Ariane 5


Ariane 5 is a heavy-lift space launch vehicle developed and operated by Arianespace for the European Space Agency. It is launched from the Guiana Space Centre in French Guiana. It has been used to deliver payloads into geostationary transfer orbit or low Earth orbit. A direct successor system, Ariane 6, is in development.
The system was originally designed as an expendable launch system by the Centre national d'études spatiales, the French government's space agency, in close cooperation with Germany and other European partners. Despite not being a direct derivative of its predecessor rocket program, it is classified as part of the Ariane rocket family. Airbus Defence and Space is the prime contractor for the vehicles, leading a multi-country consortium of other European contractors. ESA originally designed Ariane 5 to launch the Hermes spaceplane, and thus it is rated for human space launches.
Since its first launch, Ariane 5 has been refined in successive versions: "G", "G+", "GS", "ECA", and most recently, "ES". The system has a commonly used dual-launch capability, where up to two large geostationary belt communication satellites can be mounted using a SYLDA carrier system. Up to three, somewhat smaller, main satellites are possible depending on size using SPELTRA. Up to eight secondary payloads, usually small experiment packages or minisatellites, can be carried with an ASAP platform.
As of , Arianespace had signed contracts for Ariane 5 ECA launches up through 2023, approximately two years following the planned introduction of Ariane 6 in early 2021.

Vehicle description

Cryogenic main stage

Ariane 5's cryogenic H173 main stage is called the EPC. It consists of a large tank 30.5 metres high with two compartments, one for liquid oxygen and one for liquid hydrogen, and a Vulcain 2 engine at the base with a vacuum thrust of. The H173 EPC weighs about 189 tonnes, including 175 tonnes of propellant. After the main cryogenic stage runs out of fuel, it re-enters the atmosphere for an ocean splashdown.

Solid boosters

Attached to the sides are two P241 solid rocket boosters, each weighing about 277 tonnes full and delivering a thrust of about. They are fueled by a mix of ammonium perchlorate and aluminum fuel and HTPB. They each burn for 130 seconds before being dropped into the ocean. The SRBs are usually allowed to sink to the bottom of the ocean, but, like the Space Shuttle Solid Rocket Boosters, they can be recovered with parachutes, and this has occasionally been done for post-flight analysis.. The most recent attempt was for the first Ariane 5 ECA mission. One of the two boosters was successfully recovered and returned to the Guiana Space Center for analysis. Prior to that mission, the last such recovery and testing was done in 2003.
The French M51 SLBM shares a substantial amount of technology with these boosters.
In February 2000, the suspected nose cone of an Ariane 5 booster washed ashore on the South Texas coast, and was recovered by beachcombers before the government could get to it.

Second stage

The second stage is on top of the main stage and below the payload. The original Ariane—Ariane 5 G—used the EPS, which was fueled by monomethylhydrazine and nitrogen tetroxide, containing of storable propellant. The EPS was subsequently improved for use on the Ariane 5 G+, GS, and ES. Ariane 5 ECA uses the ESC, which is fueled by liquid hydrogen and liquid oxygen.
The EPS upper stage is capable of multiple ignitions, first demonstrated during flight V26 which was launched on 5 October 2007. This was purely to test the engine, and occurred after the payloads had been deployed. The first operational use of restart capability as part of a mission came on 9 March 2008, when two burns were made to deploy the first Automated Transfer Vehicle into a circular parking orbit, followed by a third burn after ATV deployment to de-orbit the stage. This procedure was repeated for all subsequent ATV flights.

Fairing

The payload and all upper stages are covered at launch by a fairing for aerodynamic stability and protection from heating during supersonic flight and acoustic loads. It is jettisoned once sufficient altitude has been reached. It is made by Ruag Space and since flight VA-238 it is composed of 4 panels.

Variants

Launch system status:

Launch pricing and market competition

, the Ariane 5 commercial launch price for launching a "midsize satellite in the lower position" was approximately, competing for commercial launches in an increasingly competitive market.
The heavier satellite is launched in the upper position on a typical dual-satellite Ariane 5 launch is priced higher than the lower satellite, on the order of .
Total launch price of an Ariane 5 — which can transport up to two satellites to space, one in the "upper" and one in the "lower" positions — is around 150 million Euro as of January 2015.

