Tamiami Trail


The Tamiami Trail is the southernmost of U.S. Highway 41 from Florida State Road 60 in Tampa to US 1 in Miami. A portion of the road also has the hidden designation of State Road 90.
The north–south section extends to Naples, whereupon it becomes an east–west road crossing the Everglades. It becomes Southwest 8th Street in Miami-Dade County, famous as Calle Ocho in the Little Havana section of Miami, before ending east of Miami Avenue as Southeast 8th Street at Brickell Avenue in Brickell, Downtown Miami.

History

Construction and early designations

The idea for a Trans-Peninsula Highway that connected the west and east coasts of Florida originated in April 1915 at an informal meeting in Tallahassee between then president of the Fort Myers Chamber of Commerce, Francis W. Perry, and James F. Jaudon of Miami after which they returned to their respective cities and began advocating for the construction of what was originally called the Miami to Marco Highway. At a subsequent meeting in Orlando, on June 10, 1915, of what became the Central Florida Highway Association, Perry introduced a resolution which was seconded by Tampa's E. P. Dickie, for the construction of the "Tamiam Trail", which was to run from Tampa through Riverview, Bradenton, Sarasota, Arcadia, Punta Gorda, Fort Myers, Bonita Springs, Estero, Naples, Marco, then east directly across the state to Miami. Perry traced the route of the proposed Tamiami Trail on a map and accorded the credit for coining the word "Tamiam" to Dickie, although D. C. Gillett, who was president of the Tampa Board of Trade later claimed to have originally suggested the name.
On August 3, 1915, the Board of Commissioners of Dade County agreed to fund part of the survey for the road by providing their county engineer. Two days later a team surveyed the first, and the work on the Tamiami Trail had officially begun. The team consisted of Hobart Crabtree, James F. Jaudon, L. T. Highleyman, Van Cleve Hallowes, Wallace Culbertson, Walter Ludlam, J. T. Albritton, A. W. Frederick and one helper.
At the time, Lee County was a much larger county. In 1919, for financial reasons, Lee County was unable to complete its portion of the Tamiami Trail. Jaudon had already purchased of land, mostly in Monroe County. His company, the Chevelier Corporation, came to the rescue and offered to build a link of the highway through its holdings in Monroe County if Dade and Lee counties would agree to re-route the Tamiami Trail through Monroe County. The proposal was accepted; the Chevelier Corporation began laying out a new route for the road and in 1921 began construction on the new segment of the Tamiami Trail. This segment is today known as Loop Road.
In 1922, the State of Florida ran out of construction funds for the east–west portion. The following year, Barron Collier, an advertising mogul who had recently diversified his holdings by investing in various types of businesses and millions of acres of southwest Florida wilderness, pledged that he would bankroll the completion of the Tamiami Trail; in return, the State legislature would establish a new county and name it after him.
So in 1923, Collier County was created out of the southern portion of Lee County. Almost immediately contention arose over the change of the route. The sponsors of the new county advocated for the original route, which was completely inside the boundaries of Collier County, and the State Road Department agreed with Collier County. Even so, the Board of County Commissioners of Dade County supported the Chevelier segment, since so much money had already been invested, and only a few miles of road were left to be completed.
Despite this protest, the State Road Department reinstated the original route of the Tamiami Trail to be completed, and the already completed portion of roadway in Monroe County was accepted as a "South Loop" of the Tamiami Trail. As construction of the north–south section resumed, Collier hired A. R. Richardson to be the head engineer of the Naples-to-Miami section. A few months later, A. W. Frederick replaced Richardson, who returned to the Everglades Drainage District.
Construction started on the east–west stretch in 1923. An east–west canal was created using explosives; the fill dirt was used to construct the roadway.
In 1926, both the north–south section and the east–west stretch were designated U.S. highways. Although the Trail was intended to be one road, the two sections received two different numbers: as each section was completed, the north–south portion received US 41 signs, and the east–west stretch was designated US 94 upon completion. In addition, both sections south of Fort Myers received the State Road 27 designation. North of Fort Myers, it was designated State Road 5.
While a 1927 Rand McNally map indicated the southern terminus Fort Myers, US 41 signs had already been erected on the completed segment in late 1926; US 94 signs made their appearances when the final section was completed in April 1928. The Tamiami Trail took 13 years, cost $8 million USD, and used 2.6 million sticks of dynamite in its construction. The Tamiami Trail officially opened on April 26, 1928.

US 94

Upon the completion of the Tamiami Trail, U.S. Highway 94 extended from the intersection of Ninth Street South and Fifth Avenue South in Naples to the intersection of South Eighth Street and Brickell Avenue in Miami. At the time it was considered a major achievement of engineering that was the only route from Naples to the southeastern coast of Florida.
In 1945, a restructuring of Florida's State Road system resulted in the removal of the SR 27 signs from US 94 and the assignment of the hidden Florida Department of Transportation designation State Road 90, which continues to be applied to the east–west stretch of highway to this day. The north-south section was assigned the designation State Road 45.
In 1949, the US 94 signage was replaced with US 41 signs, over a decade after AASHO modified its guidelines to discourage short U.S. Highways that are entirely within one state.

