The first station at Whitehaven was opened on 19 March 1847 by the Whitehaven Junction Railway as the terminus of their line from. This station lay to the south of the present station, with the main entrance on Bransty Row. On the southern side of the town, the first section of the Whitehaven and Furness Junction Railway opened on 1 June 1849 from a terminus at Whitehaven to, but there was no connection between this line and the WJR suitable for passenger trains. In between the two stations stood the town centre, and to the east of that Hospital Hill, so a tunnel long was built beneath the latter, being completed in July 1852. In 1854, the W&FJR passenger trains began using the WJR station at Whitehaven. In 1865, the W&FJR was absorbed by the Furness Railway, and in 1866, the WJR was absorbed by the London and North Western Railway. The LNWR station was replaced on 20 December 1874 by a new one named Whitehaven Bransty; it was jointly owned by the LNWR and the FR. This station had its name simplified to Whitehaven on 6 May 1968. The original buildings were demolished and replaced by a modern single-story ticket hall in the mid-1980s. The former goods yard site beyond and behind platform one is now occupied by a supermarket. The station formerly had four operational platforms, but today only two remain in use. The double line from Parton becomes single opposite the stationsignal box and then splits into two - one runs into platform one and the other runs into platform two, which is the through line to Sellafield, Millom and Barrow. Trains heading south must collect a token for the single line section to St Bees from a machine on the platform before they can proceed. Conversely trains from Barrow must surrender the token upon arrival, the driver returning it to the machine before departing for Workington. Only then can the signaller allow another train to enter the single line section.
Facilities
The ticket office is open six days per week and there is also a ticket machine available. Digital display screens, a P.A system and information posters provide train running information. Step-free access is available through the main building to both platforms.
Service
There is generally an hourly service northbound to Carlisle and southbound to Barrow-in-Furness. A few through trains operate to/from Lancaster via the Furness Line. Train operator Northern introduced a regular Sunday through service to Barrow via the coast at the May 2018 timetable change - the first such service south of Whitehaven for more than 40 years. Services run approximately hourly from mid-morning until early evening, with later trains starting and terminating here. This represents a major upgrade on the former infrequent service of four per day each way to/from Whitehaven only that previously operated. A Sunday service over the whole length of the Coastal route operated on a one-off basis on Sunday 27 September 2009 to celebrate the ACoRP Community Rail Festival. An improved Sunday service has been introduced as part of the current Northern franchise.