is very popular on Tara River. It is also one of the most popular things to do in Montenegro. The one-day rafting route, from Brstnovica to Šćepan Polje is 18 km long and it takes Among the attractions of the area is Đurđevića Tara Bridge, on the crossroads between Mojkovac, Žabljak and Pljevlja. Rafting starts at Splavista from where one starts the adventure 100 km long in the most beautiful and exciting part of canyon. Already at the beginning the Tara, the waterfalls of Ljutica are seen and then, the rafter passes under the high Đurđevića Tara Bridge. The old Roman road can then be seen as rafters pass through the Lever Tara, "Funjički bukovi", and "Bijele ploče". "Nisovo vrelo" is the deepest part of the canyon at high. Further is the bottom of the mountain top, "Curevac", that rises above Tara as its "eternal guardian". Rafting trips meet the waterfalls of Draga and then pass through the Radovan luka, the "Canyon of Sušica", "Tepački bukovi", "Brstanovički bukovi" and "Bailovica sige", ending at Sćepan Polje. In 2005, the European Championships in Rafting were held on the Vrbas and the Tara rivers in Bosnia and Herzegovina. According to the International Rafting Federation, the event was hugely successful. In May 2009 the World Rafting Championships were held again in Bosnia and Herzegovina on the Vrbas and Tara rivers.
Planned damming
The governments of Montenegro and Republika Srpska entity in Bosnia and Herzegovina had plans to flood the Tara river and considerable part of its gorge, with the construction of at least one and possibly more hydroelectric dams on the Drina and possibly the Tara itself. A plan to construct dams in Bosnia and Herzegovina on the Drina river, has never been shelved completely. One at Buk Bijela village, some 15 kilometers downstream of border with Montenegro and the confluence of the Tara with the Piva river, the Buk Bijela Hydro Power Plant, although apparently abandoned in April 2005, after several successful protests by environmental activists in favor of preserving the both rivers and the canyon, is now being seriously reconsidered, as recently as 2018, and concessions is already given to a company "HE Buk Bijela" created in Foča in 2018, for this purpose. Also, although much older, signed in September 2006, a cooperation agreement between the Slovenian company Petrol and the Montenegrin company "Montenegro-bonus" to plan a construction of a 40-60 megawatts hydroelectric power plant, despite all efforts to protect the gorge, is still considerable environmental threat for the Drina and the Tara.