Bedford Cauldwell Walk depot


Bedford Cauldwell Walk depot, is an electric multiple unit maintenance depot located on the Midland Main Line in the Cauldwell district of Bedford.
A four road maintenance depot opened in 2004 to service trains, and was extended to a fifth road in 2009.
The depot is set to lose its maintenance facilities in 2017 for conversion to 12 car sidings for Class 700 rolling stock.

Location

Bedford Caudwell depot is located in the Cauldwell area of Bedford, east of the Midland Main Line at Cauldwell walk, and south of Bedford railway station and the River Great Ouse. A rail connection with the MML is made south of the depot.
The facility's shed code is BF.

History

The site has been historically undeveloped for housing or industrial buildings; from the during the second half of the 19th century a tramway running from the London to Bedford line accessed the site; the site remained occupied by rail sidings throughout the 20th century.
In the early 2000s the construction of phase 2 of the Channel Tunnel Rail Link required a 25-week closure of the railway line between King's Cross and Kentish Town; this blockade would prevent easy access of trains of the London-Bedford line to their traditional servicing facilities at Selhurst depot in south London. As a result, Railtrack calculated it would be cost effective to construct a depot at Bedford to service the trains, and for future use, including as a depot for the Thameslink Programme expansion. The sidings at Bedford station were to be retained for storing trains.
Fitzpatrick contractors Ltd. was given a £11 million contract to build a four road train shed for the Class 319 EMUs, which in addition to the construction of the main train service and maintenance building included stabling for 22 four car trains, a train wash, and controlled emission toilet servicing. The main building was. The depot opened 3 November 2004. The initial allocation was 43 Class 319s.
In 2006 First Capital Connect commenced operating the Thameslink franchise and the depot's maintenance allocation was increased to include all of FCC's 76 four car Class 319s.
In 2009 the depot's allocation increased to 82 Class 319s. As part of the Thameslink Programme another 4 class 319 trains were added, and the depot was extended to five roads for the addition of a further 23 four car Class 377 EMU trains to the depot's responsibilities. VolkerFitzpatrick was awarded the main contract for the £2.2 million extension. The depot extension was opened in January 2009.
The delivery of the class 377 trains was delayed by a year, and the initial Class 377/5 was returned to the manufacturer due to the number of faults found, resulting in a further delay to introduction of the fleet.
When East Midlands Railway started its electric services between London and Corby, the depot will also maintain s.