 | 1,103.5 | 7,635.1 | 85.5% |
2005 | 8,088.3 | 52.2 | 2,014.6 | 10,155.1 | 79.6% |
2010 | 9,651.0 | 965 | 3,177.0 | 15,417 | 70.8% |
2012 | 10,344 | 2,230 | 3,715 | 16,210 | 64.5% |
2014 | 11,050 | 3,910 | 4,300 | 19,260 | 57.4% |
Notes:
- Data in italics includes extrapolated estimations where data is missing. Turkey and Russia data here is included in "Europe" column, rather than split between Asia and Europe. Only systems with 200 km/h or higher regular service speed are considered.
- "Shinkansen share" refers to percent of Shinkansen ridership as a percent of "World" total. Currently this only pertains to Taiwan, but may change if Japan exports Shinkansen to other nations.
- "Shinkansen" column does not include Shinkansen knock down kits made in Japan exported to China for assembly, or any derivative system thereof in China)
- "Asia " column refers to sum of riderships of all HSR systems geographically in Asia that do not use Shinkansen.
- For 2013, Japan's Ministry of Transport has not updated data, nor is summed European data available, however Taiwan ridership is 47.49 million and Korea with 54.5 million and China with 672 million in 2013.
Future
Speed increases
Tohoku Shinkansen
trains, capable of up to , were introduced on the Tōhoku Shinkansen in March 2011. Operation at the maximum speed of 320 km/h between and on this route commenced on 16 March 2013, and reduced the journey time to around 3 hours for trains from Tokyo to Shin-Aomori.Extensive trials using the Fastech 360 test trains have shown that operation at is not currently feasible because of problems of noise pollution, overhead wire wear, and braking distances. On 30 October 2012, JR East announced that it is pursuing research and development to increase speeds to 360 km/h on the Tohoku Shinkansen by 2020. The ALFA-X is currently undergoing testing.
Hokkaido Shinkansen
, the maximum speed on the approximately 102 km dual gauge section of the Hokkaido Shinkansen is. There are approximately 50 freight trains using the dual gauge section each day, so limiting the travel of such trains to times outside of Shinkansen services is not an option. Because of this and other weather-related factors cited by JR East and JR Hokkaido, the fastest journey time between Tokyo and Shin-Hakodate-Hokuto is currently 4 hours, 2 minutes. The new section takes 61 minutes from Shin-Aomori to Shin-Hakodate-Hokuto on the fastest services.By 2018, it was proposed to allow one Shinkansen service each day to travel at by ensuring no freight trains are scheduled to travel on the dual gauge section at that time. To achieve the full benefit of Shinkansen trains travelling on the dual gauge section at, other alternatives are being considered, such as a system to automatically slow Shinkansen trains down to when passing narrow-gauge trains, and loading freight trains onto special "Train on Train" standard-gauge trains built to withstand the shock wave of oncoming Shinkansen trains traveling at full speed. This would enable a travel time from Tokyo to Shin-Hakodate-Hokuto of 3 hours and 45 minutes, a saving of 17 minutes on the current timetable.
Hokuriku extension
The Hokuriku Shinkansen is being extended from Kanazawa to Tsuruga at an estimated cost of 3.04 trillion yen.There are further plans to extend the line from Tsuruga to Osaka, with the 'Obama-Kyoto' route chosen by the government on 20 December 2016, after a government committee investigated the five nominated routes. The five routes that were under investigation are detailed in the Hokuriku Shinkansen page.
Construction of the extension beyond Tsuruga is not expected to commence before 2030, with a projected 15-year construction period. On 6 March 2017 the government committee announced the chosen route from Kyoto to Shin-Osaka is to be via Kyotanabe, with a station at Matsuiyamate on the Katamachi Line.
