Berlin S-Bahn
The Berlin S-Bahn is a rapid transit railway system in and around Berlin, the capital city of Germany. It has been in operation under this name since December 1930, having been previously called the special tariff area Berliner Stadt-, Ring- und Vorortbahnen. It complements the Berlin U-Bahn and is the link to many outer-Berlin areas, such as Berlin Schönefeld Airport.
In its first decades of operation, the trains were steam-drawn; even after the electrification of large parts of the network, a number of lines remained under steam. Today, the term S-Bahn is used in Berlin only for those lines and trains with third-rail electrical power transmission and the special Berlin S-Bahn loading gauge. The third unique technical feature of the Berlin S-Bahn, the, is being phased out and replaced by a communications-based train control system specific to the Berlin S-Bahn.
In other parts of Germany and other German-speaking countries, other trains are designated S-Bahn without those Berlin specific features. The Hamburg S-Bahn is the only other system using third-rail electrification.
Today, the Berlin S-Bahn is no longer defined as this special tariff area of the national railway company, but is instead just one specific means of transportation, defined by its special technical characteristics, in an area-wide tariff administered by a public transport authority. The Berlin S-Bahn is now an integral part of the Verkehrsverbund Berlin-Brandenburg, the regional tariff zone for all kinds of public transit in and around Berlin and the federal state of Brandenburg.
Introduction
The brand name "S-Bahn" chosen in 1930 mirrored U-Bahn, which had become the official brand name for the Berlin city-owned rapid transit lines begun under the name of Berliner Hoch- und Untergrundbahnen, where the word of mouth had abbreviated "Untergrundbahn" to "U-Bahn", in parallel to "U-Boot" formed from "Unterseeboot".Services on the Berlin S-Bahn have been provided by the Prussian or German national railway company of the respective time, which means the Deutsche Reichsbahn-Gesellschaft after the First World War, the Deutsche Reichsbahn of the GDR until 1993 and Deutsche Bahn after its incorporation in 1994.
The Berlin S-Bahn consists today of 15 lines serving 166 stations, and runs over a total route length of. The S-Bahn carried 478.1 million passengers in 2018. It is integrated with the mostly underground U-Bahn to form the backbone of Berlin's rapid transport system. Unlike the U-Bahn, the S-Bahn crosses Berlin city limits into the surrounding state of Brandenburg, e.g. to Potsdam.
Although the S- and U-Bahn are part of a unified fare system, they have different operators. The S-Bahn is operated by S-Bahn Berlin GmbH, a subsidiary of Deutsche Bahn, whereas the U-Bahn is run by Berliner Verkehrsbetriebe, the main public transit company for the city of Berlin.
Operation
Network
The S-Bahn routes all feed into one of three core lines: a central, elevated east-west line, a central, mostly underground north-south line, and a circular line. Outside the Ringbahn, suburban routes radiate in all directions.Lines S1, S2, S25, and S26 are north-south lines that use the North-South tunnel as their midsection. They were equally distributed into Oranienburg, Bernau, and Hennigsdorf in the north, and Teltow Stadt, Lichtenrade, and Wannsee.
Lines S3, S5, S7, S9, and S75 are east-west lines using the Stadtbahn cross-city railway. The western termini are located at Potsdam and Spandau, although the S5 only runs as far as Westkreuz and the S75 to Ostkreuz. The eastern termini are Erkner, Strausberg Nord, Ahrensfelde, and Wartenberg. The S9 uses a connector curve at Ostkreuz to change from Stadtbahn to the South-eastern leg of the Ringbahn. Another curve, the Nordkurve to the North-eastern Ringbahn, was originally served by the S86 line, but it was demolished in preparation of the rebuilding of Ostkreuz station and was not rebuilt afterwards. Both connector curves were heavily used in the time of the Berlin Wall, as trains coming from the North-Eastern routes couldn't use the West Berlin North-South route and the Southern leg of the pre- and post-Wall Ringbahn was in West Berlin.
Lines S41 and S42 continuously circle around the Ringbahn, the former clockwise, the latter anti-clockwise. Lines S45, S46, and S47 link destinations in the southeast with the southern section of the Ringbahn via the tangential link from the Görlitzer Bahn to the Ring via Köllnische Heide.
Lines S8 and S85 are north-south lines using the eastern section of the Ringbahn between Bornholmer Straße and Treptower Park via Ostkreuz, using the Görlitzer Bahn in the South.
Routes
Generally speaking, the first digit of a route number denotes the main route or a group of routes. Thus, S25 is a branch of S2, while S41, S42, S45, S46, and S47 are all Ringbahn routes that share some of the same route. So S41, S42, S45, S46, and S47 are together S4. However, the S4 does not exist as an independent entity.Since 9 January 1984, all the West Berlin S-Bahn routes are labelled with an "S" followed by a number. This system had been in use with other West German S-Bahn systems for years. On 2 June 1991 this was extended to the East Berlin lines as well. Internally, the Berlin S-Bahn uses Zuggruppen which normally run every twenty minutes. Some lines, e.g. the S85, are made up of only one Zuggruppe, while others, like S5, are actually multiple Zuggruppen combined. Some Zuggruppen do not run the entire line and terminate at intermediate stops. Zuggruppen are called by a "Funkname", which is derived from the German spelling alphabet. Some Funknamen are not used in regular service, such as Heinrich, Baikal, Jaguar, Gustav, or Saale.
