Type 214 submarine


The Type 214 is a diesel-electric submarine developed by Howaldtswerke-Deutsche Werft GmbH. It features diesel propulsion with an air-independent propulsion system using Siemens polymer electrolyte membrane hydrogen fuel cells. The Type 214 submarine is derived from the Type 212, but as an export variant it lacks some of the classified technologies of its smaller predecessor, the most important of which is probably the non-magnetic steel hull, which makes the Type 212 submarine difficult to detect using a magnetic anomaly detector.
Due to improvements in the pressure hull materials, the Type 214 can dive nearly 400 meters. It can also carry food, fresh water and fuel for 84 days of operation.
The Republic of Korea Navy has ordered nine Type 214 submarines, designated as Son Won-Il-class, to be built in Korea by Hyundai Heavy Industries and Daewoo Shipbuilding & Marine Engineering; three first batch models had entered service since 2007, and six second batch models will enter service from 2012.
A contract to build four boats for the Hellenic Navy was signed 15 February 2000 and a fourth unit was ordered in June 2002. The first boat was built at HDW in Kiel, Germany and the rest at the Hellenic Shipyards Co. in Skaramangas, Greece. The Hellenic Navy named them the Papanikolis-class.

General characteristics

Turkey

The first request by the Turkish Naval Forces was made in 2009 and considered to be delivered in 2014. However, due to delay, a new contract was signed in 2016 and it is planned to be delivered in 2020.
The Turkish Navy had commenced negotiations with HDW for six licence-built Type 214 class air-independent propulsion submarines. According to the Undersecretariat for Defence Industries of the Turkish Government these submarines will be produced with maximum local content at Gölcük Naval Shipyard in Kocaeli, Turkey.
On 2 July 2009, HDW and the Turkish Ministry of Defence entered into an agreement for the licensed production of six platforms. The agreement was the largest defence acquisition project in Turkey at the time after the firm order for 116 F-35 fighters at a cost of in excess of $10 billion. Ankara hoped that its advanced, locally produced and highly modified Type 214 submarines will enter into service by 2015. Defence Minister Vecdi Gonul stated that "Turkish industrial participation in the project would be worth around 80 percent of the total value of the deal".
As the Turkish Type 214 will have a significant amount of Turkish indigenous systems on board, this variant of the Type 214 will be known as the Type 214TN. HDW will preassemble structural and mechanical parts of the submarine in Germany, or classified elements such as the fuel cells and propulsion system and will then ship them to Turkey. All electronic and weapon systems will be of Turkish production.
On 1 July 2011, the 2 billion euros order for six U 214 submarine material packages placed with ThyssenKrupp Marine Systems by Turkey entered into force with receipt of the advance payment. This enabled ThyssenKrupp to begin executing the order. The order was designated to contribute to securing employment at HDW in Kiel, as well as at many subcontractors in Germany and Turkey, for the next ten years. Yet, recently Turkey has received around 2 Million euros compensation from ThyssenKrupp due to delayed manufacturing of the Type214TN. Possible reason for this delay is Turkeys demand for in-house developed software within the submarines.

Portugal

In 2005 Portugal awarded a contract to Howaldtswerke-Deutsche Werft for two Type 214 submarines, which were delivered in 2010.

Republic of Korea

The South Korean Son Won-Il U214-class submarine is equipped with a SPHINX-D Radar System supplied by Thales Defence Deutschland GmbH. It uses an additional pulse transmitter in the top of the mast. The combination of high power pulse radar and a very low power LPI transmitter is very effective for submarines. During surface operations, the boat sails with an open pulse fingerprint for ESM systems, but within a secret mission the operator switches to LPI mode. The boat remains invisible to others. Total of 9 are planned and 8 are in active duty. South Korea ordered its first three KSS-II/ Type 214 boats in 2000, which were assembled by Hyundai Heavy Industries. The Batch 2 order will add six more submarines to the Navy, to be built by Daewoo Shipbuilding & Marine Engineering.
, Republic of Korea
In March 2008, it was reported in the media that the first Type 214 submarine of the Republic of Korea Navy suffered from defects related to excessive noise from the screw, according to anonymous sources. Later ROKN denied the report. There were no further reports of such noise problems in succeeding South Korean Type 214 submarines. The first three Type 214 submarines of South Korea were built by Hyundai Heavy Industries. In August 2008, South Korea signed another contract with HDW for six more Type 214 submarines. The Batch 2 order will add six more submarines to the Navy, to be built by Daewoo Shipbuilding & Marine Engineering. Hong Beom-do, a specialized guided missile submarine was launched on 7 April 2016.