Interim plans
In order to extend the benefits of the Hokuriku Shinkansen to stations west of Tsuruga before the line to Osaka is completed, JR West was working in partnership with Talgo on the development of a Gauge Change Train capable of operating under both the 25 kV AC electrification used on the Shinkansen and the 1.5 kV DC system employed on conventional lines. A trial of the proposed bogie was undertaken on a purpose-built 180-metre-long gauge-changer at Tsuruga, however the trial was unsuccessful and such plans have now been abandoned.Tohoku extension/Hokkaido Shinkansen
The Hokkaido Shinkansen forms an extension of the Tohoku Shinkansen north of to Shin-Hakodate-Hokuto Station through the Seikan Tunnel, which was converted to dual gauge as part of the project, opening in March 2016.JR Hokkaido is extending the Hokkaido Shinkansen from Shin-Hakodate-Hokuto to to open by March 2031, with tunnelling work on the 5,265 m Murayama tunnel, situated about 1 km north of Shin-Hakodate-Hokuto Station, commencing in March 2015, and due to be completed by March 2021. The 211.3 km extension will be approximately 76% in tunnels, including major tunnels such as Oshima, Teine and Shiribeshi.
Although an extension from Sapporo to Asahikawa was included in the 1973 list of planned lines, at this time it is unknown whether the Hokkaido Shinkansen will be extended beyond Sapporo.
Nagasaki Shinkansen
is constructing an extension line of the Kyushu Shinkansen to, partly to full Shinkansen standard gauge construction standards with the existing narrow gauge section between Shin-Tosu and Takeo Onsen to be upgraded as part of this project.This proposal initially involved introducing Gauge Change Trains travelling from Hakata to Shin-Tosu on the existing Kyushu Shinkansen line, then passing through a specific gauge changing section of track linking to the existing Nagasaki Main Line, along which it would travel to Hizen Yamaguchi, then onto the Sasebo Line to Takeo Onsen, where another gauge changing section would lead onto the final Shinkansen line to Nagasaki. However, technical issues with the development of the GCT bogies means the train will not be available for service until at least 2025, requiring consideration of other options such as 'relay' service to ensure the line can open on schedule in fiscal 2022.
The proposal shortens the distance between Hakata and Nagasaki by 6.2%, and while only 64% of the route will be built to full Shinkansen standards, it will eliminate the slowest sections of the existing narrow gauge route. Use of the GCT was estimated to result in a time saving of 28.5% on the current timetable. The proposed time saving if a 'relay' service is introduced is unknown at this time.
As part of this proposal, the current 12.8 km section of single track between Hizen Yamaguchi and Takeo Onsen is proposed to be duplicated. However, due to the delay in the development of the GCT, the proposal has not advanced.
With the completion of excavation of the 1351m Enogushi tunnel, being the sixth tunnel completed in this section, approximately 25% of the 40.7 km of tunnel excavation work on the Takeo Onsen – Nagasaki section has been finished. The entire project is scheduled for completion by fiscal 2022.
Maglev (''Chuo Shinkansen'')
trains have been undertaking test runs on the Yamanashi test track since 1997, running at speeds of over. As a result of this extensive testing, maglev technology is almost ready for public usage. An extension of this test track from 18.4 km to 42.8 km was completed in June 2013, enabling extended high-speed running trials to commence in August 2013. This section will be incorporated into the Chūō Shinkansen which will eventually link Tokyo to Osaka. Construction of the Shinagawa to Nagoya section began in 2014, with 86% of the 286 km route to be in tunnels.The CEO of JR Central announced plans to have the maglev Chūō Shinkansen operating from Tokyo to by 2027. Following the shortest route, JR Central estimates that it will take 40 minutes to run from Shinagawa to Nagoya. A subsequent extension to Osaka is planned to be completed by 2037. The planned travel time from Shinagawa to Shin-Osaka is 1 hour 7 minutes. Currently the Tokaido Shinkansen has a minimum connection time of 2 hours 19 minutes.
While the government has granted approval for the shortest route between Tokyo and Nagoya, some prefectural governments, particularly Nagano, lobbied to have the line routed farther north to serve the city of Chino and either Ina or. However, that would increase both the travel time and the cost of construction. JR Central has confirmed it will construct the line through Kanagawa Prefecture, and terminate at Shinagawa Station.
