Sydney Harbour Tunnel


The Sydney Harbour Tunnel is a twin-tube road tunnel in Sydney, Australia. The tunnel was completed and opened to traffic in August 1992 to provide a second vehicular crossing of Sydney Harbour to alleviate congestion on the Sydney Harbour Bridge. It is one of two tunnels under the harbour, the other being a set of rail tunnels for the Sydney Metro.
The tunnel joins the Warringah Freeway at North Sydney, and the Cahill Expressway at the entrance to the Domain Tunnel. It has two lanes in each direction, and runs at an angle of approximately thirty degrees to the Sydney Harbour Bridge, which has eight lanes, with a tidal flow operation. In 2008, the tunnel was carrying around 90,000 vehicles per day.

Construction

The tunnel is made up of three sections: twin land tunnels on the north shore, twin land tunnels on the south shore and a immersed tube structure. The tunnel falls about from the northern entrance and about from the southern entrance to its deepest point, below sea level. The construction was undertaken by Thiess Contractors.
The IMT structure consists of eight precast concrete units. The units were constructed over away in a casting basin at Port Kembla and then towed to Sydney Harbour. A trench was dredged before the arrival of the IMTs and then the IMTs were lowered into the trench by a system of pontoons and control towers. After the IMTs were in place the trenches were backfilled and then a rock armour was placed over the top to protect the units against marine hazards, such as anchors or sinking vessels. The land tunnels were constructed by a combination of driving and cut-and-cover techniques, designed to be strong enough to withstand the impact of earthquakes.
The northern end pylons of the Sydney Harbour Bridge were altered to allow for air exhaust from the tunnel to rise over the harbour. Bradfield Park on the northern side of the bridge also has air intakes.
Fresh air is drawn by an underground ventilation station on the north shore and is pumped to all sections of the tunnel through vented ducts. The air supply uses fourteen axial flow fans, each up to in diameter. The exhaust uses sixteen fans that draw exhaust air through two underground ducts from the tunnel ventilation station and transfer the air to the top of the pylon. They can expel it at up to – equivalent to changing all the air in the tunnel every two minutes with the capability of running in reverse in an emergency and all fans are rated for smoke extraction. Each of the fans has a duty of. The testing of the fans was one of the most comprehensive ever, covering flowrate and pressure, power measurements, sound levels, bearing vibration, x-raying of all impeller components, high-temperature tests at for 2 hours, impeller strain, and 24-hour run tests for reversals.
The tunnel was opened to the public to walk through from North Sydney to Eastern Sydney on 30 August 1992. The proceeds of the tickets sold for this event were donated to the Royal Institute for Deaf and Blind Children. The tunnel opened to traffic on 31 August 1992.

Operator

The Harbour Tunnel is a partnership between the Government of New South Wales and private investors by tender. Transfield Pty Limited and Kumagai Gumi formed a 50/50 joint venture company which constructed the tunnel under contract; with a 30-year operating contract, including revenue collection and maintenance, from 1992 until 2022. As a result of the 1997 separation of assets of Transfield and the creation of the Tenix group, the ongoing thirty-year operating contract for management of the tunnel is split between Kumagai Gumi, Transfield and Tenix.
The total construction cost of the project was A$554.25 million. $A223 million of this is an interest-free loan from the NSW Government, to be repaid at the conclusion of the operating contract in August 2022 when the tunnel will be transferred to public ownership. The government has also guaranteed an Ensured Revenue Stream to the operator, whereby it makes up the shortfall between toll collections and the guaranteed amount. As toll revenues have been below the projected amount, in 2008 for example, the government paid the operator $58.9 million, with the total amount forecast to be $A1.1 billion from 2008 to 2022. The NSW Auditor-General has also raised concerns that the tunnel's expenses may make the operating company default on the $A223 million loan, however the government remains confident in it.

Tolling

In 2006, the New South Wales Government announced that all cash tolls on the Sydney Orbital Network would cease by 2010. The Sydney Harbour Tunnel went fully electronic in July 2007 with both e-TAG and e-pass video tolling arrangements in use, similar to technologies used by the Westlink M7, Cross City Tunnel and the Lane Cove Tunnel. This measure has substantially eased the traffic jams heading towards the electronic gantries, and providing increased convenience and time savings. The Sydney Harbour Tunnel attracts a varying toll of between A$2.50 and A$4.00, depending on the time of day. The toll is levied on the southbound approach to the tunnel entrance.