Baku Metro


Baku Metro is a rapid transit system serving Baku, the capital of Azerbaijan. First opened on 6 November 1967 during the time of the Soviet Union, it has features typical of ex-Soviet systems, including very deep central stations and exquisite decorations that blend traditional Azerbaijani national motifs with Soviet ideology. At present the system has of bi-directional tracks, made up of three lines served by 25 stations. The metro is the only one constructed in Azerbaijan, and was the fifth built in the Soviet Union. In 2015, it carried 222.0 million passengers, which yielded an average daily ridership of approximately 608,200.
Baku Metro Closed Joint-Stock Company , the company which runs the Baku Metro, was founded according Decree No. 289 Of the President of the Republic of Azerbaijan on February 27, 2014 as a legal successor of Baku Metro and Azertunelmetrotikinti Joint Stock Company. Property along with rights and obligations of Baku Metro and Azertunelmetrotikinti Joint Stock Company were transferred to the newly established Baku Metro CJSC.

History

During the final decades of the Russian Empire the port city of Baku became a large metropolis due to the discovery of oil in the Caspian Sea. By the 1930s, it was the capital of the Azerbaijani SSR and the largest city in Soviet Transcaucasia. The first plans for a rapid-transit system date to the 1930s, with the adoption of a new general plan for city development. After World War II, the population passed the one million mark. a requirement of Soviet law for construction of a metro system. In 1947, the Soviet Cabinet of Ministers issued a decree authorizing its construction, which began in 1951. On November 6, 1967, Baku Metro became the Soviet Union's fifth rapid-transit system when the first 6.5 kilometers of track and a depot were inaugurated, in honor of the fiftieth anniversary of the October Revolution.
Due to the city's unique landscape, Baku Metro did not have the typical Soviet "triangle" layout of development, and instead had two elliptical lines which crossed each other in the center of the city at the Baku Railway Terminal. Thus one line would begin at the southwestern end of the city, and cross on a northeastern axis to follow the residential districts on the northern edge of the city and then snake along to the southeastern and ultimately southern end. This was inaugurated in three stages: Ulduz and Neftçilər, followed by Ahmedli and finally Hazi Aslanov, completing the first line. Additionally, in 1970 a branch was opened to a station built in a depot, Bakmil.
The second line was to parallel the Caspian coast from Hazi Aslanov through Baku's industrial districts, meeting the first line again at the Baku Railway Terminal, and then continuing westwards before turning north to join Baku's northwestern districts. To accelerate construction, a branch was opened from May 28 station to Khatai in 1968, and in 1976 in the opposite direction towards Nizami. The second and first line used the same station. This posed no serious problems initially, as the line was two stations long, but when the second stage opened in 1985, lengthening the line to 8 stations, construction of a transfer was desperately needed.
In 1993, the first stage of the transfer station Jafar Jabbarli came in operation, but the end of the Soviet Union, political unrest, military conflict in Nagorno-Karabakh and the financial collapse which followed effectively paralyzed any construction attempts in Baku. Furthermore, during the mid 1990s, three mass casualty incidents took place: on March 19 and July 3, 1994, terrorist attacks killed 27 people and injured another 91, and on October 28 of the following year a fire in a crowded train killed 289 and injured 265 others, the world's deadliest subway disaster.
In the late 1990s construction restarted. The first project was the completion of Hazi Aslanov station, partly sponsored by the European Union. In the mid-2000s, construction of the northern end of the second line, abandoned since 1994, was restarted with Nasimi station opening in October 9, 2008.

Network

Lines

Timeline

Renaming of stations

'''

Expansion plans

At present, there are several expansion projects planned, two of which are under construction. In 2011, the Chief Executive of the Baku Metro, Taghi Ahmadov, announced plans to construct up to 53 new stations by 2030. Currently, eight stations and two train depots are under construction. These will serve the new bus complex as well as Heydar Aliyev International Airport.
The signalling, supervision and telecommunication systems for Phase 1 of the Purple Line will be upgraded by Thales.
Three new stations were planned to open by 2015, according to Ahmadov; Avtovağzal Bus Terminal was scheduled to open in late 2012, while Old Gunashli and New Gunashli were planned to begin operating before 2015.
Construction of the intermediate section of the Green Line, between Khatai and Hazi Aslanov along Nobel Avenue began in August 2013 by a French–Ukrainian consortium.
The Baku Metro will be refitted with modern technologies. The new stations will be able to handle trains with up to seven cars. The stations will feature modern platforms, lobbies, and escalators as well as new signaling and control systems.

