The Karen Demirchyan Yerevan Subway, colloquially known as the Yerevan Metro, is a rapid transit system that serves the capital of Armenia, Yerevan. Owned by the government, it is operated by the Karen Demirchyan Yerevan Subway CJSC of the Ministry of Transport and Communication of Armenia.
The system was launched in 1981 and, unlike most former Soviet rapid transit systems, its stations are not very deep, there are two stations above ground, one shallow and the rest are considered deep underground, however, the depth of those stations is not great only three stations are greater than 30 meters, Marshal Baghramyan, Barekamutyun and Yeritasardakan. Stations are intricately decorated with national motifs. The metro runs on a line and currently serves 10 active stations.

History

Yerevan, the capital of Armenia, experienced substantial growth during the postwar period when it was the capital of the Armenian SSR. Due to the city's very uneven landscape only an underground system could meet all of the criteria to efficiently move large numbers of people around the city. The first plans for a rapid transit system began to be formed in the late 1960s, under the auspices of Anton Kochinyan, then the 1st secretary of the Communist Party of Armenia. Initially this was centred on a rapid tram system, rather than a full underground metro system. During this time, the Soviet City Engineering Planning Department clearly stated that a Metro system would only be awarded to cities with more than a population of one million, which Yerevan lacked at the start of construction. Nevertheless, all of the tunnels in which the tram lines were to be installed were built to a design that would have allowed a potential conversion into a full underground metro system.
By the end of 1978 over 4 km of tunnels were already bored through, when the plans were redesigned so that the system would be opened as a full underground metro.
On 7 March 1981 the system was triumphantly opened, becoming the eighth Soviet Metro system, with a first four station stage of 7.6 kilometres. Since then, the system has grown to a, 10 station network.
The engineering work was of such high quality that during the 1988 Armenian earthquake the Metro managed to withstand the earthquake which paralyzed the whole republic and continued to operate on the next day with only minor damage. However this did put an end to most of the extension projects as finances were diverted to reconstruction of the destroyed infrastructure elsewhere in Yerevan and Armenia.
On 28 December 1999, the Metro was named after Karen Demirchyan, the man who was responsible for changing the status of the Rapid Tram system into becoming a Metro system, after he was killed two months earlier in a terrorist attack on the Armenian parliament.

Timeline

Name changes

Following the dissolution of USSR and the independence of Armenia, three stations saw their names changed in 1992. A fourth station had been renamed ten years before, to honour Ivan Khristoforovich Bagramyan, a Soviet military commander of Armenian origin, after his death.
StationPrevious nameYears
Marshal BaghramyanSaralanj1981–1982
Republic SquareLenin Square1981–1992
Garegin Nzhdeh SquareSpandaryan Square1987–1992
General AndranikHoktemberyan1989–1992

Facts and numbers

Today the metro operates as a single line, with a separate shuttle service on Shengavit-Charbakh branch, and covers, with trains running every five minutes from 6:30 a.m. till 11 p.m. It served about 60,000 passengers per day before a fare increase, In 2012, 14.9 million passengers rode the metro. but ridership fell by almost 20% to 50,000 passengers per day after the doubling of the fare. The system employs about 1,200 workers. A peculiar feature of the metro is that the digital timers/clocks count up, i.e. they reset to "00:00" when a train departs, and keep counting up until the next train leaves. It is necessary for passengers to be aware that trains, in general, arrive/depart every 5 minutes or so.
Due to Yerevan's uneven landscape, the metro in some cases goes above ground. Of the ten stations; seven are underground of which one is a single-vault shallow level, and the rest are pylon deep-level stations. Continuing the tradition of all ex-Soviet underground systems, most of the stations are exquisitely decorated, often blending Armenian national motifs with late-Soviet architecture.
When the system opened it initially had no depot, and service bays in the reversal sidings were used to make minor repairs instead. The proper depot Charbakh was opened in 1985 as part of the second extension. In the early 1990s the metro system had a total of 70 cars forming approximately 12 three-carriage trains. However, since then the intermediate carriages were sold to the Moscow and Saint-Petersburg systems in return for overhaul repairs on the driving cars.
In 2000–2001, for economic reasons, all of the intermediate 81-714 carriages stopped operating and the system currently has only 13 81-717 two-carriage trains running,.
The annual budget for Yerevan Metro in 2002 was 1 billion 440 million drams. Of this amount about 800 million drams was financed by the State. The rest of the budget was allocated from tickets costs, trade and advertisement. A ride on the Yerevan Metro currently costs 100 drams.
In 2012–2014 81-717 carriages were refurbished. After the refurbishment trains were given the same exterior and interior as the 81-71M trains in Prague.

Plans

Despite the optimism of the growing city, today the Metro is underfunded and does not form the main transport artery of the city. It has had practically no extensions since 1989. In the city budget, which is still having to make provisions for the repair of the damage done in the horrendous 1988 earthquake, the metro lacks priority. The next extension will be to the Achapnyak and Nazarbekyan stations.
Moreover, since the Metro did not manage to connect the important residential districts before the earthquake and the economic crises that took place following the nation's declaration of independence, minibus routes have taken over as the backbone of Yerevan's urban transport, often doubling the Metro routes. In 2004 the annual ridership numbers were 12.1 million. This trend, however, has reversed in recent years as the city's congested road arteries have encouraged commuters to see the metro as a quick, clean and affordable transit alternative. As of 2016, the annual ridership of the metro had increased to 15.4 million annual passengers. By 2017, the annual ridership further increased to 16.2 million passengers.
Although the current building progress is distant, there are plans for a second and third lines to eventually open, forming a typical Soviet triangle design layout of six radii, intersecting in the city centre. It was reported in March 2013 that city officials were approaching banks to seek loans for an expansion of the Yerevan Metro system. In 2018, Armen Gularyan the deputy chairman of Armenia's Urban Development Committee discussed the possibility of constructing another subway station on the already existing line. This proposed stop, between the Sasuntsi David and Andranik stations would offer direct access to the Surmalu and Petak shopping malls. It is unclear whether this proposal will be included in the new metro extension plan.
On 15 May 2019 the chief architect of Yerevan confirmed that plans are now underway to begin the expansion of Yerevan metro. He expressed hope that the designing works of the new subway station in the Ajapnyak District will be completed shortly and that construction works will launch in early 2020. Also in 2019, Mayor of Yerevan Hayk Marutyan announced that the preliminary stages have begun to extend the metro northward to Davtashen District.

Renovation

The Yerevan Metro will be thoroughly renovated for the first time since its founding 30 years ago, with funds of about $41 million allotted by the European Union. A drainage system construction, one of the preconditions for the subway's security will be done first. Additionally, with the assistance of the European Bank for Reconstruction and Development, tunnels were upgraded, metro cars were renovated and new logistical equipment was installed. The renovation was fully finished by 2012.

Tokens

Rather than tickets, passengers are sold tokens, which are then used to operate turnstiles in order to reach station platforms. The orange plastic tokens issued since 2009 depict the metro's logo on one side and the city's statue of David of Sassoun on the other.