Wolfe Island Wind Farm


Wolfe Island Wind Farm is a large wind farm project located on Wolfe Island, Ontario. The wind farm became operational on June 29, 2009. It is owned and operated by Canadian Hydro Developers, Inc., through its subsidiary Canadian Renewable Energy Corporation. The power will be purchased by Hydro One for distribution to consumers.
The wind farm consists of eighty-six 2.3-megawatt Siemens model Mark II wind turbines situated on the western portion of Wolfe Island.
Once completed, the 197.8 MW project is expected to generate approximately 594 gigawatt-hours of renewable power annually; enough to supply about 75,000 average households.
Winds of are required to generate power; when winds are less than, then power is not being generated.

Key project components

CREC has optioned a total of approximately 2513 hectares of land for the proposed wind development.
The facility will provide green jobs and generate landowner and community income through royalties, taxes, and the amenities agreement. Canadian Hydro has built a visitor centre at its property on the 5th line.
The 2010 Bird and Bat report commissioned by Transalta, a component of the Post Construction Follow-up Plan, states that over the first six months of operation bird mortality due to blade strike was 602 birds of which 13 were raptors. That reflects 6.99 birds per turbine over six months. The industry standard for comparable wind facilities is generally 2 bird strikes per turbine per year. Over 1270 bats were killed in the same six-month period. The development is in a globally and continentally significant Important Bird Area. The PCFP was designed in response to stakeholder concerns over potential negative effects on bird populations, and is a partnership between Transalta, the Environment Canada and provincial Ministry of Natural Resources.

Production