Will Rogers World Airport


Will Rogers World Airport, Will Rogers Airport or simply Will Rogers, is an American passenger airport in Oklahoma City located about 6 miles Southwest of downtown Oklahoma City. It is a civil-military airport on 8,081 acres of land. Although the official IATA and ICAO airport codes for Will Rogers World Airport are OKC and KOKC, it is common practice to refer to it as "WRWA" or "Will Rogers".
The airport is named for comedian and legendary cowboy Will Rogers, an Oklahoma native who died in an airplane crash near Barrow, Alaska in 1935. The city's other major airport, Wiley Post Airport, along with the Wiley Post–Will Rogers Memorial Airport in Barrow, Alaska, are named for Wiley Post, who also died in the same crash. Will Rogers World Airport is the only airport to use "World" in its designation. Although Will Rogers offers U.S. Customs and Border Protection services for customs and immigration, there are currently no scheduled international flights.
Will Rogers World Airport is the busiest commercial airport in the state of Oklahoma. In 2019, the airport handled nearly 4.42 million passengers, marking the busiest year on record three years in a row. Southwest Airlines carries the most passengers at Will Rogers World Airport, with a market share of nearly 38% as of December 2018.

History of Rogers World Airport

The airport first opened in 1911 as Oklahoma City Municipal Airfield. It was renamed in Rogers' honor in 1941.
During World War II Will Rogers Field was a major training facility for the United States Army Air Forces; many fighter and bomber units were activated and received initial training there.
Army Air Forces groups known to have been stationed at Will Rogers Field included:
After completion of their initial training, these units were reassigned to other airfields for secondary training before deployment overseas.

Post-war

The December 1951 C&GS chart shows 5497-ft runway 3, 3801-ft runway 8, 5652-ft runway 12 and 5100-ft runway 17.
The April 1957 OAG showed 21 daily non-stop departures on Braniff International Airways, 15 on American Airlines, 5 on Central Airlines, 4 on Continental Airlines and 3 on TWA. A TWA Constellation aircraft flew non-stop from Oklahoma City to Los Angeles but eastward non-stops didn't reach beyond Wichita, Kansas, Tulsa or Dallas, Texas. Oklahoma City began non-stop flights to Chicago starting in 1966.

2000–present

, a regional airline based in Tulsa, Oklahoma made Will Rogers World Airport a hub in 2001, with non-stop flights to Tulsa, Albuquerque, New Mexico, and Colorado Springs, Colorado and direct or connecting flights to Nashville, Tennessee, St. Louis, Chicago, and Washington. The airline had hoped to reach additional East and West coast markets but declared bankruptcy and ceased operations on January 23, 2004.
On May 31, 2013, an EF-1 tornado hit Will Rogers Airport. The 1.4-mile wide tornado traveled 10.4 miles which includes across the northern side of the airport. The path of the tornado passed over the facilities of MetroTech, FAA, Oklahoma National Guard, AAR, Four Points Hotel, and the passenger terminal and hangars on the North and East side of the airport. Minor damage was reported at AAR and other buildings in this path. The Parking Spot location north of the airport on Meridian Ave was also hit by the tornado. The company decided in August 2013 not to re-open the facility and exit the OKC market.
The airport once partnered with Tinker AFB in presenting Aerospace America airshow.

Terminal

By the late 1990s the Oklahoma City Airport Trust deemed the 1967-built terminal building unsuitable. Following the adoption of a three phase master plan, preparations for renovating the airport were launched in 2001. The old twin concourses were demolished to make way for a larger terminal with integrated concourses, high ceilings, and modern facilities.
A $110 million multi-phase expansion and renovation project, designed by Atkins Benham Inc. and Gensler and built by Oscar J. Boldt Construction Company, began in 2001. Phase-I involved erection of construction walkways from the five-story parking garage to the terminal building, demolition of the terminal's existing elevator core, construction of new elevator and escalator cores on the tunnel level and on level one, building temporary entrance and exit ramps for vehicles approaching and leaving the terminal, reconstruction of the roofs of the lower level and level one, finishing the elevator and escalator cores to level two, building new permanent entry and exit ramps for vehicles and construction of a new transportation plaza and driving lanes. Phase-II included a new concourse constructed to the west of the central terminal area, which was renovated to match the interior and exterior designs of the new concourse. The 1960s-built concourses were then demolished after the new concourse opened in 2005. The entire phase was completed in November 2006. Phase-III project calls for the construction of a new concourse to the east, with at least eight more gates as well as expanded retail, restaurant, and baggage areas.
Will Rogers World Airport has a single three-level terminal with 17 departure gates along the West Concourse and Central Concourse. Gates on the south side use even numbers while those on the north use odd. Due to the terminal's layout, certain odd numbers are omitted in the succession of Gates 1 through 24. Arriving passengers can access baggage claim in the downstairs level where there are 9 baggage belts. Level 3 contains offices for airline and airport staff.
The architecture of the current terminal uses native stone along with loft-ceilings, plate glass and brushed metal. Compared to the original terminal design of the old Concourses A and B, today's terminal provides a more open feel similar to that found in larger hub airports.