Future developments

Ariane 5 ME

The Ariane 5 ME was in development into early 2015, and was seen as a stopgap between / and the new Ariane 6. With first flight planned for 2018, it would have become ESA's principal launcher until the arrival of the new Ariane 6 version. ESA halted funding for the development of Ariane 5 ME in late 2014 to prioritize development of Ariane 6
The Ariane 5 ME was to use a new upper stage, with increased propellant volume, powered by the new Vinci engine. Unlike the HM-7B engine, it was to be able restart several times, allowing for complex orbital maneuvers such as insertion of two satellites into different orbits, direct insertion into geosynchronous orbit, planetary exploration missions, and guaranteed upper stage deorbiting or insertion into graveyard orbit. The launcher was also to include a lengthened fairing up to 20 m and a new dual launch system to accommodate larger satellites. Compared to an Ariane 5 ECA model, the payload to GTO was to increase by 15% to 11.5 tonnes and the cost-per-kilogram of each launch is projected to decline by 20%.

Development

Originally known as the Ariane 5 ECB, was to have its first flight in 2006. However, the failure of the first ECA flight in 2002, combined with a deteriorating satellite industry, caused ESA to cancel development in 2003. Development of the Vinci engine continued, though at a lower pace. The ESA Council of Ministers agreed to fund development of the new upper stage in November 2008.
In 2009, EADS Astrium was awarded a €200 million contract, and on April 10, 2012 received another €112 million contract to continue development of the Ariane 5 ME with total development effort expected to cost €1 billion.
On 21 November 2012, ESA agreed to continue with the Ariane 5 ME to meet the challenge of lower priced competitors. It was agreed the Vinci upper stage would also be used as the second stage of a new Ariane 6, and further commonality would be sought. Ariane 5 ME qualification flight was scheduled for mid-2018, followed by gradual introduction into service.
On 2 December 2014, ESA decided to stop funding the development of Ariane 5 ME and instead focus on Ariane 6, which was expected to have a lower cost per launch and allow more flexibility in the payloads.

Solid propellant stage

Work on the Ariane 5 EAP motors has been continued in the Vega programme. The Vega 1st stage engine — the P80 engine — is a shorter derivation of the EAP. The P80 booster casing is made of filament wound graphite epoxy, much lighter than the current stainless steel casing. A new composite steerable nozzle has been developed while new thermal insulation material and a narrower throat improve the expansion ratio and subsequently the overall performance. Additionally, the nozzle now has electromechanical actuators which have replaced the heavier hydraulic ones used for thrust vector control.
These developments will probably later make their way back into the Ariane programme. The incorporation of the ESC-B with the improvements to the solid motor casing and an uprated Vulcain engine would deliver to LEO. This would be developed for any lunar missions but the performance of such a design may not be possible if the higher Max-Q for the launch of this rocket poses a constraint on the mass delivered to orbit.

Ariane 6

The design brief of the next generation rocket called for a lower-cost and smaller rocket capable of launching a single satellite of up to 6.5 tonnes to GTO. However, after several permutations the finalized design was nearly identical in performance to the Ariane 5, focusing instead on lowering fabrication costs and launch prices.
Development is projected to cost €4 billion. In 2018, its first test launch was set to not earlier than July 2020., Ariane 6 was projected to be launched for about €70 million per flight or about half of the Ariane 5 current price.

