Waldenburg railway
The Waldenburg railway is a narrow-gauge light rail system in the canton of Basel-Landschaft. The long single-track line runs from Liestal, the capital of the canton, to Waldenburg, with stops in Bubendorf, Hölstein, Niederdorf, and Oberdorf. It connects to SBB train services in Liestal railway station.
Since 2016 the line is operated by Baselland Transport, and is, with the exception of a few industrial and funicular lines, the only line in Switzerland with a track gauge of. It was opened on 1 November 1880 and was operated by steam-hauled trains until 1953, when electric operation began. BLT is rebuilding the line to use, with a planned completion in December 2022.
History
A concession was granted by the canton of Basel-Landschaft on 18 June 1871 for the construction of a narrow gauge railway from Liestal to Waldenburg and eventually further to Langenbruck. In 1873 the concession was altered to give the Swiss Central Railway the commission to build the railway. For financial reasons in 1876 the Swiss Central Railway requested a deadline extension. On 25 November 1879 the Waldenburgerbahn was founded as a separate company and took over the concession for the railway from Liestal to Waldenburg.After only eight months' construction, the railway opened on 30 October 1880. Seats were provided in second- and third-class carriages. In 1881 the railway served eight stations with four journeys in each direction. The fastest journey over the whole 13 km line took 56 minutes.
In 1909 a committee made an application for the construction of and operation of an electric narrow-gauge railway from Waldenburg through Langenbruck to Balsthal, with a connection from St.Wolfgang to Mümliswil. The outbreak of World War I stopped plans for the extension of the line, and a 1912 proposal to electrify the line and regauge it to gauge.
On 26 October 1953 electric operation of the railway began, using 1500 V DC. New rolling stock was acquired for this.
The current rolling stock, consisting of seven railcars and 10 control cars was acquired between 1986 and 1993, replacing the 1953 stock.
In late 2015, the government of Basel-Landschaft canton approved a plan to convert the line from 750 mm gauge to meter gauge in 2023.. This will involve new passing loops and extensive reconstruction at Liestal and Waldenburg. The first step was the remodelling of Talhaus station. Fully automatic operation is also being contemplated. Waldenburgerbahn AG merged into Baselland Transport in 2016. In 2019 BLT ordered ten new light rail vehicles for use on the line after the conversion to metre gauge.
Operation
The line is built to gauge, and is electrified at 1500 V DC. For most of its route, the line takes the form of a single-track roadside electric tramway. There are 11 intermediate stops, and six passing loops.The journey over the whole line takes around 24 minutes. The line forms part of the Tarifverbund Nordwestschweiz common fare network, and is numbered 19 in that network's publicity, but this number is not displayed on the vehicles. The line runs a half-hourly service throughout the day, with additional trains during peak hours. Tourist services were formerly operated from spring to autumn by the only operating steam locomotive on the line, 1902-built Number 5 Gédéon Thommen. With the forthcoming conversion of the line to metre gauge, the "Thommen" was retired in September 2018 and is now in a new static display at Talhaus station
Rolling stock
Current rolling stock
Image | Numbers | Notation | Year | Notes |
5 | G 3/3 | 1902 | Steam locomotive Gedeon Thommen; built by SLM; plinthed at Liestal station in 1961 but returned to working order in 1980; now used for tourist service | |
11-17 | BDe 4/4 | 1985 to 1993 | Bogie motor cars; 11-14 built in 1985-86; 15-17 in 1993 | |
111-120 | Bt | 1985 to 1993 | Bogie driving trailers; 111-114 built in 1985-86; 115-120 in 1993 | |
Four historic carriages; now used for tourist service |