Greece

The Hellenic Navy ordered four Type 214 submarines to be known as the Papanikolis class. The first, Papanikolis, was built in Germany; the following three were scheduled for construction at HDW's Hellenic Shipyards in Greece. In December 2006, StrategyPage reported that Papanikolis was found to have numerous technical problems. Among the reported problems with the submarine were excessive propeller cavitation, overheating of the air-independent propulsion system's fuel cells, and excessive rolling in bad weather when surfaced. Seapower magazine reported the Hellenic Navy refused to accept Papanikolis; additional problems noted were inadequate air-independent propulsion system output power, inappropriate periscope vibration, sonar flank array problems and seawater leakage into the ship's hydraulics.
The Hellenic Navy officers in charge of the testing program at the Kiel shipyards in Germany made their case clear in a 2007 investigative journalism program called "Neoi Fakeloi" on Skai TV. Retired Rear Admiral M. Simionakis, who had been in charge of the Papanikolis program for the navy, told the interviewer that the manufacturer had made two attempts to fix a severe balance problem in the submarine, including shifting 21 tons of material from the top to the bottom, yet the vessel continued to heel as much as 46 degrees in sea trials. Photographic evidence of the severe heeling was presented. In the same TV program, the officer replacing Simionakis in Kiel, Capt. K. Tziotis, listed seven ongoing, serious problems with the vessel, including balance problems when traveling on the surface, problems with the AIP system, problems with the weapon system, problems with the periscope, and problems with flooding.
For its part, TKMS, the German shipbuilder of Type 214, has asserted that it solved all the boat's technical problems in 2006 and claimed the Greek Navy's continuing complaints about Papanikolis technical condition are just a ploy to justify a price reduction. Therefore, TKMS refused to deliver the boat to the Greek Navy until all debts were paid and Papanikolis remained in Kiel harbor. Despite this position by TKMS, the Hellenic Navy officers in charge of the submarine delivery have repeatedly stated there are problems with Papanikolis. In October 2008, Papanikolis conducted a new round of trials, which showed that the excessive rolling problem had finally been fixed. The rest of the problems are considered solved. According to the Greek defence press, acceptance of the vessel was imminent. The second boat, Pipinos, was officially launched on 6 October 2014 and passed through Greek harbour acceptance trials in Elefsina.
On September 21, 2009 TKMS announced that the contract with the Greek Navy for all four submarines had been cancelled due to country's arrears of more than 520 million Euros. TKMS began seeking arbitration to resolve the matter.
On October 27, 2009 the Greek Ministry of Defence confirmed that they intended to accept the three boats built in Greece. The Greek Papanikolis U214 class is equipped with a hoistable radar mast which does not penetrate the pressure hull of the submarine. In the top of the radar mast the radar transmitter is installed. This transmitter is part of the SPHINX Radar System supplied by Thales Defence Deutschland GmbH in Kiel. The radar sensor is a FMCW transceiver which can't be detected by ESM systems in medium terms. This technology is so called LPI radar, which means "Low probability of intercept". The transmitting power is lower than the power of a mobile phone but the resolution more precise compared to high power Pulse radar. Thales SPHINX radar is a tactical radar, designed for submarines. Greece ordered four submarines and paid six times the list price

Failed bids

Pakistan

In 2008, the Pakistan Navy entered in negotiation of possibly purchasing three Type 214 to be built in KESW through a technology transfer, and the HDW CEO Walter Freitag confirming and reportedly telling the news media in Pakistan during the IDEAS 2008 convention that: "The commercial contract has been finalised up to 95 per cent."
It was reported that the first Type 214 diesel-electric submarine would be delivered to the Pakistan Navy in 64 months after signing of the contract while the rest would be completed successively in 12 months. After wavering for over two years, Pakistan dropped out from this deal when successfully negotiating with China to develop and design Eight Type 039A submarine that features the AIP technology with a complete transfer of technology to be built in Pakistan.

Vessels by nation