92nd Engineer Battalion


The 92nd Engineer Battalion is a unit of the United States Army with a record of accomplishment in both peace and war; an organization that provides sustained engineer support across the full spectrum of military operations.
The 92nd Engineer Battalion Headquarters provides training and readiness assistance to six companies and two detachments located on Fort Stewart, Georgia. The battalion formation includes two horizontal construction companies, one vertical construction company, one forward support company, one route clearance company, headquarters and headquarters company, a survey detachment, and a firefighter detachment prepared to deploy in support of contingency operations worldwide.
The 92nd Engineer Battalion is one of the Army’s first modular engineer battalion headquarters. The unit’s history of service begins in 1933 with deployments to Britain, North Africa, Italy during World War II, Vietnam War, hurricane relief efforts, Desert Storm/Shield and numerous deployments in support of the Global War on Terrorism in Iraq and Afghanistan.
The battalion nickname is "Black Diamonds".

Unit crest

The distinctive unit insignia is directly related to the Battalion's history. The four points of the diamond represent the four campaigns in which the Battalion participated during World War II. The cross is symbolic of the royal arms of Italy, the country in which the four campaigns took place. The colors of the crest, scarlet and white, are the colors of the Army Corps of Engineers. GLORIA AD CAPUT VENIRE is the battalion motto and translated means GLORY IN ACHIEVEMENT.
Approved on 19 January 1956, the Coat of Arms consists of two crossed bamboo poles, an upright sword as well as a green disk with gold star in the center, placed above the scarlet and white shield with the black diamond symbol in the center. This represents the unit's war service in Vietnam. According to The Institute of Heraldry, "The crossed bamboo poles symbolize the general support, rebuilding and construction projects of the 92d Engineer Battalion. The green disc alludes to the tropical region and the five-pointed star represents the four Meritorious Unit Commendations and the Vietnamese Civil Action Medal awarded the unit."

Battalion motto

Glory in Achievement – LTC Harry W. Lombard, Commander of the 92D Engineer Battalion, in 1967, recorded this definition in the Battalion records, of the meaning associated with the motto. "A word is shallow, a promise unfullfilled, a battle never won until the object we have sought is ours. Then there is success, and glory in achievement. This is our goal: Our words, commands; each promise is kept; the battle won. In peace and war it is not the task at hand that matters but the manner in which it is undertaken. When any group puts forth their all in a combined effort, and by so doing accomplishes its mission, it has attained the highest honor – Glory in Achievement."

Essayons

Let us Try – The is rich in history; built the earth works at Bunker Hill, the bridges at the Imjin River in Korea, and the port at Cam Ranh in Vietnam. "Engineer Soldiers have been shelled, bombed, starved and frozen, but, no matter how hopeless the situation seemed, the officers and Soldiers never forgot, ESSAYONS".
The Corps' mission is to "Deliver vital public and military engineering services; partnering in peace and war to strengthen our Nation’s security, energize the economy and reduce risks from disasters".

Unit history

The 92nd Engineer General Service Regiment was constituted an inactive unit of the Regular Army, effective 1 October 1933, as the 51st Engineer Battalion. The unit was redesignated on 1 January 1938, as the 92nd Engineer Battalion and activated on 1 May 1941 at Fort Leonard Wood, Missouri. The enlisted cadre for the 92nd Engineer Battalion was furnished by the 41st Engineer Regiment and numbered 49 men. The officers were drawn from the Regular Army and members of the Officers Reserve Corps on active duty.
The unit was reorganized and redesignated, effective 22 May 1942, as the 92nd Engineer Regiment. On 1 July 1942, the organization sailed aboard the USAT Thomas H. Barry from the New York Port of Embarkation. Landing in Scotland on 13 July, the regiment was assigned to Southern Base Section of SOS, ETOUSA, with station near Taunton, Somerset, in southwestern England. The regiment was the first American unit in that part of Britain. On 1 August 1942, the unit designation was changed to 92nd Engineer General Service Regiment.
The Regiment sailed from Scotland arriving at Oran, Algeria, in French North Africa on 16 February 1943, and was assigned to the Mediterranean Base Section. In April the unit was attached to the Fifth Army Invasion Training Center in preparation for the Sicily and Salerno operations.