The route for the Nagoya to Osaka section is also contested. It is planned to go via Nara, about 40 km south of Kyoto. Kyoto is lobbying to have the route moved north and be largely aligned with the existing Tokaido Shinkansen, which services Kyoto and not Nara.
Mini-Shinkansen
Mini-shinkansen is the name given to the routes where former narrow gauge lines have been converted to standard gauge to allow Shinkansen trains to travel to cities without the expense of constructing full Shinkansen standard lines.Two mini-shinkansen routes have been constructed: the Yamagata Shinkansen and Akita Shinkansen. Shinkansen services to these lines traverse the Tohoku Shinkansen line from Tokyo before branching off to traditional main lines. On both the Yamagata/Shinjo and Akita lines, the narrow gauge lines were regauged, resulting in the local services being operated by standard gauge versions of 1,067 mm gauge suburban/interurban rolling stock. On the Akita line between Omagari and Akita, one of the two narrow gauge lines was regauged, and a section of the remaining narrow gauge line is dual gauge, providing the opportunity for Shinkansen services to pass each other without stopping.
The maximum speed on these lines is 130 km/h, however the overall travel time to/from Tokyo is improved due to the elimination of the need for passengers to change trains at Fukushima and Morioka respectively.
As the Loading gauge was not altered when the rail gauge was widened, only Shinkansen trains specially built for these routes can travel on the lines. At present they are the E3 and E6 series trains.
Whilst no further Mini-shinkansen routes have been proposed to date, it remains an option for providing Shinkansen services to cities on the narrow gauge network.
Gauge Change Train
This is the name for the concept of using a single train that is specially designed to travel on both narrow gauge railway lines and the standard gauge used by Shinkansen train services in Japan. The trucks/bogies of the Gauge Change Train allow the wheels to be unlocked from the axles, narrowed or widened as necessary, and then relocked. This allows a GCT to traverse both standard gauge and narrow gauge tracks without the expense of regauging lines.Three test trains have been constructed, with the second set having completed reliability trials on the Yosan Line east of Matsuyama in September 2013. The third set was undertaking gauge changing trials at Shin-Yatsushiro Station, commencing in 2014 for a proposed three-year period, however testing was suspended in December 2014 after accumulating approximating 33,000 km, following the discovery of defective thrust bearing oil seals on the bogies. The train was being trialled between Kumamoto, travelling on the narrow gauge line to Shin-Yatsushiro, where a gauge changer has been installed, so the GCT could then be trialled on the Shinkansen line to Kagoshima. It was anticipated the train would travel approximately 600,000 km over the three-year trial.
A new "full standard" Shinkansen line is under construction from Takeo Onsen to, with the Shin-Tosu – Takeo Onsen section of the Kyushu Shinkansen branch to remain narrow gauge. GCTs were proposed to provide the Shinkansen service from the line's scheduled opening in fiscal 2022, however with the GCT now being unavailable for service until at least 2025, other options are being considered, such as a 'relay' service.
Types of lines
The main Shinkansen lines are:In practice, the Tokaido, San'yō, and Kyushu lines form a contiguous west/southbound line from Tokyo, as train services run between the Tokaido and San'yō lines and between the San'yō and Kyushu lines, though the lines are operated by different companies.
The Tokaido Shinkansen is not physically connected to the lines of the Tohoku Shinkansen at Tokyo Station. Therefore, there is no through service between those lines. All northbound services from Tokyo travel along the Tohoku Shinkansen until at least Ōmiya.
Two further lines, known as Mini-shinkansen, have also been constructed by re-gauging and upgrading existing sections of line:
- Yamagata Shinkansen
- Akita Shinkansen
- Hakata Minami Line
- Gala-Yuzawa Line – technically a branch of the Jōetsu Line –
Future lines
- Hokuriku Shinkansen extension from Kanazawa to Tsuruga is under construction and is scheduled to open in fiscal 2022. Between Hakusan Depot near Kanazawa and Tsuruga, the Fukui Shinkansen station was constructed in conjunction with the rebuilding of the adjoining conventional line station in anticipation of construction of the line to Osaka. The extension of the line to Osaka is proposed, with the route via Obama and Kyoto selected by the government on 20 December 2016. Construction is proposed to commence in 2030, and take 15 years.
