Wind power in South Australia
became a significant energy source within South Australia over the first two decades of the 21st century. As of 2015, there was an installed capacity of 1,475 MW, which accounts for 34% of electricity production in the state. This represents 35% of Australia's installed wind power capacity.
The development of wind power capacity in South Australia has been encouraged by a number of factors. These include the Australian Government's Renewable Energy Target, which require electricity retailers to source a proportion of energy from renewable sources, incentives from the South Australian Government including a supportive regulatory regime and a payroll tax rebate scheme for large scale renewable energy developments. Also the state's proximity to the Roaring forties means there are high quality wind resources for wind farms to exploit. In mid-2009, RenewablesSA was established by the South Australian Government to encourage further investment in renewable energy in the state.
The load factor for South Australian wind farms is usually in the range 32-38%. This means that a wind farm could typically produce between 32 and 38% of its nameplate capacity averaged over a year.
Wind farm overview
In 2003 the only large wind turbine in South Australia was a 0.15 MW unit at Coober Pedy and by early 2004 there was 34 MW of installed wind power capacity.As of December 2010, South Australia had thirteen operational wind farms, with an installed capacity of 1,018 MW. By August 2014 this has increased to 1,473 MW, accounting for 27 per cent of electricity production. As of late 2015 there are a large range of new wind farms in various stages of planning but only one under construction, the Hornsdale Wind Farm. Hornsdale is a place that was generating 86 MW immediately prior to the 2016 South Australian blackout in September 2016.
South Australia has provided regulatory certainty for wind farms, and the government has implemented land use planning policies which represent national best practice for accommodating wind farms. On 2 June 2009, Premier Mike Rann announced plans to increase South Australia's renewable energy production target to 33% by 2020, well above the national target of 20% by 2020.
Installed capacity | Wind farm | Developer | Stage | Installed capacity | Generating since... |
369 | Snowtown wind farm | Tilt Renewables | 1 | 99 | 2008 |
369 | Snowtown wind farm | Tilt Renewables | 2 | 270 | November 2014 |
350 | Hallett Wind Farm | AGL Energy | 1 | 95 | March 2007 |
350 | Hallett Wind Farm | AGL Energy | 2 | 71 | 2009 |
350 | Hallett Wind Farm | AGL Energy | 4 | 132 | June 2008 |
350 | Hallett Wind Farm | AGL Energy | 5 | 52 | 2012 |
315 | Hornsdale Wind Farm | Neoen | 1 | 102 | January 2017 |
315 | Hornsdale Wind Farm | Neoen | 2 | 102 | July 2017 |
315 | Hornsdale Wind Farm | Neoen | 3 | 109 | December 2017 |
278.5 | Lake Bonney Wind Farm | Infigen Energy | 1 | 80 | March 2005 |
278.5 | Lake Bonney Wind Farm | Infigen Energy | 2 | 159 | |
278.5 | Lake Bonney Wind Farm | Infigen Energy | 3 | 39 | 2010 |
195 | Lincoln Gap Wind Farm | OneWind Australia | - | 195 | 2018 |
119 | Willogoleche Wind Farm | Engie | - | 119 | 2018 |
131 | Waterloo Wind Farm | EnergyAustralia | - | 131 | |
91 | Wattle Point Wind Farm | AGL Energy | - | 91 | |
70 | Mount Millar Wind Farm | Meridian Energy | - | 70 | |
66 | Cathedral Rocks Wind Farm | EnergyAustralia/ Acciona | - | 66 | |
56 | Clements Gap Wind Farm | Pacific Hydro | - | 56 | February 2010 |
46 | Canunda Wind Farm | Engie/Mitsui | - | 46 | |
34 | Starfish Hill Wind Farm | RATCH-Australia | - | 34 |
Operational wind farms
Snowtown Wind Farm (369 MW)
It is located on the Barunga Range of hills west of Snowtown in the mid-North of South Australia and around 150 km north of the state capital, Adelaide. The first stage of the Snowtown wind farm with a capacity of 98.7 MW was completed in 2008. The 270 MW second stage was completed in November 2014.Hallett Wind Farm (350 MW)
was developed in four stages: Hallett 1, Hallett 2, Hallett 4 and Hallett 5. The proposed Hallett 3 wind farm was put on hold by AGL in 2012.Hallett 1 consists of 45 Suzlon 2.1 MW S88 turbines and was completed in June 2008. Hallett 2 consists of 34 2.1 MW Suzlon turbines and was completed in late 2009. Hallett 4 has 63 turbines with a total installed capacity of 132 MW, and was in full operation in early 2011. Hallett 5 consists of 25 Suzlon turbines each of 2.1 MW and was completed in early 2012.
