The Tupolev Tu-85 was a Soviet prototype strategic bomber based on the Tu-4, an unlicensed reverse engineered copy of the Boeing B-29 Superfortress. It was the ultimate development of the B-29 family, being over 50% heavier than its ancestor and had nearly double the range. Only two prototypes were built before the program was cancelled in favor of the Tupolev Tu-95 bomber which was much faster and had the same range.
Development
Neither the Tu-4 nor the Tupolev Tu-80 were true intercontinental strategic bombers as they both lacked the range to attack the United States from bases in the Soviet Union and return. The Tu-85 was designed to achieve the necessary range by use of more powerful and fuel-efficient engines, a redesigned wing to increase the lift/drag ratio and the addition of more fuel. A large number of engines were considered before settling on the Shvetsov ASh-2K, essentially two air-cooled ASh-82radial engines paired together and the liquid-cooled Dobrynin VD-4K six-bank inline engine, similar in configuration to the failed German Junkers Jumo 222, for a format of engine/airframe proposed much earlier during World War II's later phases in late July 1943, for the Heinkel firm's Amerikabomber never-built contract contender. Both proposed engine designs for the Tu-85 were given turbochargers and power-recovery turbines which converted them into turbo-compound engines. The Shvetsov design was preferred, but was not yet mature enough for use, and the VD-4K was selected. A lot of effort was put into refining the design of the wing in collaboration with TsAGI. It had an aspect ratio of 11.745 and a taper of 2.93 for optimum lift at high-altitudes. The Tu-85 carried of fuel in 48 flexible tanks. Much of the armament and equipment was derived from those of the late-model Tu-4, including the four remotely-controlled and turrets and the tail turret, each with two Nudelman-Rikhter NR-23 cannon. But the Tu-85's tail turret had Argon ranging radar and each of the two bomb bays was enlarged to hold a FAB-9000 bomb. Actual design work began in August 1948 and was ratified by a directive from the Council of Ministers dated 16 September that required the first prototype to be ready for manufacturer's tests in December 1950. Construction of the first aircraft began in July 1950 and was completed in September. It first flew on 9 January 1951 and the manufacturer's tests lasted until October 1951. On 12 September the first prototype flew with a bombload of, landing with enough fuel remaining to have covered. The second prototype, sometimes referred to as the 85D or 85/2, incorporated the lessons learned from the first aircraft, including revision and reinforcement of the airframe and a variety of changes to its equipment and systems. It was first flown on 28 June 1951 and its trials lasted until November 1951. Series production was approved on 23 March 1951 at three factories where it would succeed the Tu-4 on the production line, but this was reversed later in the year and the program was cancelled: during the Korean War Soviet MiG-15s brought down many US B-29 bombers, showing that there was no future for piston aircraft in combat use. Priority was given to the higher-performance turbopropTu-95 'Bear', as its own turboprop powerplants, the TV-12 prototype series for the Kuznetsov NK-12 turboprops that power the Tu-95 to this day, were already generating 12,000 shp as early as 1951.