- Construction of the West Kyushu Shinkansen branch from Shin-Tosu to Nagasaki, known as the Nagasaki Route or Nishi-Kyushu Route, started in 2008 and is proposed to open in fiscal 2022. The branch will be partially built to full Shinkansen standards with the existing narrow-gauge line from Shin-Tosu – Takeo Onsen to remain as narrow-gauge track. Gauge Change Trains and/or 'relay' services are to be provided on this route.
- Hokkaido Shinkansen from to is under construction and scheduled to open by March 2031.
- Chuo Shinkansen is a planned maglev line. JR Central has announced a 2027 target date for the line from Tokyo to Nagoya, with the extension to Osaka proposed to open in 2037. Construction of the project commenced in 2014.
- Hokkaido Shinkansen northward extension: Sapporo–Asahikawa
- Hokkaido South Loop Shinkansen: Oshamanbe–Muroran–Sapporo
- Uetsu Shinkansen: Toyama–Niigata–Aomori
- * Toyama–Jōetsu-Myōkō exists as part of the Hokuriku Shinkansen, and Nagaoka–Niigata exists as part of the Jōetsu Shinkansen, with provisions for the Uetsu Shinkansen at Nagaoka; Ōmagari–Akita exists as part of the Akita Shinkansen, but as a "Mini-Shinkansen" upgrade of existing conventional line, it does not meet the requirements of the Basic Plan.
- Ōu Shinkansen: Fukushima–Yamagata–Akita
- * Fukushima–Shinjō and Ōmagari–Akita exist as the Yamagata Shinkansen and Akita Shinkansen, respectively, but as "Mini-Shinkansen" upgrades of existing track, they do not meet the requirements of the Basic Plan.
- Hokuriku-Chūkyō Shinkansen: Nagoya–Tsuruga
- Sanin Shinkansen: Osaka–Tottori–Matsue–Shimonoseki
- Trans-Chūgoku Shinkansen: Okayama–Matsue
- Shikoku Shinkansen: Osaka–Tokushima–Takamatsu–Matsuyama–Ōita
- Trans-Shikoku Shinkansen: Okayama–Kōchi–Matsuyama
- * There have been some activity regarding the Shikoku and Trans-Shikoku Shinkansen in recent years. In 2016, the Shikoku and Trans-Shikoku Shinkansen were identified as potential future projects in a review of long term plans for the Shikoku area and funds allocated towards the planning of the route. A profitability study has also been commissioned by the city of Oita in 2018 that found the route to be potentially profitable
- East Kyushu Shinkansen: Fukuoka–Ōita–Miyazaki–Kagoshima
- Trans-Kyushu Shinkansen: Ōita–Kumamoto
The Narita Shinkansen project to connect Tokyo to Narita International Airport, initiated in the 1970s but halted in 1983 after landowner protests, has been officially cancelled and removed from the Basic Plan governing Shinkansen construction. Parts of its planned right-of-way were used by the Narita Sky Access Line which opened in 2010. Although the Sky Access Line uses standard-gauge track, it was not built to Shinkansen specifications and there are no plans to convert it into a full Shinkansen line.
In December 2009, then transport minister Seiji Maehara proposed a bullet train link to Haneda Airport, using an existing spur that connects the Tōkaidō Shinkansen to a train depot. JR Central called the plan "unrealistic" due to tight train schedules on the existing line, but reports said that Maehara wished to continue discussions on the idea. The current minister has not indicated whether this proposal remains supported. While the plan may become more feasible after the opening the Chuo Shinkansen frees up capacity, construction is already underway for other rail improvements between Haneda and Tokyo station expected to be completed prior to the opening of the 2020 Tokyo Olympics, so any potential Shinkansen service would likely offer only marginal benefit beyond that.