Hornsdale Wind Farm (315 MW)
was built in three stages. Construction of Stage 1 began in September 2015 and was finished in September 2017. Stage 1 consists of 32 turbines each having a rated capacity of 3.2 MW. Construction of Stage 2 began in July 2016 and was finished in June 2017. Stage 2 consists of 32 turbines each having a rated capacity of 3.2 MW. Construction of Stage 3 began in April 2017 and was finished in December 2017. Stage 3 consists of 35 turbines each having a rated capacity of 3.2 MW.Lake Bonney Wind Farm (278.5 MW)
was built in three stages. Stage 1 consists of 46 turbines each having a rated capacity of 1.75 MW and was finished in March 2005. Construction of Stage 2 began in November 2006 and was finished around April 2008. Stage 2 consists of 53 turbines of 3 MW. Stage 3 consists of 13 turbines of 3 MW. The combined capacity of the three stages are 278.5 MW making it the biggest wind farm in Australia at the time of completion.Lincoln Gap (212 MW)
is built on the hills above Lincoln Gap, a gap in the range where the Eyre Highway and Whyalla railway line pass through.Willogoleche Wind Farm (119 MW)
is in the Mid North of South Australia, just west of the town of Hallett.Waterloo Wind Farm (131 MW)
The Waterloo Wind Farm was built as a 111 MW wind farm which was completed in 2010 at an estimated cost of $300 million. It had thirty-seven Vestas V90 3 MW turbines along the 18 km wind farm site connected through a 33 kilovolt internal reticulation network to the wind farm substation. The wind farm is approximately 30 kilometres south-east of the township of Clare and 100 km north of Adelaide. A Stage 2 expansion was approved to add up to an additional 6 turbines to the existing farm and increase its total generating capacity to over 130 MW. The wind farm was expanded with six additional Vestas V117 turbines at the southern end in 2016 at a cost of.Wattle Point Wind Farm (91 MW)
is near Edithburgh on the Yorke Peninsula. When it was officially opened in June 2005 it was Australia's largest wind farm at 91 MW. The installation consists of 55 wind turbines and was built at a cost of 165 million Australian dollars.Mount Millar Wind Farm (70 MW)
is situated on an escarpment between the towns of Cowell and Cleve located 100 kilometres southwest of Whyalla. The 35 wind turbines are positioned on the elongated Mount Millar site to maximise wind exposure and can generate up to 70 megawatts of electricity. Construction of this wind farm started in late 2004 and was completed in December 2005. Power production started in February 2006.Cathedral Rocks Wind Farm (66 MW)
is in a remote coastal area located near the southern tip of the Eyre Peninsula in South Australia, about 30 km south west of Port Lincoln. It has 33 wind turbines capable of generating 66 MW in total. Construction started in 2004, and the first turbines were commissions in late 2005. The wind farm was fully operational by 2007.Clements Gap Wind Farm (56 MW)
In February 2010, Pacific Hydro opened the 56.7 MW Clements Gap Wind Farm. The wind farm is located in South Australia's mid-north. The project has 27 x 2.1 MW Suzlon wind turbines, which generate enough electricity for 30,000 homes.Canunda Wind Farm (46 MW)
is a $92.5 million, 46 MW wind power project located on grazing land approximately 16 kilometres south of Millicent. The wind farm is made up of 23 Vestas 2.0 MW wind turbines. The project was opened in March 2005. in backgroundStarfish Hill Wind Farm (34.5 MW)
is near Cape Jervis on the Fleurieu Peninsula. It comprises 23 turbines of 1.5 MW each, with 8 turbines on Starfish Hill and 15 on the nearby Salt Creek Hill, giving a combined generating capacity of 34.5 MW. Starfish Hill Wind Farm was commissioned in September 2003, making it the first major wind farm in South Australia.Wind farm proposals
In addition to its operating wind farms, South Australia has several proposals for new farms at various stages of development. These include:Designed capacity | Wind farm | Location | Developer | Development Status | Expected operational date |
600 | Ceres Project | Yorke Peninsula | Senvion Australia | Approved 2014. Revised plan approved August 2019 | 2021 |
206.5 | Port Augusta Renewable Energy Park | south of Port Augusta | DP Energy and Iberdrola | Pending approval, construction expected to commence in late 2019 | 2021 |
105 | Keyneton | Keyneton | Pacific Hydro | 2013 approved. 2019 cancelled. | Construction was to start mid-2019 |
100-110 | Stony Gap | near Burra | Palisade Investment Partners | 2014 approved | Palisade is continuing to investigate options for the development of the Stony Gap proposal, while at the same time considering options to sell the asset to a different developer |
144-250 | Exmoor | Naracoorte | Acciona | Application lodged 2011, possibly lapsed by 2019 | 2017 |
350 | Woakwine | near Beachport | Infigen Energy | 2012 approved | |
375 | Palmer | Palmer, Tungkillo, Sanderston | Tilt Renewables | In Development, being assessed against other options | Approved 2015, appeals dismissed 2019 |
