Zibo–Dongying railway


The Zibo–Dongying railway or Zidong railway, also called the Zhangdian–Dongying railway or Zhangdong railway, is a railroad in Shandong Province of northern China, between Zibo and Dongying. The railway has a total length of. and was completed in 1972. The line branches off of the Jiaozhou–Jinan railway at the Zhangdian station near Zibo. Major cities and towns along route include Zibo, Boxing County, and Dongying. The railway now runs only one pair of passenger transporting line: Dongying–Jinan intercity line.
From Apr 14th 2016, Zidong railway began upgrading with total investment of 1.1 Billion RMB, and the scheduled completion date is the end of 2017. After this upgrade, the rail speed limit of Zidong railway will upgrade from less than 50 km/h to 120 km/h. Dongying will be fully connected with Qingdao–Jinan railway within 1 hour, and travel time between Dongying and Jinan will be shortened from 3.5h to 2h.

Rail Connections