Tienlun Dam
Tienlun Dam is a concrete gravity dam on the Dajia River in Heping District, Taichung, Taiwan. Built from 1952 to 1956, the dam is the fourth in a cascade of hydroelectric dams along the Dajia River, located upstream from the Ma'an Dam and downstream of the Kukuan Dam.
The dam is high and long, with a storage capacity of of water. It supplies water to a power station consisting of one 105 megawatt turbine and four 22.5 MW turbines for a capacity of 195 MW, generating 557 million kilowatt hours per year.