List of train types
Trains are up to sixteen cars long. With each car measuring in length, the longest trains are 400 m end to end. Stations are similarly long to accommodate these trains. Some of Japan's high-speed maglev trains are considered Shinkansen, while other slower maglev trains are intended as alternatives to conventional urban rapid transit systems.Passenger trains
Tokaido and San'yō Shinkansen
- 0 series: The first Shinkansen trains which entered service in 1964. Maximum operating speed was. More than 3,200 cars were built. Withdrawn in December 2008.
- 100 series: Entered service in 1985, and featured bilevel cars with restaurant car and compartments. Maximum operating speed was. Later used only on San'yō Shinkansen Kodama services. Withdrawn in March 2012.
- 300 series: Entered service in 1992, initially on Nozomi services with maximum operating speed of. Withdrawn in March 2012.
- 500 series: Introduced on Nozomi services in 1997, with an operating speed of. Since 2008, sets have been shortened from 16 to 8 cars for use on San'yō Shinkansen Kodama services.
- 700 series: Introduced in 1999, with maximum operating speed of. The JR Central owned units were withdrawn in March 2020, with the JR West owned units continuing to operate on the San'yō Shinkansen line between Shin-Osaka and Hakata.
- N700 series: In service since 2007, with a maximum operating speed of.
- N700A series: An upgraded version of N700 series with improved acceleration & deceleration and quieter traction motors. All N700 series sets are now converted to N700A.
- N700S series: The newest modification of the N700 series. First trainset was rolled out in 2019 with passenger services commencing on 1 July 2020.
Kyushu Shinkansen
- 800 series: In service since 2004 on Tsubame services, with a maximum speed of.
- N700-7000/8000 series In service since March 2011 on Mizuho and Sakura services with a maximum speed of.
Tohoku, Joetsu, and Hokuriku Shinkansen
- 200 series: The first type introduced on the Tohoku and Joetsu Shinkansen in 1982 and withdrawn in April 2013. Maximum speed was. The final configuration was as 10-car sets. 12-car and 16-car sets also operated at earlier times.
- E1 series: Bilevel 12-car trains introduced in 1994 and withdrawn in September 2012. Maximum speed was.
- E2 series: 8/10-car sets in service since 1997 with a maximum speed of.
- E4 series: Bilevel 8-car trains in service since 1997 with a maximum speed of.
- E5 series: 10-car sets in service since March 2011 with a maximum speed of.
- E7 series: 12-car trains operated on the Hokuriku Shinkansen since March 2014, with a maximum speed of.
- W7 series: 12-car trains operated on the Hokuriku Shinkansen since March 2015, with a maximum speed of.
Yamagata and Akita Shinkansen
- 400 series: The first Mini-shinkansen type, introduced in 1992 on Yamagata Shinkansen Tsubasa services with a maximum speed of 240 km/h. Withdrawn in April 2010.
- E3 series: Introduced in 1997 on Akita Shinkansen Komachi and Yamagata Shinkansen Tsubasa services with a maximum speed of 275 km/h. Now operated solely on the Yamagata Shinkansen.
- E6 series: Introduced in March 2013 on Akita Shinkansen Komachi services, with a maximum speed of, raised to in March 2014.
- E8 series: Future replacement of the E3 series for Tsubasa services to be introduced from 2024
Hokkaido Shinkansen
- H5 series: 10-car sets entered service from March 2016 on the Hokkaido Shinkansen with a maximum speed of.
Taiwan High Speed Rail
- 700T series : The first Shinkansen type exported outside Japan. 12-car trains based on 700 series entered service in 2007, with a maximum speed of.
