Tinkers Creek Aqueduct


Tinkers Creek Aqueduct is an aqueduct that was constructed to bridge the Ohio and Erie Canal over Tinkers Creek near its confluence with the Cuyahoga River in Valley View, Ohio. It is a relatively rare surviving example of an Ohio and Erie Canal aqueduct. It was originally constructed in 1825-1827 by, and re-built due to flood damage in 1845 and 1905. Tinkers Creek Aqueduct was included in a National Historic Landmark district established in 1966, and it was separately listed on the National Register of Historic Places in 1979. The original Tinkers Creek Aqueduct was a wood plank, steel truss, and Ashlar-sandstone structure constructed in 1827, south of the present aqueduct's location. Cuyahoga River and Tinkers Creek flooding caused continual damage to the original aqueduct, so successive structures were built in 1845 and 1905 in the present location. Today, Tinkers Creek Aqueduct is the only aqueduct which remains of the four original aqueducts in the Cuyahoga Valley. Of Furnace Run Aqueduct, Mill Creek Aqueduct, Peninsula Aqueduct, and Aqueduct; Mill Creek Aqueduct, of newer construction, is the only aqueduct which still carries Ohio and Erie Canal water. After 102 years of flooding, weathering, and deterioration, Tinkers Creek Aqueduct was removed in 2007. The National Park Service is currently working on Phase II of the project to reconstruct it from newer materials.

Statistics

The Tinkers Creek Aqueduct is a contributing structure on the NHL portion of the canal and continues to deteriorate rapidly. Due to the advanced state of decay, the aqueduct structure and the associated towpath Trial bridge will be removed and eventually replace with a newer aqueduct and bridge. Phase 1 of the project will involve removal of the existing aqueduct and Towpath Bridge, installation of a new Towpath Bridge, installation of temporary steel pipes to carry the canal water over the creek, restoration of portions of the sandstone abutment walls, and installation of a temporary high-water overflow structure. A later phase will include replacement of the aqueduct structure with a new design and restoration of the existing sandstone center pier and remaining abutment walls. Phase 1 is to begin in FY 2007. The increased numbers of flood events in recent years has caused significant damage to the river and stream banks which potentially threatens the canal basin. Ongoing monitoring and stabilization of river and stream banks will continue as needed.

Flooding

The aqueduct and surrounding area are subject to flooding by the Cuyahoga River and Tinkers Creek.