The first station to bear the name Wembley Stadium, at, about east-north-east of the present station, was opened by the LNER on 28 April 1923 as The Exhibition Station. It had one platform, and was situated on a loop which forked off the Chiltern Main Line between Neasden Junction and Wembley Hill station. It then curved round in a clockwise direction to regain the Chiltern Main Line at a point slightly closer to Neasden Junction. The connections faced London to allow an intensive service with no reversing. The station was renamed several times, becoming Wembley Stadium station in 1928. The station was last used on 18 May 1968 for the 1968 FA Cup Final between Everton v West Bromwich Albion, and was officially closed on 1 September 1969. Traces of the line can be seen on maps and in aerial photographs. It was normally used only for passenger services for events at the stadium or the Empire Pool within the estate, built for the 1924-25 British Empire Exhibition. Temporary sidings led into the "Palace of Engineering" exhibition hall where both the Great Western Railway's locomotive Caerphilly Castle and the London and North Eastern Railway's Flying Scotsman were displayed, with each claimed by its owners to be the most powerful passenger locomotive in Britain.
Present station
On 20 November 1905 the Great Central Railway opened a new route for freight trains between Neasden Junction and Northolt Junction. Passenger services from Marylebone began on 1 March 1906, when three new stations were opened: Wembley Hill, and South Harrow. On 2 April 1906 these services were extended to Northolt Junction. Wembley Hill station was renamed Wembley Complex on 8 May 1978 in order to indicate its proximity to the nearby sports facilities, as well as to a recently opened conference centre, before getting its present name Wembley Stadium on 11 May 1987. There were originally four tracks with the two platforms on passing loops outside the inner non-stop running lines; the current two-track layout dates from the 1960s. The 4 tracks were closed for a week by a landslide in a cutting near the station from 18 February 1918.
2 trains per hour to Gerrards Cross, one of which continues to High Wycombe
The service to central London is quicker than from other stations in the area. Trains can reach London Marylebone non-stop in ten minutes. During busier periods a seven carriage shuttle operates between Marylebone and Wembley Stadium using the turnback siding just west of the station to enable trains to quickly turn around to go back to London. There will be an enhanced northbound service too, with trains travelling to Banbury, Birmingham and beyond making additional calls at the station.