St Dennis Junction


St Dennis Junction was in St Dennis, Cornwall.

1849 - 1960

The history of railway lines through the Cornish village of St. Dennis dates back as far as 1849. In that year, a tramway was opened linking the harbour in Newquay to areas where clay was - and still is - mined. This railway ran from Newquay, through the localities of Quintrell Downs, St Columb Road and St. Dennis.
On 14 July 1864 an Act of Parliament was obtained for the Newquay and Cornwall Junction Railway. Construction proved to be easier said than done and the 3.5 miles of broad gauge railway from the main line at Burngullow up to Nanpean finally opened on 1 July 1869.
Upon the opening of the Cornwall Minerals Railway line from Par to St Columb Road on 1 January 1879 it became possible for trains of china clay to travel to the harbours at Par and Fowey for onward shipping. At the same time, the old tramway from Newquay was rebuilt and extended to meet up with the line already at Nanpean.
On 23 May 1892 the line south of Nanpean was converted to the standard gauge used. Goods trains could now run through from St Dennis to Burngullow.
The section of railway from Parkandillick up to St. Dennis Junction closed in 1960. The track over this stretch was then lifted. All that remains at St. Dennis is an overgrown railway cutting plus a platform with fencing on it.
It is worth noting here that the name "St. Dennis Junction" describes the next destination from the junction as is customary on British railways. It is some way north of St. Dennis, nearer to the areas of St. Columb Road, Indian Queens and Toldish.

1960 - present

Since the link to the Par - Newquay railway was cut in 1960, the line from Burngullow up to Parkandillack has remained open for freight.
In 1986 a proposal was put forward, the terms of which would have been, as far as the railways were concerned:
This proposal did not progress. In their 2001-2006 Cornwall Local Transport Plan it was proposed to reignite this scheme with additions. The proposals of the 2001-06 CLTP scheme were:
What became of the 2001-06 CLTP scheme is currently not known. The main reason for closing the Par - St Dennis line was to remove the low road bridge on the A30 at Goss Moor, however alternative road improvements have since been completed. A new dual carriageway stretch of A30 has been built to the north of the old A30 and bridge. The old stretch of A30 under the low bridge is now a minor road and cycle path.