Notable launches

Ariane 5's first test flight on 4 June 1996 failed, with the rocket self-destructing 37 seconds after launch because of a malfunction in the control software. A data conversion from 64-bit floating point value to 16-bit signed integer value to be stored in a variable representing horizontal bias caused a processor trap because the floating point value was too large to be represented by a 16-bit signed integer. The software was originally written for the Ariane 4 where efficiency considerations led to four variables being protected with a handler while three others, including the horizontal bias variable, were left unprotected because it was thought that they were "physically limited or that there was a large margin of safety". The software, written in Ada, was included in the Ariane 5 through the reuse of an entire Ariane 4 subsystem despite the fact that the particular software containing the bug, which was just a part of the subsystem, was not required by the Ariane 5 because it has a different preparation sequence than the Ariane 4.
The second test flight was a partial failure. The Vulcain nozzle caused a roll problem, leading to premature shutdown of the core stage. The upper stage operated successfully, but it could not reach the intended orbit. A subsequent test flight proved successful and the first commercial launch occurred on 10 December 1999 with the launch of the XMM-Newton X-ray observatory satellite.
Another partial failure occurred on 12 July 2001, with the delivery of two satellites into an incorrect orbit, at only half the height of the intended GTO. The ESA Artemis telecommunications satellite was able to reach its intended orbit on 31 January 2003, through the use of its experimental ion propulsion system.
The next launch did not occur until 1 March 2002, when the Envisat environmental satellite successfully reached an orbit above the Earth in the 11th launch. At, it was the heaviest single payload until the launch of the first ATV on 9 March 2008.
The first launch of the ECA variant on 11 December 2002 ended in failure when a main booster problem caused the rocket to veer off-course, forcing its self-destruction three minutes into the flight. Its payload of two communications satellites, valued at about EUR 630 million, was lost in the Atlantic ocean. The fault was determined to have been caused by a leak in coolant pipes allowing the nozzle to overheat. After this failure, Arianespace SA delayed the expected January 2003 launch for the Rosetta mission to 26 February 2004, but this was again delayed to early March 2004 due to a minor fault in the foam that protects the cryogenic tanks on the Ariane 5. As of June 2017, the failure of the first ECA launch was the last failure of an Ariane 5; since then, 82 consecutive launches have been successful, from April 2003 with the launch of INSAT-3A and Galaxy 12 satellites, to flight 240 in December 2017.
On 27 September 2003, the last Ariane 5 G boosted three satellites, in Flight 162. On 18 July 2004, an Ariane 5 G+ boosted what was at the time the heaviest telecommunication satellite ever, Anik F2, weighing almost.
The first successful launch of the Ariane 5 ECA took place on 12 February 2005. The payload consisted of the XTAR-EUR military communications satellite, a 'SLOSHSAT' small scientific satellite and a MaqSat B2 payload simulator. The launch had been originally scheduled for October 2004, but additional testing and the military requiring a launch at that time delayed the attempt.
On 11 August 2005, the first Ariane 5 GS boosted Thaïcom-4/iPStar-1, the heaviest telecommunications satellite to date at, into orbit.
On 16 November 2005, the third Ariane 5 ECA launch took place. It carried a dual payload consisting of Spaceway-F2 for DirecTV and Telkom-2 for PT Telekomunikasi of Indonesia. This was the rocket's heaviest dual payload to date, at more than.
On 27 May 2006, an Ariane 5 ECA rocket set a new commercial payload lifting record of 8.2 tonnes. The dual-payload consisted of the Thaicom 5 and Satmex 6 satellites.
On 4 May 2007, the Ariane 5 ECA set another new commercial record, lifting into transfer orbit the Astra 1L and Galaxy 17 communication satellites with a combined weight of 8.6 tonnes, and a total payload weight of 9.4 tonnes. This record was again broken by another Ariane 5 ECA, launching the Skynet 5B and Star One C1 satellites, on 11 November 2007. The total payload weight for this launch was.
On 9 March 2008, the first Ariane 5 ES-ATV was launched to deliver the first ATV called Jules Verne to the International Space Station. The ATV was the heaviest payload ever launched by a European rocket, providing supplies to the space station with necessary propellant, water, air and dry cargo. This was the first operational Ariane mission which involved an engine restart in the upper stage..
On 1 July 2009, an Ariane 5 ECA launched TerreStar-1, which was then, at, the largest and most massive commercial telecommunication satellite ever built at that time until being overtaken by Telstar 19 Vantage, at, launched aboard Falcon 9.
On 28 October 2010, an Ariane 5 ECA launched Eutelsat's W3B and Broadcasting Satellite System Corporation 's BSAT-3b satellites into orbit. But the W3B satellite failed to operate shortly after the successful launch and was written off as a total loss due to an oxidizer leak in the satellite's main propulsion system. The BSAT-3b satellite, however, is operating normally.