World War II

On 14 November 1943, the unit sailed from North Africa and landed at Naples on 17 November. The 92nd Engineers deployed to Italy earning four campaign streamers during World War II:
The four points of the black diamond on the unit crest represent these four campaigns. During this time the Regiment became known as the "Can Do Regiment."
Due to the reduction in military strength following World War II, the Regiment was deactivated in Italy 20 April 1946; the unit remained inactive for eight years. While still in an inactive status – Headquarters, Headquarters and Service Company, and Companies Alpha, Bravo, and Charlie were redesignated as the 92nd Engineer Battalion on 25 February 1954. The remainder of the Regiment was disbanded.
Reactivated on 9 February 1955, as the 92nd Engineer Battalion at Fort Bragg, North Carolina, the unit was attached to 20th Engineer Brigade, XVIII Airborne Corps. Reorganization added Company Delta and redesignated Company A as an Equipment and Maintenance Company.
Hurricane Connie and Hurricane Dianne left the beaches of South Carolina scarred and bruised, Company C was sent with its personnel and equipment to restore the beaches in the stricken areas. After 90 days of operation the unit returned to Fort Bragg.
On 7 June 1965, Company C reinforced plus a Battalion Headquarters Planning Section deployed to the Dominican Republic to support the Inter American Peace Force during the Dominican Republic Crisis. Within the combat area the Construction Force built a logistical complex to support all the forces in Theater. The unit returned 8 February 1966, after having been designated the most outstanding engineer unit within the Continental United States.
On 15 June 1965, Company D moved to Fort Rucker, Alabama to support the United States Army Aviation Center. This company deployed separately from Fort Rucker to Southeast Asia on 30 January 1967.

Vietnam War

On 27 May 1967, the rest of the battalion was ordered to the Republic of Vietnam. During the Vietnam War the "Can Do Regiment" became known as the "Black Diamonds" for their distinctive unit crest. Once in country, the battalion quickly demonstrated the high levels of enthusiasm and professionalism which had characterized their actions in previous times of crisis. The battalion constructed warehouses, motor pool sheds, chapels, airfields, pipeline systems, barracks and a 1000-foot MLC 50 bridge. Additionally, the 92nd, maintained supply routes and operated a rock quarry. It was stationed at Long Binh under the 159th Engineer Group throughout its service in Vietnam.
From 2 May 1967 through 27 July 1972, the Battalion distinguished itself in 14 campaigns:
The Battalion received four Meritorious Unit Commendations for the periods 1967, 1968–69, 1969–70, and 1970–71. The unit also received the Vietnamese Civil Action Honor Medal, First Class for the period 1967–70. On 26 July 1972, the 92nd left Vietnam and returned stateside to Fort Stewart, Georgia. Delta Company was reformed at Fort Gordon, Georgia.
All of the engineer support for the security forces sent to Florida for the National Political Nominating Conventions was supplied by "Chargin’ Charlie Company" at Homestead Air Force Base. In March and June, 1972, the unit received the "Bloodhound Award" in recognition of its exemplary participation in the quarterly Bloodmobile visit to the Hunter/Stewart Complex. This was the first time a unit had won three consecutive "Bloodhounds". In June 1976, the unit was redesignated as the 92nd Engineer Battalion .
During the period 1 August 1987 to 31 July 1988, the Battalion supported a series of worldwide deployments both in support of Joint Service exercises and to provide humanitarian assistance. The missions were to numerous locations, including Haiti, the Dominican Republic, Cuba, Bahamas, the jungles of South America and the deserts of East Africa. For this effort, the Battalion was awarded the Army Superior Unit Award. The Battalion was recognized again in the fall of 1988, with the National Humanitarian Award for hurricane relief provided during Hurricanes Connie, Dianne, Hugo, and Andrew.

Operation Desert Storm

92nd Engineer Combat Battalion (Heavy) A, B, C and D Companies – October 1990 to April 1991

On 15 October 1990, the 92nd deployed to Damman, Saudi Arabia, where it subsequently went on to successfully complete 40 missions during Operation Desert Shield and 68 missions during Operation Desert Storm. Of the seven top priority construction engineer projects, as designated by both XVIII Airborne Corps and VII Corps, the Black Diamonds were assigned and completed five in a little over six months. This included completion of 566 kilometers of road construction for both corps, constructing a major VII Corps logistics base, and a 4300’ asphalted airstrip for theater casualty evacuation. The Battalion relocated five times into, and out of, three countries – Saudi Arabia, Iraq, and Kuwait. Throughout, the unit successfully completed all assigned missions and gained the reputation of being a proactive, responsive engineer battalion. The Battalion was awarded campaign streamers for the defense of Saudi Arabia and the Liberation and Defense of Kuwait, and received its fifth Meritorious Unit Commendation. The individuals of the battalion were awarded 48 Bronze Star Medals and 297 Army Commendation Medals from 3rd Armored Division and the 926th Engineer Group.