Terminal expansion

In 2008, Will Rogers World Airport officials approved a contract with Frankfurt Short Bruza Associates to begin planning for expansion. However, officials agreed to postpone the expansion plan due to the industry-wide decline in passenger traffic.
During 2012 the Phase III expansion plan was updated to include a new Central Concourse reconfiguration plan. In 2014, the Airport Trust selected Option 2a, which includes only the central terminal improvements. The $3.6 million project will create a new central checkpoint in the center of the check-in hall. Two new greeter lobbies will be created where existing check points exist. The expansion will slightly reduce the space utilized by Sonic in the food court. The restrooms in the area will also be relocated to the nearby Osage room. The Southwest ticket counters will be relocated further east.
In 2015 the airport trust agreed to proceed with the full construction of the East Concourse due to increased congestion in the existing West and Central concourses and passenger demand. When completed, the existing terminal building would to the east and include a new passenger concourse initially with four gates, which would increase the number of boarding gates to 21. The new facility will have customs and immigration on the lower level accessed by the two eastern-most gates and would serve international arrivals. The expansion will incorporate a single TSA screening zone in the center of the existing terminal, the food court will be removed and two reconstructed, and arriving passengers would exit at the current TSA zones which will be dramatically downsized into modern "meeter-greeter areas". The East expansion will include onsite USAA military welcoming facilities, expanded concessions and office space, and an updated terminal lobby.
The new Concourse expansion project will also include an innovative view system composed of an elevated platform and lounge that will allow visitors to walk above the newly expanded East Concourse and view down onto the secure gate areas and out to the airside. Visitors would enter the elevated walkway at the terminal lobby non-secured side. This design is intended to provide visitors the experience of airports of old; where one could walk all the way to the gate – albeit today completely separated from the secured concourse space. The expansion broke ground in March 2019.
If necessary, a final expansion of the existing master plan could be accomplished with construction of the Central Concourse, increasing gate capacity by an additional 10 gates. This would give the terminal a final configuration with three concourses, East, West, and Central and would provide the airport with 30+ gates.

Airlines and destinations

Passenger

Destinations map

Cargo

Statistics

Top destinations

Annual traffic

Ground transportation

Rental car

The airport opened a new Consolidated Rental Car Facility in early 2016, moving all rental services away from the Terminal to a grand facility nearby. Advantage, Alamo, Avis, Budget, Dollar, Enterprise, Hertz, National, and Thrifty rental companies offer service at Will Rogers World Airport. Shuttle buses connect passengers from the arrivals plaza just outside the terminal.

Parking

The airport began a $3.8 million maintenance project in September 2011 to rehabilitate and repair two of its three parking garages. The project will make improvements to garages A and B, two of the six parking options at the airport. Garage A is the two-story garage that provides hourly parking for the airport's short-term visitors on the upper level, and "ready-return" spaces for the rental car agencies on the lower level. Parking Garage B, adjacent to A, is the older of the two five-level parking structures that provide covered parking for air travelers. Garage C, the new parking garage which opened in 2009, will not be impacted. Nearing middle age, the structures will undergo several different types of refurbishments that will extend the long-term use of the facilities. The work will include:
The project will be divided into 12 sequences allowing the airport to keep as much of the garage open as possible. Most of the sequences will only require closing about 300 spaces at a time, leaving approximately 2,500 of the 2,800 total spaces in the two garages available for parking. The project work will start in the five-level Garage B on levels one and two. The entire project is anticipated to take 18 months. The most challenging portion of the project will be when the work commences on the two-story parking garage. During this sequencing, hourly parking and rental car companies will be moved to temporary locations in Garage B and C.
The airport operates three surface parking lots on the grounds of WRWA.
The airport provides a short-term parking area in the second level of Garage A. The parking is free for the first hour and then $1 per hour after that. There are also two cell phone waiting areas just across the street from the shuttle parking lot No. 2, near Lot No. 3, and by the flag plaza north of the long-term shuttle Lot No. 2.

Government and military operations

Will Rogers Air National Guard Base

Until 2008, the Oklahoma Air National Guard's 137th Airlift Wing and its Lockheed C-130 Hercules aircraft were located at the airport's Will Rogers Air National Guard Base. As part of the 2005 round of Base Realignment and Closure Commission recommendations, the majority of the maintenance unit was relocated to nearby Tinker Air Force Base, where the wing transitioned to the KC-135 Stratotanker aircraft and became the 137th Air Refueling Wing, an "Associate" unit of the 507th Air Refueling Wing. The unit then shared KC-135 aircraft with the Air Force Reserve Command's 507th Air Refueling Wing in a joint operations and maintenance program. On 30 Jun 2015, the 137 ARW / 507 ARW partnership at Tinker AFB officially ended. The 137th was planned to transfer to Air Force Special Operations Command and will redesignate as the 137th Special Operations Wing, flying the MC-12 Liberty, marking a return of ANG flight operations to Will Rogers.
Will Rogers Air National Guard Base also continues to be the home of the unit's Expeditionary Support Group headquarters, operations and support, as well as the Oklahoma ANG's 146th Air Support Operations Squadron. The Oklahoma Army National Guard also carries out helicopter maintenance at the airport.