GTO payload weight records

On 22 April 2011, the Ariane 5 ECA flight VA-201 broke a commercial record, lifting Yahsat 1A and Intelsat New Dawn with a total payload weight of 10,064 kg to transfer orbit. This record was later broken again during the launch of Ariane 5 ECA flight VA-208 on 2 August 2012, lifting a total of 10,182 kg into the planned geosynchronous transfer orbit, which was broken again 6 months later on flight VA-212 with 10,317 kg sent towards geosynchronous transfer orbit. In June 2016 the GTO record was raised to 10,730 kg, on the first rocket in history that carried a satellite dedicated to financial institutions. The payload record was pushed a further 5 kg to on 24 August with the launch of Intelsat 33e and Intelsat 36. On 1 June 2017, the payload record was broken again to carrying ViaSat 2 and Eutelsat 172B.

VA241 anomaly

On 25 January 2018, an Ariane 5 ECA launched SES-14 and Al Yah 3 satellites. About 9 minutes and 28 seconds after launch, a telemetry loss occurred between the rocket and the ground controllers. It was later confirmed, about 1 hour and 20 minutes after launch, that both satellites were successfully separated from the upper stage and were in contact with their respective ground controllers, but that their orbital inclinations were incorrect as the guidance systems might have been compromised. Therefore, both satellites conducted orbital procedures, extending commissioning time. SES-14 needed about 4 weeks longer than planned commissioning time, meaning that entry into service was reported early September instead of July. Nevertheless, SES-14 is still expected to be able to meet the designed lifetime. This satellite was originally to be launched with more propellant reserve on a Falcon 9 rocket since the Falcon 9, in this specific case, was intended to deploy this satellite into a high inclination orbit that would require more work from the satellite to reach its final geostationary orbit. The Al Yah 3 was also confirmed healthy after more than 12 hours without further statement, and like SES-14, Al Yah 3's maneuvering plan was also revised to still fulfill the original mission. As of 16 February 2018, Al Yah 3 was approaching the intended geostationary orbit, after series of recovery maneuvers had been performed. The investigation showed that invalid inertial units' azimuth value had sent the vehicle 17° off course but to the intended altitude, they had been programmed for the standard geostationary transfer orbit of 90° when the payloads were intended to be 70° for this supersynchronous transfer orbit mission, 20° off norm. This mission anomaly marked the end of 82nd consecutive success streak since 2003.

Launch history

Launch statistics

Ariane 5 rockets have accumulated 107 launches since 1996, 102 of which were successful, yielding a success rate. Between April 2003 and December 2017, Ariane 5 flew 82 consecutive missions without failure, but the rocket suffered a partial failure in January 2018.

Rocket configurations

Launch outcomes

List of launches

All launches are from Centre Spatial Guyanais, Kourou, ELA-3.

Future payloads and scheduled flights


Date
Time

Serial No.
PayloadOrbitCustomersLaunch
status
1 August 2020
21:30
VA-253
ECAGTO
Q4 2020ECAGTO
H2, 2020ECAIntelsat GTOIntelsat
31 October 2021ECAJames Webb Space TelescopeSun–Earth NASA / ESA / CSA / STScI
2021ECAOvzon-3GTOOvzon
2021ECAMEASAT-3dGTOMEASAT
2021ECAMTG-I1GTOEUMETSAT
2023ECAMTG-S1GTOEUMETSAT
2021ECASES-17GTOSES S.A.
2021–2022ECASyracuse 4A GTODGA
2021–2022ECAHeinrich Hertz GTODLR
2021–2022ECASyracuse 4B GTODGA
June 2022ECAJupiter Icy Moons Explorer HeliocentricESA