After fit out and shake down training, she began a series of Western Pacific deployments that made up the bulk of her career. Early deployments were in Vietnam's waters. Later deployments supported US Naval forces in the Persian Gulf. In 1978 The USS White Plains was struck by the USS Mount Vernon during an underway replenishment operation. In 1978 in the straits of Malacca the ship lost power and propulsion while being followed by a supertanker; collision was imminent, and the call went to man the life boat stations; collision was avoided, but it was a close call. In the late 1980s, the ship was one of the first U.S. Navy ships to have women sailors aboard. By 1991, and after a berthing retrofit accomplished in overhaul, the ship had a complement of female officers, and female senior and junior enlisted aboard. On 9 May 1989, while underway in the South China Sea en route to Guam, the White Plains experienced a major Class Bravo fire in the main engine room while conducting underway fuel replenishment with the combat replenishment ship USS Sacramento. The fire resulted from the ejection of a valve stem on the fuel transfer system which sent a high-pressure spray of fuel over the boiler and consequently ignited into a fireball. There were 6 fatalities and 161 injuries reported as a result of the fire. The cause of the valve stem ejection was a failure to follow proper tag-out procedures, a partially disassembled butterfly valve, poor validation of the fuel transfer checklist, and subsequent pressurization of the fuel line containing the valve. In January 1991, the White Plains was relieved from its deployment in the Persian Gulf by sister ship. In early August 1992, the ship received an extensive refit, including her main steam plant. Later that same month, as the ship was unable to be leave on its own power, its mooring lines were reinforced with anchor chain and steel cables to keep it moored to the pier as Typhoon Omar approached the island of Guam. On 27 August 1992, under the command of Capt. Robin Y. Weber, the ship weathered the initial pass of the eye of Super Typhoon Omar. After a relative calm and then the final pass of the eye of Typhoon Omar, White Plains was torn from her moorings. The ship with its skeleton crew rode out Omar's 150 mph winds in Apra Harbor. The ship ultimately ran aground on the coral beach. The responsibility for the safe mooring of a ship during repair lies with the shipyard. At the beginning of the repair availability, the ship's first lieutenant met with Ship Repair Facility Guam engineers and developed a plan to moor the ship in the event of a typhoon. The plan took into account the surface area of exposed portions of the ship and pounds per square inch of expected force generated by typhoon winds along with the strength of pier cleats, bollards and deadmen. The plan required more lines than were a part of the ship's normal complement. An agreement was reached about which lines would be provided by the ship and which would be provided by the shipyard. All lines were to be of nylon construction. On the morning of the storm's approach the shipyard riggers used springlay mooring lines. Springlay is a combination of wire and synthetic fiber and does not stretch. Nylon mooring lines can stretch up to a third of their length with no damage to the line. Despite the first lieutenant's protest of the incompatibility of the two types of mooring lines, the shipyard's riggers claimed they had no other lines available. This resulted in the springlay mooring lines holding almost the full force of the winds while the strength of the nylon mooring lines was not fully utilized. The springlay lines gave way followed by the nylon lines. In the weeks following Typhoon Omar, the eyes of two other typhoons passed over the ship while still in the shipyard. During these events the original mooring plan was utilized using all nylon mooring lines and the ship rode out both typhoons with no problems. Very fortunate to have run aground near Polaris Point, after the ship left the pier in the storm, the ship lost its only power source for a day, a notoriously fickle emergency diesel generator. The generator situation was corrected after several hours and troubleshooting, and ultimately solved by a simple observation made by the electrical officer, LTJG Lee, that a control governor mechanical linkage was undone. Essential power for emergency services were restored to the ship, enabling the crew to handle any flooding or fire that would occur. While the ship was aground for 3–5 days, the crew sustained on MREs, and helped plan, along with harbor operations, for her ungrounding. There was no real damage to the ship's hull. The ship recovered completely from the grounding and was underway for Gulf operations in May 1993. The ship, well past her life cycle and usefulness to the U.S. Navy, was decommissioned in 1995.
Disposal
White Plains was sunk as a target in the Pacific Ocean at, during the RIMPAC 02 exercise in waters 2,570 fathoms deep.