Wayne Stamping & Assembly


The Wayne Stamping and Assembly Plant is a Ford manufacturing plant in Wayne, Michigan, United States. Many of its more than 3,000 employees are represented by UAW Local 900.

Facility description

The plant opened in 1952 on, and integrates both stamping and assembly operations. Assembled body units and stamped body components are transferred from the stamping/body area of one building to the paint and assembly area of the adjacent building via an overpass bridge. The assembly process includes welding and sealing of sheet metal body components, metal finishing, phosphate coating, painting, and final assembly.
The facility is now part of the Michigan Assembly Plant.

Environmental issues

A long-term agreement between Detroit Edison and Wayne allows landfill gas from Woodland Meadows Landfill to be collected, compressed, and sent through underground piping to the plant. The boilers burn a combination of natural gas and landfill gas to create steam for use in the plant., The landfill gas also powers three engine generators, which produce approximately 2.4 megawatts of electricity. The electricity is sent to Detroit Edison's grid system using a step-up transformer. Flaring of the landfill gas is minimized in turn reducing emissions from the landfill. Exhaust from the engines is recycled via ducts to the boilers' fireboxes; the combustion in the boilers acts as a re-burn cycle to further reduce the emissions from the engines. The of recovered heat from the engines means less gas in the boilers, reducing energy consumption and emissions. The partnership of Ford and Detroit Edison gives the utility company an electricity source from garbage that displaces coal-fired power.
Generators were taken offline and removed in 2009
A new energy project was started in 2011. Ford's Michigan Assembly Plant is now home to one of the largest solar arrays in all of Michigan. Detroit Edison, Xtreme Power and the state have teamed up with Ford to install a 500-kilowatt solar array along with a 750-kilowatt battery system with 2 megawatt-hours of energy – enough to power 100 average homes in Michigan for a year. The solar setup powers production of the Focus and Focus Electric and sends excess energy back to the grid.

Rail operations

The Ford complex is serviced by two Class 1 railroads, Norfolk Southern and CSX. The complex straddles the Wayne Junction, where Norfolk Southern's east-west Michigan Line crosses CSX's north-south Saginaw Subdivision. Norfolk Southern's Wayne Yard is to the south of the Stamping & Assembly plant, and consists of ten sidings. CSX's Wayne Yard is on the east side of the plant, and consists of more than 20 sidings. Much of the rolling stock consists of tri-level enclosed auto racks. Steel coils which are brought in by NS and CSX are a common sight for they are need to transfer steel coil loads for stamping.

Past Products

Some of the former products built at the plant included :