Summit (SMR) railway station


Summit is the southern, upper terminus of the Snowdon Mountain Railway, located within yards of the summit of Snowdon.
The line starts in the valley bottom at Llanberis at an altitude of. Summit station stands at, below the summit of the mountain, to which it is connected by a short stepped path.
The station opened with the railway on 6 April 1896, but both closed the same day following an accident. They reopened a year later, on 9 April 1897.
During the 1930s, many complaints were received about the state of the facilities at the summit and in 1934/5 a new station and building were erected in two phases. It was designed by Sir Clough Williams-Ellis and included rooms for visitors and a café. The other operators were bought out and the ramshackle collection of wooden buildings on the summit was cleared.
The station operated until 2005 except during World War II. In 2006 the station and associated buildings were demolished for complete rebuilding, passenger services terminating at Clogwyn until the new visitor centre of Hafod Eryri and station were opened by Welsh First Minister Rhodri Morgan on 12 June 2009.
The station has two platforms.