Tewksbury Memorial High School


Tewksbury Memorial High School is a suburban public high school located at 320 Pleasant Street in Tewksbury, Massachusetts, United States. Serving grades 912, it is the only public high school in the town. Its total enrollment for the 2018-2019 school year was 916 students.

Demographics

According to Massachusetts Department of Elementary and Secondary Education annual statistics, for the 2018-2019 academic year, the enrollment demographic distributions for race, gender and grade at Tewksbury Memorial High School are as follows:
RacePercent of School
African American2.7
Asian3.7
Hispanic3.9
White88.5
Multi-Race, Non-Hispanic1.1

GradePupils EnrolledPercentage
922624.67
1021623.58
1122624.67
1224126.31
SP*70.76

* SP = Special Education Beyond Grade 12

Athletics

The Redmen are a member of the Merrimack Valley Conference. The MIAA classifies them as a Division 2 school for most sports. Significant rivals include conference foes Andover, Billerica, Central Catholic, and Chelmsford. Their biggest rival is neighboring Wilmington of the Middlesex League, whom the football team plays every Thanksgiving.
In 2013, the football team went undefeated at 13-0 and won the Division 3 State Championship, defeating Plymouth South by a score of 42-14.
Other than their football team, TMHS's boys' soccer team, field hockey team, track, and XC team has seen recent success.
Due to the school being placed on warning status, the town voted to build a new high school next to the old one. The school cost $65 million, a majority funding athletic facilities, and opened in August 2012. The gymnasium seats 1,225 fans, featuring one main basketball court and three intermediate courts that can be separated for tournament or recreational league use. The gym is used for all future TMHS graduations, despite the adequately sized and redundant football field just outside. The auditorium/theater features seating for 690 and the stage has a spacious backstage area for work on theatrical productions. Some of the more distinguishing characteristics of the complex include "airport style" restrooms for students, shared "prep" areas behind science and art classrooms, a TV studio untouched until 2014, and two large rooms that can accommodate three or four classes meeting together. The entire complex features copious amounts of glass for maximum natural lighting. This ties in with numerous "green" features that add to the energy efficiency of the school and guarantee an additional two percent reimbursement from the state. Freshman Orientation was on August 27, 2012, and the first official day of school in the new building was on August 28, 2012. As of September 2012, the new high school was finally complete, though the exterior features including the parking lot and track and field were delayed for a while longer. Demolition for the old high school began in mid-August 2012 and finished well into 2013.