120 | Kongorong | Kongorong | RATCH-Australia | Possibly lapsed before 2019 | Not mentioned on company web site |
110 | Kulpara | northwest of Port Wakefield | RATCH-Australia | Possibly lapsed before 2019 | Not mentioned on company web site |
14–200 | Tungketta Hill/Elliston | Between Elliston and Sheringa | Ausker Energies | Approved | The developer's website said construction would begin when transmission issues are resolved. |
180 | Barn Hill | Will fill the gap between Snowtown and Clements Gap wind farms on the Barunga Range southwest of Redhill | AGL Energy | 2009 approved, 2013 revised | Unknown, AGL still holds the rights in 2019 |
185 | Twin Creek Wind Farm | northeast of Kapunda | RES Australia | May 2019 development consent October 2019 Development approval | |
? - 26 turbines | Crystal Brook energy park | Crystal Brook | Neoen | August 2019 approval | Construction due 12 months from approval |
Cancelled wind farm proposals
Myponga Wind Farm
The Myponga Wind Farm was a wind farm proposal by TrustPower in the southern Mount Lofty Ranges, on the Fleurieu Peninsula 50 km south of Adelaide, between the towns of Myponga and Sellicks Beach. Development approval was granted in 2003, and the project was planned to be operational by the end of 2010. The approval was revoked in 2011.In 2009, TrustPower announced that it would not proceed with the project, because the South Australian government had not approved variations to height, layout and turbine type in the existing planning approval. The requested change was to reduce the number of turbines to 16 but increase their power output and increase the height of the turbines from 100 metres to 110 metres. The planning approval was eventually revoked.
Keyneton
proposed to build a 105 MW wind farm near Keyneton east of the Barossa Valley. It was approved by the government in 2013. The proposal was cancelled in October 2019.Impacts
The increasing proportion of renewable energy in the state has caused a significant decrease in the emissions intensity of electricity generation in South Australia.The rapid development of wind power in South Australia has led to direct economic effects from the construction and operation of wind farms. There has been a total of $2.8 billion in wind power investment up to October 2011 which is estimated to have created 3,000 direct and indirect jobs. Studies into the economic effects of wind farms have reported that a 50 MW installation pays host landholders some $250,000 per year, is constructed by workers who spend up to $1.2 million locally and contributes up to $80,000 annually to community projects.
Policies to streamline the approval process for wind farm developments have met with some community opposition. Specific concerns have been raised by rural residents who claim that wind farms have an unacceptable impact on property values, health and the environment.
There has been some controversy with respect to the impact of the rising share of wind power and other renewables such as solar on retail electricity prices in South Australia. A 2012 report by The Energy Users Association of Australia claimed that retail electricity prices in South Australia were then the third highest in the developed world behind Germany and Denmark, with prices likely to rise to become the most expensive in the near future. The then South Australian Opposition Leader, Isobel Redmond, linked the state's high retail prices for electricity to the Government's policy of promoting development of renewable energy, noting that Germany and Denmark had followed similar policies. On the other hand, it has been noted that the impact of wind power on the merit order effect, where relatively low cost wind power is purchased by retailers before higher cost sources of power, has been credited for a decline in the wholesale electricity price in South Australia. Data compiled by the Australian Energy Market Operator shows South Australian wholesale electricity prices are the third highest out of Australia's five mainland states, with the 2013 South Australian Electricity Report noting that increases in prices were "largely driven by transmission and distribution network price increases".
The South Australian Government has stated that the price increase due to the Australian Government's carbon price was approximately half of that experienced by other states due to the high installed capacity of wind and gas-fired generation.
2011 Renewable Energy Plan
In October 2011 the South Australian state Government released a renewable energy plan proposing a range of measures including:- a revised renewable energy target of 33% of the state's electricity production coming from renewable sources by 2020
- a ban on new coal-fired power stations
- greater involvement of local government in the development approval process to promote more effective community engagement
- investigations into increasing the capacity of transmission lines to support renewable energy developments including wind energy
- no wind farms allowed within one kilometre of any home unless agreement is reached between the developer and the home owner.