Experimental trains
- Class 1000 – 1961
- Class 951 – 1969
- Class 961 – 1973
- Class 962 – 1979
- 500-900 series "WIN350" – 1992
- Class 952/953 "STAR21" – 1992
- Class 955 "300X" – 1994
- Gauge Change Train – 1998 to present
- Class E954 "Fastech 360S" – 2004
- Class E955 "Fastech 360Z" – 2005
- Class E956 "ALFA-X" – 2019
Maglev trains
- LSM200 – 1972
- ML100 – 1972
- ML100A – 1975
- ML-500 – 1977
- ML-500R – 1979
- MLU001 – 1981
- MLU002 – 1987
- MLU002N – 1993
- MLX01 – 1996
- L0 series – 2012
Maintenance vehicles
- 911 Type diesel locomotive
- 912 Type diesel locomotive
- DD18 Type diesel locomotive
- DD19 Type diesel locomotive
- 941 Type
- 921 Type
- 922 Type
- 923 Type
- 925 Type
- E926 Type
List of types of services
Tōkaidō, San'yō and Kyushu Shinkansen
- Nozomi
- Hikari
- Hikari Rail Star
- Kodama
- Sakura
- Mizuho
- Tsubame
Tōhoku, Hokkaido, Yamagata and Akita Shinkansen
- Hayabusa
- Hayate
- Yamabiko
- Nasuno
- Aoba
- Komachi
- Tsubasa
Jōetsu Shinkansen
- Toki / Max Toki
- Tanigawa / Max Tanigawa
- Asahi / Max Asahi
Hokuriku Shinkansen
- Kagayaki
- Hakutaka
- Tsurugi
- Asama
Speed records
Traditional rail
Maglev
Competition with air
Compared with air transport, the Shinkansen has several advantages, including scheduling frequency and flexibility, punctual operation, comfortable seats, and convenient city-centre terminals.Shinkansen fares are generally competitive with domestic air fares. From a speed and convenience perspective, the Shinkansen's market share has surpassed that of air travel for journeys of less than 750 km, while air and rail remain highly competitive with each other in the 800–900 km range and air has a higher market share for journeys of more than 1,000 km.
- Tokyo – Nagoya, Tokyo – Sendai, Tokyo – Hanamaki , Tokyo – Niigata : There were air services between these cities, but they were withdrawn after Shinkansen services started. Shinkansen runs between these cities in about two hours or less.
- Tokyo – Osaka : Shinkansen is dominant because of fast and frequent service ; however, air travel has a certain share.
- Tokyo – Okayama, Tokyo – Hiroshima : Shinkansen is reported to have increased its market share from ~40% to ~60% over the last decade. The Shinkansen takes about three to four hours and there are Nozomi trains every 30 minutes, but airlines may provide cheaper fares, attracting price-conscious passengers.
- Tokyo – Fukuoka : The Shinkansen takes about five hours on the fastest Nozomi, and discount carriers have made air travel far cheaper, so most people choose air. Additionally, unlike many cities, there is very little convenience advantage for the location of the Shinkansen stations of the two cities as Fukuoka Airport is located near the central Tenjin district, and Fukuoka City Subway Line 1 connects the Airport and Tenjin via Hakata Station and Haneda Airport is similarly conveniently located.
- Osaka – Fukuoka : One of the most competitive sections. The Shinkansen takes about two and a half hours by Nozomi or Mizuho, and the JR West Hikari Rail Star or JR West/JR Kyushu Sakura trains operate twice an hour, taking about 2 hours and 40 minutes between the two cities. Again the location of the airports involved helps with the popularity of air travel.
- Tokyo – Aomori : The fastest Shinkansen service between these cities is 3 hours. JAL is reported to have reduced the size of planes servicing this route since the Shinkansen extension opened in 2010.
- Tokyo – Hokuriku : The fastest Shinkansen service between these cities is 2½ hours. ANA is reported to have reduced the number of services from Tokyo to Kanazawa and Toyama from 6 to 4 per day since the Shinkansen extension opened in 2015. The share of passengers travelling this route by air is reported to have dropped from 40% to 10% in the same period.
Shinkansen technology outside Japan
Existing
Taiwan
operates 700T Series sets built by Kawasaki Heavy Industries.China
The China Railways CRH2, built by CSR Sifang Loco & Rolling stocks corporation, with the license purchased from a consortium formed of Kawasaki Heavy Industries, Mitsubishi Electric Corporation, and Hitachi, is based on the E2-1000 series design.United Kingdom
EMUs were built by Hitachi based on Shinkansen technology for use on high-speed commuter services in Britain on the High Speed 1 line.Class 800 Bi-Mode trains were built by Hitachi for Great Western Railway and London North Eastern Railway.