Operation Enduring Freedom

Following the terrorist attacks of September 11, 2001, under command of Lieutenant Colonel Curtis Thalken, an element of Headquarters Company together with A and B Companies and a platoon from the 306th Engineer Company of the US Army Reserves, were deployed in support of 10th Mountain Division and the 101st Airborne Division. The immediate mission was to provide rapid runway repair, clear multiple aircraft wrecks, build a detainee holding cell, construct base camps and administrative facilities, construct seven kilometers of roads, construct sewerage and a water treatment facility, construct thousands of feet of survivability ditches and conduct mine clearing operations.
The battalion deployed in two phases. Initially, the battalion commander with a headquarters element and Company B, initially deployed by air via Rhein–Main Air Force Base to the former Soviet airfield at Karshi-Khanabad, Uzbekistan. Company B later moved to Bagram, Afghanistan in direct support of 10th Mountain Division. The remainder of the battalion, under the command of battalion executive officer Major Stephen C. Larsen, organized for deployment directly into Afghanistan two months later.
During the second phase, the deployed headquarters element relocated to the largely destroyed international airport at Kandahar, Afghanistan in direct support of the 3rd Brigade "Task Force Rakkasans", 101st Airborne Division, receiving additional Headquarters Company assets and the deploying Company A under the command of Captain Stephanie Ahern. Captain Ahern is likely the first female US Army officer to command an engineer company in combat. Company A deployed by air via a Pacific Ocean route with trans-loading from US Air Force C-5 aircraft to C-17 aircraft at the island of Diego Garcia in the Indian Ocean.
This complex, two-phase operation constituted the largest aerial deployment of heavy combat construction equipment and personnel at that time.
These elements of the 92nd, the only deployed engineer battalion in the Army at that time, built what was to be the U.S. and coalition forces’ initial base camp, staging area and port for debarkation of humanitarian aid to Afghanistan. Prior to the Battalion's arrival, the camps were essentially open fields with few buildings, no electricity, no running water or adequate drainage. At Kandahar, unexploded ordnance and nightly rocket attacks on the base from enemy forces were common. The runways were cratered from aerial attacks and littered with destroyed aircraft, significantly degrading air operations and presenting a significant threat from unexploded ordnance. There was no waste incineration or sanitary waste-water treatment. All of these issues were corrected. Additionally, the battalion organized and conducted quarry operations near the airport providing material for rapid runway repair and road building.
Occasionally, A and B companies were effectively reorganized as infantry providing perimeter security at the camps while the infantry units were on mission, one of which was Operation Anaconda 1–18 March 2002. Mines were also troublesome to the engineers’ day-to-day operations, many of which remained from the Soviet Union's previous occupation of the country. Between Bagram and Kandahar, the mine-clearing D7 bulldozers detonated 125 mines without casualty.
Maj. Gen. Buford C. Blount III, 3rd Infantry Division commanding general, presented 38 Soldiers with Bronze Star Medals. More than 230 Soldiers in the Battalion were awarded the Army Commendation Medal.

Iraq War

In April 2003, the 92nd deployed in support of Operation Iraqi Freedom I. The Battalion worked from Tallil Airbase just outside An Nasiriyah to develop living and logistics sustainment facilities along the main supply route.
In January 2005, the Battalion deployed to Baghdad in support of OIF 04-06 to provide general construction engineering and chemical force protection support. 92nd completed 276 construction missions, including the construction of an Iraqi tank gunnery range, a headquarters and airfield complex for the 3rd Armored Cavalry Regiment, numerous battalion and brigade headquarters SEA Huts and the repair of over 100 IED craters.
From October 2006 to October 2007, the Battalion was deployed to Balad Air Base, Cp Striker, Cp Delta, and Talil Air Base, Iraq in support of OIF 06-08. During the deployment, the Black Diamonds completed over 700 combat and construction missions worth over $50 million, earning its eighth Meritorious Unit Commendation. The Battalion consisted of over 1200 Soldiers, sailors and Airmen who executed the full spectrum of engineering operations in support of Multinational Corps–Iraq. During the surge the battalion constructed the base camp facilities for the 3/3 BCT at FOB Hammer, 4/2 BCT at Camp Taji, 4 Joint Security Stations in support of the 25th Infantry Division, 3 Combat Outposts in support of 2/3 BCT and renovated an existing building to serve as the 3d Infantry Division Headquarters. 92nd along with 557th Expeditionary RED HORSE Squadron, completed an impressive list of individual construction projects at Besmaya, including erecting 223 tents in three Life Support Areas; 14 kilometers of 10-foot high, triple-strand, concertina wire topped berm; two million gallons of black and grey water lagoon capacity; an 850,000 gallon bulk fuel farm; a 6 million gallon raw water processing plant; six motor pools and two helicopter pads. As a part of the MNC-I's counter IED mission the battalion completed repair of over 700 IED craters, sanitized over 100 kilometers of Main Supply Routes, completed 8 major road repairs and installed 12 fixed bridges, enhancing mobility throughout the Corps.

