Zip (roller coaster)


Zip or Zipp was a steel-framed wooden roller coaster which operated at Oaks Amusement Park in Portland, Oregon. The coaster was a more compact variant of the Giant Cyclone Safety Coasters which were built by Harry Traver of the Traver Engineering Company in the mid to late 1920s.

History and design

One of Harry Traver's more obscure coasters, the Zip was modeled on the larger Giant Cyclone Safety Coasters but was smaller and more compact. The coaster was originally planned to be in length, but this length was reduced so as not to impinge on a nearby trolley right-of-way. The undulating jazz track characteristic of Traver Cyclones was also shortened by. The coaster was also built on a wooden deck to protect it from Willamette River flooding. The coaster was removed in 1934 as a result of high maintenance and insurance costs. The coaster was dismantled and the steel sold to Japan in that same year.
Few photographs were preserved of the Zip. Robert Cartmell, in his book The Incredible Scream Machine: A History of the Roller Coaster, described the stunned reaction of attendees at an American Coaster Enthusiasts meeting when photographic slides of the Zip were first shown. " as if some primeval nightmare had been projected on the screen" Cartmell wrote, and called the coaster "a ride bordering on the macabre".

Ride experience

While most Traver Cyclones had 10-car trains, the Zip differed by having shorter 5-car trains. The way these shorter trains zipped along the track is thought to be responsible for the name of the coaster. Like other Traver coasters, the ride had very steep banking. The first curve had an angle of 80 degrees.
It has also been suggested that the shorter trains may have created an even rougher experience than was typical for a Traver Cyclone. It was described as a "rib tickler", where the side-to-side motion of the cars would slam riders' ribs to either sides of the cars. This led to problems of low ridership that plagued the other Giant Cyclone Safety Coasters. The smaller-than-usual trains, which like the other Cyclones could only run one-at-a-time, also contributed to this problem.