After US 94

In the 1950s, the newly configured US 41 was extended eastward and northward, first to downtown Miami along US 1 in 1950, then to Miami Beach along US 1 and SR A1A in 1953. In 1965, US 41 was rerouted as a bypass along unsigned SR 45A around Venice Gardens, while Business US 41 signs grace the former alignment.
This configuration of US 41 south of Tampa remained intact until the U.S. Highway was truncated to US 1 and Southwest Eighth Street in Miami in 2001—the historic eastern terminus of US 94, former SR 27, and current SR 90.
While US 41 and SR 90 have not significantly changed since the 1960s, its importance to motorists of southeastern Florida has changed since the opening of Alligator Alley to the north in 1968. Since then, traffic on the Tamiami Trail across the Everglades has lessened significantly, while urban sections of the road are now often congested.
In 1968, the Dade County Port Authority began construction on what was to become the world's largest airport. The Miami Jetport was located west of Miami, just across the Collier County line. It was to be a six runway supersonic airport. The project would also transform the Tamiami Trail into a multi-lane expressway. Conservationists were worried about the impact an airport that size would have on the environment of the Everglades and Big Cypress. After several court hearings, a ban was placed upon further development. The widening of Tamiami Trail as a part of the Jetport had been stopped. One runway had already been completed; so the runway was allowed to be used as a flight training center. The runway remains today as a part of the Dade-Collier Training and Transition Airport.
Also in 1968, construction of an extension of Interstate 75 south from Tampa to Miami was started, with an eye toward routing the freeway along an upgraded Tamiami Trail from Naples to a soon-to-be completed SR 836 whereupon it would continue on the east–west highway to its intended terminus at an interchange with I-95. Plans for the I-75 extension changed for two reasons: Alligator Alley needed upgrading, as the then-narrow toll road was dangerous to both motorists and wildlife alike, and SR 836, with its left exits and narrow lanes, was not being built to Interstate Highway standards. As a result, construction for a rerouted I-75 in southern Florida began in 1974, now with I-75 using Alligator Alley instead of US 41 to cross the peninsula. The configured Interstate would not be completed for another 19 years.
Since then, the Tamiami Trail has been designated a National Scenic Byway by the United States Department of Transportation for its unique scenery in the Everglades and the Big Cypress National Preserve.

Future

Plans

In 1928, the Tamiami Trail was considered a feat of engineering, although there appears to have been minimal consideration of the potential damage to the Everglades by the roadway and the Tamiami Canal. Both have acted as a dam to block water flow from Lake Okeechobee to Florida Bay at the southern tip of the peninsula. As a result, the Everglades—the "River of Grass"—has had its water flow greatly diminished over the years, resulting in a devastating effect on the ecology of the region. In the 1990s, a few canals were filled and additional culverts were constructed under US 41 to help regulate water flow.
Yet, according to the United States Army Corps of Engineers, this was only a partial solution to the problems of the Everglades and the Tamiami Trail. In 2003, after considering a variety of plans involving the rebuilding of US 41/SR 90, the Corps recommended that a causeway be built near the Northeast Shark Slough northeast of Everglades National Park, all road fill removed that would otherwise be adjacent to the bridge, the 57 culverts that are already in place maintained, and the appropriate water flow rate maintained under the non-causeway portions of the Tamiami Trail crossing the Everglades. The proposed causeway is being called the Everglades Skyway by the Sierra Club, Audubon Society, World Wildlife Fund, and other organizations in an Internet-based effort to lobby Florida and United States government officials for project construction money. In December 2009, construction began on a project to lift a portion of the road to allow the more natural water flow into the southern Everglades. At the Everglades Foundation's America's Everglades Summit held in mid-May 2010, Assistant Secretary of the U.S. Department of Interior, Thomas Strickland, revealed that the Interior Department's National Park Service released a draft Environmental Impact Statement recommending an additional of bridging the Tamiami Trail. The Everglades Foundation is a group that supports the Tamiami Trail bridging and dedicated to Everglades restoration.
In 2013, Florida announced a $90 million commitment to elevate of the road to allow natural drainage into the Everglades and Everglades National Park.
In June 2019, a $60 million grant was announced by the Federal Highway Administration to Everglades National Park through the Nationally Significant Federal Lands and Tribal Projects program to complete the Tamiami Trail Next Steps project, intended to allow more north-to-south water flow into the Everglades. This grant matches a $43.5 million commitment by the State of Florida for the raising and reconstruction of the remaining 6.5 miles of the eastern Tamiami Trail roadway.