Operation Enduring Freedom

92nd Engineer Battalion – HHC, FSC, 526, 984, 554, 36th DET

In May 2010, the Black Diamonds deployed to Afghanistan as part of the surge of 30,000 additional American Soldiers. The battalion constructed new, and upgraded existing, combat outposts and forward operating bases in support of Coalition and Afghan units. Their efforts directly resulted in the increased combat effectiveness of 15 battalion- and brigade-level task forces across Regional Command-East at a critical period of the campaign.

530th Route Clearance Company – March 2011 to March 2012

On 12 March 2011, the 530th Bloodhounds deployed to Forward Operating Base Sarkari Karez, Afghanistan in the Helmand province to conduct route clearance. In May 2011, the company moved to the Kandahar province and split into two elements. First and second platoon conducted clearance operations in and around FOB Lagman, and later FOB Walton, while third and fourth platoon moved to FOB Spin Boldak in southern Afghanistan near the Pakistan border. The Bloodhound efforts reduced 147 IEDs in southern Afghanistan; 80,000 kilometers of improved and unimproved roads were cleared. Effectively employed multiple Mine Clearing Linear Charges and eight Antipersonnel Obstacle Breaching Systems during route and area clearance operations; cross-trained maneuver counterparts on both devices. Executed a responsible Relief In Place – Transfer Of Authority with two Mobility Augmentation Companies at two FOBs separated by over 100 km in RC-South.
Awarded 19 Purple Hearts and 65 Combat Action Badges during deployment; redeployed every Bloodhound from Afghanistan. The company returned to Fort Stewart on 12 March 2012.

92nd Engineer Battalion – HHC, FSC, 526, 984, 554, 36th DET – February 2013 to November 2013

Most recently, the Black Diamonds deployed in support of Operation Enduring Freedom 13, to conduct retrograde operations and reduce the Army's footprint in Afghanistan. As the second engineer battalion to be part of the CENTCOM Materiel Retrograde Element mission, the 92nd Engineer Battalion completed over fifteen engineer work requests and contributed to the closure or transfer of two Tactical Infrastructures, nine Tactical Bases, and one Operational Base with focus in Regional Command's South, Southwest and West. Forward Support Company completed over twenty-eight Combat Logistic Patrols covering over 4,000 miles in RC South, served more than 25,000 meals to fellow Black Diamonds and mechanical support at six different locations. 526th Horizontal Construction Engineers, 554th Vertical Construction Engineers, and 984th Horizontal Construction Engineers deconstruction efforts directly contributed to the CMRE mission to retrograde with a focus to consolidate troops and equipment in Afghanistan. 526 Gladiators completed projects at five bases stretching across RC's South and Southwest. 554 Assassins completed projects at seven bases stretching across RC's South, Southwest and West. 984 Warriors completed projects at seven bases stretching across RC's South and Southwest.

Company lineage

HHC – Headhunters, FSC – Coldsteel, 526th – Gladiators, 554th – Assassins, 530th – Bloodhounds

526th Engineer Company

Campaign participation credit

World War II

Campaign participation credit

World War II

Campaign participation credit

World War II
Vietnam War

530th Engineer Company

Campaign participation credit

World War II

Detachments

36th Engineer Detachment

THE CAN DO CREW
YearDateEvent
194526 JuneConstituted in Army of the United States as the 3336th Engineer Refrigeration Maintenance Detachment
194526 JulyActivated in France
194512 NovemberInactivated in France
19535 FebruaryRedesignated as the 36th Engineer Water Tank Detachment and allotted to the Regular Army
195310 AprilActivated in Korea
19541 AprilReorganized and redesignated as the 36th Engineer Detachment
195520 JanuaryInactivated in Korea
195715 OctoberActivated in Japan
195925 MarchInactivated in Korea
196326 MarchActivated at Fort Benning, Georgia
196917 FebruaryInactivated in Vietnam
197030 OctoberActivated at Fort Benjamin Harrison, Indiana
198715 AugustInactivated at Fort Benjamin Harrison, Indiana
200816 OctoberActivated at Fort Stewart, Georgia

Campaign participation credit

Korean War

Campaign participation credit

World War II