Structural units

Baku Metro Closed Joint-Stock Company embracing such important areas like subway operation and construction, has the following structural units:
Officially Baku Metro has two lines, however due to problems with opening the second part of Cəfər Cabbarlı, Baku instead operates as a large four branch system, with trains travelling from Həzi Aslanov to either İçərişəhər or Dərnəgul, branching at May 28. Rare services from both Dərnəgul and İçərişəhər also terminate at Bakmil but only twice per hour. There is a one-stop second line that operates separately between Cəfər Cabbarlı and Şah İsmail Xətai, a shuttle service using only one of the two tracks due to low demand. The second interchange station is “Memar Əcəmi" where Green and Violet Lines cross.
Due to the city's uneven landscape some stations are very deep, that could double as bomb shelters in case of a nuclear war attack, given that the system was built at the height of the Cold War in the 1950s/early 1960s. All seven of these deep level stations have a standard pylon design. The majority of the system's stations, 13, are shallow pillar-trispans. In addition one station, Bakmil, is a single platform surface level.
Like many other former Soviet systems most of the stations of the system are exquisitely decorated; many feature advanced Soviet motives in artwork and architecture such as those of progress and international culture, whilst others focus on traditional Azeri culture and history. After the collapse of the Soviet Union, several stations were renamed, and some of their decoration was altered to comply with the new ideology.

Ticketing

The system works on a flat fare of 30 qapik per trip, following a price hike on August 1, 2018. Some Baku residents were reportedly unhappy with the price hike, citing the age of the metro system's infrastructure.Until 2006, metro users accessed the stations with metal tokens placed into turnstiles. In 2006 the Baku Metro introduced an RFID card system using rechargeable fare cards, which require a 2-manat deposit.
BakuCard is a single Smart Card for payment on Baku Metro and BakuBus. The intercity buses and metro use this type of card-based fare-payment system.

Wi-fi and mobile phone coverage

Work to install free wi-fi service at Koroğlu station is now underway.
Local mobile service provider Nar Mobile has started to provide 3G coverage at Sahil, Nəsimi, 28 May, Memar Əcəmi, Azadlıq prospekti and Dərnəgül. Service will expand to all stations as well as to tunnels by May.

Rolling stock

Baku is served by one single depot, which is located next to the Bakmil surface station, and carries the same name. As of January 2005, the system had 228 cars, of which 43 five-car trains were formed, the rest used for specialist duties. The earliest set of models include the old E, Ezh, Ezh1, Ezh3 and Em-508T types, built in the 1960s and 1970s, whilst most are the 81-717/714 and their modifications which Baku has been receiving since the early 1980s.
The Baku Metro planned to purchase new trains in late 2012 from the Metrovagonmash rail car plant, near Moscow, to operate on its third line. The exact amount is not yet known, however. The trains would be built from stainless steel and equipped with air conditioners. The first rolling stock of the type 81-760/761 developed by Metrovagonmash and Alstom arrived in 2014 and is currently replacing the old model 81-717/714. Baku Metro opens its workshop on overhaul and modernisation of wagons.

Retro carriages

On 6 November 2017, a рresentation was given of the retro carriages which were restored on the occasion of the 50th anniversary of the Baku Metro. These carriages, manufactured at the end of 1934, had 52 seats and 120 standing places. Carriages of this type were sent to five cities including Moscow, Leningrad, Kiev, Tbilisi, and Baku, which received 47 carriages of this type.

Incidents

1994 bombings

On March 19 to July 3, 1994, bombs killed 27 people and injured 91 others. Three Armenians were later arrested, charged and imprisoned in connection with the incident.

1995 fire

On October 28, 1995, a fire broke out between the Ulduz and Nariman Narimanov stations, killing 289 people and injuring 265 others. The fire was deemed to have been caused by electrical malfunction but the possibility of sabotage was not excluded. The fire remains the world's deadliest subway disaster.