Suining–Chongqing railway


Suining–Chongqing railway is a high-speed railway connecting Chongqing and Suining, Sichuan as part of the Shanghai–Wuhan–Chengdu high-speed railway. It is also known as Suiyu railway, following the Chinese practice of combining the shortened version of the terminal city's name. It is a national grade I railway with two electrified lines, with a designed maximum speed of.

Overview

The railway has a total length of, of which is in Sichuan Province and within Chongqing Municipality. It is classed as a national railway grade I, with two electrified lines, designed for maximum speed of 250 kilometers. The second stage of the railway on December 31, 2012 officially launched operations.

History

Suiyu railway commenced with a ground-breaking ceremony on February 25, 2003. Stage one of track laying across the board was completed on April 23, 2005. Stage one was opened on April 1, 2006 after a total investment of 4.925 billion yuan. Suining–Chongqing railway is one of China's high-speed rail project pilot projects, building China 's first track test section for ballastless high-speed trains for a length of. The trial was commenced in September 2004, taking until January 2007 to complete the test.
During May 2005, Suiyu railway trains reached a top speed of in testing. The railway is part of Chengyu high-speed railway and achieved connection with the railway from Chengdu to Suining. The combined operating distance from Chongqing to Chengdu is only, the entire running time of about 2 hours. On September 26, 2009, at Chongqing North Railway Station started services bound for Chengdu with CRH1 Harmony EMU trainsets, allowing Southwest China to enter the high-speed rail era.
The second stage of the Suining–Chongqing railway line has a length of, of which is in Sichuan Province, in Chongqing Municipality. This saw the creation of Suinan South station and a new alignment from Aikawa to Shizhishan. Work on this upgrade commenced on January 18, 2009, with construction lasting for four years. This stage of the project was estimated to need a total investment of 4.81 billion yuan. Chongqing railway new tier on January 24, 2013, officially launched operation.