Spanish frigate Santa María
Santa María is the lead ship of six Spanish-built s, based on the American design, of the Spanish Navy.
Laid down on 22 May 1982 and launched on 11 November 1984, the Santa María was commissioned into service on 12 October 1986.
All of these Spanish frigates have the length of the later Oliver Hazard Perry frigates, and have a wider beam than the US Navy design, and therefore able to carry more top weight. Fin stabilizers are fitted.Other units of class