Class 801 EMUs were built by Hitachi for London North Eastern Railway.
Class 802 Bi-Mode trains were built by Hitachi for Great Western Railway, TransPennine Express and Hull Trains.
Under contract
United States
In 2014, it was announced that Texas Central Railway would build a ~300-mile long line using the N700 series rolling stock. The trains are proposed to operate at over 320 km/h.India
In December 2015, India and Japan signed an agreement for the construction of India's first high speed rail link connecting Mumbai to Ahmedabad. Funded primarily through Japanese soft loans, the link is expected to cost up to US$18.6 billion and should be operational in about 7 years.This followed India and Japan conducting feasibility studies on high-speed rail and dedicated freight corridors.
The Indian Ministry of Railways' white-paper Vision 2020 submitted to Indian Parliament by Railway Minister Piyush Goyal on 18 December 2009 envisages the implementation of regional high-speed rail projects to provide services at 250–350 km/h.
During Indian Prime Minister Manmohan Singh's visit to Tokyo in December 2006, Japan assured cooperation with India in creating a high-speed link between New Delhi and Mumbai. In January 2009, the then Railway Minister Lalu Prasad rode a bullet train travelling from Tokyo to Kyoto.
In December 2013 a Japanese consortium was appointed to undertake a feasibility study of a ~500 km high-speed line between Mumbai and Ahmedabad by July 2015. A total of 7 high-speed lines are in planning stages in India, and Japanese firms have now succeeded in winning contracts to prepare feasibility studies for three of the lines.
The National High Speed Rail Corporation was incorporated in 2017 to manage all HSR related activities in India. Under its management, a High Speed Rail Training Institute is being developed with Japanese assistance in Vadodara, Gujarat. After the laying of the foundation stone for the Mumbai and Ahmedabad by the Prime Ministers of India and Japan in September 2017, work began on preparatory surveys along the route. The route consists of approximately elevated viaduct through 11 districts of Gujarat and four districts of Maharashtra, a deep-sea tunnel starting from BKC in Mumbai, and approximately of at-grade alignment near the other terminus at Sabarmati, near Ahmedabad. Most of the civil works for the elevated viaduct shall be handled by Indian companies, while the deep-sea tunnel at Mumbai will be handled by a Japanese consortium. BHEL of India and Kawasaki Heavy Industries of Japan have entered into a technology collaboration agreement to build and assemble the rolling stock in India. Other potential joint ventures are being explored under the patronage of NHSRC. The line is expected to be operational by 2023.
Proposed subject to funding
Thailand
Japan will provide Shinkansen technology for a high-speed rail link between Bangkok and the northern city of Chiang Mai under an agreement reached with Thailand on 27 May 2015. Total project costs are estimated in excess of 1 trillion yen. Several hurdles remain, however, including securing the funding. If the project is realized, it would mark the fifth time Shinkansen technology has been exported.Potential opportunities
Australia
A private organisation dedicated to aiding the Australian Government in delivering high speed rail: Consolidated Land and Rail Australia has considered purchasing Shinkansen technology or SC Maglev rolling stock for a potential Melbourne-Canberra-Sydney-Brisbane line. A business case has been prepared for the government by Infrastructure Australia, and was awaiting confirmation of the project within the 2018 federal budget.Ireland
As part of the Ireland 2040 infrastructural upgrade scheme, a high-speed rail network using Shinkansen technology is being investigated along the Cork-Dublin-Belfast axis, spanning the island of Ireland from north to south.United States and Canada
The U.S. Federal Railroad Administration was in talks with a number of countries concerning high-speed rail, notably Japan, France and Spain. On 16 May 2009, FRA Deputy Chief Karen Rae expressed hope that Japan would offer its technical expertise to Canada and the United States. Transportation Secretary Ray LaHood indicated interest in test riding the Japanese Shinkansen in 2009.On 1 June 2009, JR Central Chairman, Yoshiyuki Kasai, announced plans to export both the N700 Series Shinkansen high-speed train system and the SCMaglev to international export markets, including the United States and Canada.