The Syretsko–Pecherska line is the third line of the Kiev Metro, first opened in 1989. It extends the metro system southeast along the right bank of the Dnieper River before crossing it on a covered bridge and then east from there. The northern section extends further northwestwards. The line is one of the newest and shows some post-independence decorative motifs. Technically, it is also a great development, with most of the platforms longer and wider than older sections and with some stations having provision for disabled access. This line is coloured green in the maps.
In addition, there is an unfinished station named Lvivska Brama between Lukianivska and Zoloti Vorota and a derelict Telychka station, located between Vydubychi and Slavutych.
Name changes
Transfers
Rolling stock
Initially the line shared the Obolon depot with the Kurenivsko–Chervonoarmiyska line. On August 23, 2007, construction of the dedicated Kharkivska depot was complete, to which the Syretsko–Pecherska line trains have been transferred. 27 five-carriage trains are assigned to this line. Most of them are of type 81-717.5/714.5, built in the late 1980's. But also some trains of type 81-540.2K/541.2K and the 81-7021/7022.
Recent developments and future plans
Extensions
On the far end of the Pechersky radius, a project that has been approved and finalised exists to bring the line from its current terminus Chervony Khutir to the Darnytsia station of the Sviatoshynsko–Brovarska line with six stations and one depot. This extension will connect the new Darnytsia Railway Station and also create a major redevelopment into the eastern districts of Kiev. The stations include: Promyslova, Vulytsia Horbunova, Darnytsky Vokzal, Prazka, Leninhradska Ploscha and Darnytsia. At the present time, only the station Chervony Khutir and the urgently needed №3 depot Kharkivske are under construction. Both were originally planned to open in August 2007, but now the station has been delayed until 2010. On the opposite end of the line, on the Syretsky radius, another extension with the stations Mostytska, Prospekt Pravdy, Vynohradar and Marshala Hrechka were to open by 2020, along with a new depot. This extension will bring the line to the city's northwestern borders and will connect the distant neighbourhood of Vynohradar. In November 2018 Kiev Metro signed a contract for the build of the Mostytska and Prospekt Pravdy subway stations and a branch line toward the Vynohradar station, the deadline for completion was set for 2021.
Ghost stations
One of the most notable facts that the line is known for is that stations for which the construction had begun were deliberately passed over for later openings. This happened often with the lack of financing, but the need for continuing to extend the system. One of these stations were Pecherska which opened six years after the extension which carried it. At present there are three stations that remain unfinished on the line, with various prospects of opening. Lvivska Brama is the first of such, a deep underground station that exists in a half-built state, with the underground part structurally complete and even partially decorated, and lacking an escalator tunnel and a lobby. For many years it appeared on the map as under-construction with no actual work taking place, the scheduled opening year being shifted perpetually. Telychka is another unopened station, on the right bank of the Dnieper River, that is sealed off completely, with no illumination at most times, and has remained such since the tunnels were built back in 1990. It was not opened because there was no need for it, since the Lower Telychka industrial area quickly deteriorated with the end of the Soviet Union. However, there is a proposed re-development plan of the area and, as the station is sub-surface and structurally complete, it will not be difficult to finish and open the station should a need arise. Finally, between Lukianivska and Dorohozhychi, a provision exists for another deep station, the project name for which is Vulytsia Hertsena. Currently, there are no plans to complete the station at all, due to the difficulty in building a deep-level station on an existing stretch being very costly, as well as impractical, particularly in the light of more important projects such as Podilsko–Voskresenska and Livoberezhna lines, which will not be completed until 2025 at the least. All three stations satisfy a regulatory requirement of having stations no farther than 2000 m apart. Also, these stations host traction substations, ventilation and drainage equipment as all ordinary stations do. Currently, only Lvivska Brama is manned 24/7 with a station agent, the others being visited by maintenance personnel only occasionally.
Other projects
Other projects include a general upgrade of stations, in particular the construction of a second entrance to the Druzhby Narodiv station and a complex repair of Lukianivska which suffers from hydroisolation problems.