Other facilities

The Federal Aviation Administration Mike Monroney Aeronautical Center is located on the west side of the airport. The Center headquarter's the Civil Aerospace Medical Institute, FAA Academy and Logistics Center.
The U.S. Department of Justice has major Justice Prisoner and Alien Transportation System facilities at Will Rogers World Airport. The Federal Transfer Center and its principal air hub is built on the west side of the airport grounds, off of Taxiway G.
The U.S. Customs and Border Patrol operate their national training facility on airport grounds. They operate a hangar on the north side of the airport, off of Taxiway N, north of the JPATS Hangar.
The Oklahoma City Composite Squadron of Civil Air Patrol meets on Tuesday evenings at 6:30 pm on the grounds of the Oklahoma Air National Guard base on the West side of the field.
The City of Oklahoma City Department of Airports manages Will Rogers World Airport and the other city-owned airports: Wiley Post Airport and Clarence E. Page Municipal Airport. The Airport Trust is led by Director Mark Kranenburg.

Businesses and other onsite institutions

Corporate, air taxi

Will Rogers World Airport has a separate terminal facility used by air taxi and corporate service, although most of these flights use the Wiley Post Airport, Oklahoma City's FAA-designated reliever facility.

Maintenance, repair, operations and fixed-base operations

has a major maintenance, repair, and overhaul facility and regional headquarters at Will Rogers World Airport, in addition to other aircraft maintenance and aircraft on ground organizations.
ARINC has major facilities on the airport premises, including plans to double the size of their current facility.
Atlantic Aviation has a fixed-base operation located on the east side of the airport, off of Taxiway H. This is Atlantic's first Greenfield project.

Other facilities

Southwest Airlines has one of its largest customer service and support centers on the northern grounds of Will Rogers World Airport.
Will Rogers World Airport is home to Metro Technology Center's Aviation Career Campus. The aviation center offers training to prepare aircraft maintenance technicians with classrooms, practical labs, and separate airframe and powerplant hangars are available for academic and hands-on training. The Aviation Maintenance Technician program is an 18-month course that is certified and approved by the Federal Aviation Administration.
The facility is on the west side of the airport, north of the FAA center. One notable sight on the MetroTech campus includes a donated AirTran Airways DC-9-30 in the post AirTran Airways / ValuJet merger colors.
Will Rogers World Airport permanently hosts the Ninety Nines Museum of Women Pilots. The facility is located on more than, occupying the entire second floor of the International Headquarters building. It features a repository for a unique collection of the papers, personal items and other historic artifacts of some of the most significant achievements and adventures of the international community of women pilots. Its library and exhibit areas will provide new insights into the role women pilots played in the development of aviation.

Lariat Landing

Lariat Landing is a new development on the East side of the airport grounds that encompasses. The development is meant to generate increased non-airline revenue for the airport while still growing air service. The development will be mixed use with nearly half of it, west of Portland Avenue, designated to direct aviation support with an additional portion dedicated to aviation support companies. The remaining portion east of Portland Avenue will be zoned for retail, industrial, and commercial office space.
The direct aviation parcels of Lariat Landing will be marketed towards aircraft maintenance, aircraft manufacturing, commercial air cargo, and corporate aviation companies. Atlantic Aviation and ARINC are two tenants already located in the new development area. The aviation support district will be targeting companies that provides aviation related goods and services. The target companies include freight forwarders, logistics, cargo, warehousing, distribution operations, and manufacturing companies.
Located between Interstate 44 and Portland Avenue, the office park will have a retail village as the gateway to its campus. It will target offices, hotels/motels, retail, warehouse, distribution, and logistic companies.
Property will only be leased due to FAA requirements and will have a maximum term of 40 years. The realignment of Portland Avenue is currently in process while the new waterline installation has already been completed.

Incidents

On March 26, 1939, Braniff International Airways Trip 1, a Douglas DC-2, registration NC13727, crashed while attempting to return to the airport. The aircraft had just departed when a cylinder on the left engine tore loose from its mounting and caused a tear in the engine cowling. Subsequent drag from the torn cowling resulted in a stall on the wing, and the plane cartwheeled on to the airport grounds, just yards from the safety of the runway. The captain cut the fuel switches just before impact, but misted fuel from the tanks spread over the hot engines, causing a fire. The captain, first officer, and three passengers survived. The flight's hostess and seven passengers, however, died in the disaster.
A Rockwell Sabreliner, registration N5565 crashed on January 15, 1974, after descending below minimums on an ILS approach in low clouds and fog. Both occupants were killed.
On December 21, 2012, a U.S. Customs and Border Patrol Cessna Citation crashed during landing at Will Rogers Airport. Both occupants survived, one had minor injuries.
On November 15, 2016, a Southwest Airlines employee, Michael Winchester was shot and killed in a parking garage; a 45-year-old suspect, Lloyd Dean Buie, was subsequently found dead of an apparently self-inflicted wound. Winchester was the father of Kansas City Chiefs long snapper James Winchester and himself a former punter and member of the Oklahoma Sooners' 1985 national championship college team.