Line | Zuggruppe | Terminus | Route | Terminus | Routing |
P Paula PI Panther PII Pastor | Oranienburg | Oranienburg – Lehnitz – Borgsdorf – Birkenwerder – Hohen Neuendorf – Frohnau – Hermsdorf – Waidmannslust – Wittenau – Wilhelmsruh – Schönholz – Wollankstraße – Bornholmer Straße – Gesundbrunnen – Humboldthain – Nordbahnhof – Oranienburger Straße – Friedrichstraße – Brandenburger Tor – Potsdamer Platz – Anhalter Bahnhof – Yorckstraße – Julius-Leber-Brücke – Schöneberg – Friedenau – Feuerbachstraße – Rathaus Steglitz – Botanischer Garten – Lichterfelde West – Sundgauer Straße – Zehlendorf – Mexikoplatz – Schlachtensee – Nikolassee – Wannsee | Wannsee | Prussian Northern Railway, Berlin-Szczecin railway, Nord-Süd-Tunnel, Wannsee Railway | |
W Wulff WI Wespe | Bernau | Bernau – Bernau-Friedenstal – Zepernick – Röntgental – Buch – Karow – Blankenburg – Pankow-Heinersdorf – Pankow – Bornholmer Straße – Gesundbrunnen – Humboldthain – Nordbahnhof – Oranienburger Straße – Friedrichstraße – Brandenburger Tor – Potsdamer Platz – Anhalter Bahnhof – Yorckstraße – Südkreuz – Priesterweg – Attilastraße – Marienfelde – Buckower Chaussee – Schichauweg – Lichtenrade – Mahlow – Blankenfelde | Blankenfelde | Berlin-Szczecin railway, Nord-Süd-Tunnel, Berlin-Dresden railway | |
V Viktor | Hennigsdorf | Hennigsdorf – Heiligensee – Schulzendorf – Tegel – Eichborndamm – Karl-Bonhoeffer-Nervenklinik – Alt-Reinickendorf – Schönholz – Wollankstraße – Bornholmer Straße – Gesundbrunnen – Humboldthain – Nordbahnhof – Oranienburger Straße – Friedrichstraße – Brandenburger Tor – Potsdamer Platz – Anhalter Bahnhof – Yorckstraße – Südkreuz – Priesterweg – Südende – Lankwitz – Lichterfelde Ost – Osdorfer Straße – Lichterfelde Süd – Teltow Stadt | Teltow Stadt | Berlin-Lichterfelde Süd–Teltow Stadt railway, Anhalt Suburban Line, Nord-Süd-Tunnel, Berlin-Szczecin railway, Prussian Northern Railway, Kremmen Railway | |
VI Vampir | Waidmannslust | Waidmannslust – Wittenau – Wilhelmsruh – Schönholz – Wollankstraße – Bornholmer Straße – Gesundbrunnen – Humboldthain – Nordbahnhof – Oranienburger Straße – Friedrichstraße – Brandenburger Tor – Potsdamer Platz – Anhalter Bahnhof – Yorckstraße – Südkreuz – Priesterweg – Südende – Lankwitz – Lichterfelde Ost – Osdorfer Straße – Lichterfelde Süd – Teltow Stadt | Teltow Stadt | Berlin-Lichterfelde Süd–Teltow Stadt railway, Anhalt Suburban Line, Nord-Süd-Tunnel, Berlin-Szczecin railway, Prussian Northern Railway, Kremmen Railway | |
B Berta BI Bussard SI Saale | Spandau | Spandau – Stresow – Pichelsberg – Olympiastadion – Heerstraße – Messe Süd – Westkreuz – Charlottenburg – Savignyplatz – Zoologischer Garten – Tiergarten – Bellevue – Hauptbahnhof – Friedrichstraße – Hackescher Markt – Alexanderplatz – Jannowitzbrücke – Ostbahnhof – Warschauer Straße – Ostkreuz – Rummelsburg – Betriebsbahnhof Rummelsburg – Karlshorst – Wuhlheide – Köpenick – Hirschgarten – Friedrichshagen – Rahnsdorf – Wilhelmshagen – Erkner | Erkner | Berlin–Wrocław railway, Berlin Stadtbahn | |
A Anton AI Adler | Südkreuz | Berlin Ringbahn | Südkreuz | Berlin Ringbahn | |
R Richard RI Reiher | Südkreuz | Berlin Ringbahn | Südkreuz | Berlin Ringbahn | |
U Ulrich | Südkreuz | – Innsbrucker Platz Südkreuz – Tempelhof – Hermannstraße – Neukölln – Köllnische Heide – Baumschulenweg – Schöneweide – Betriebsbahnhof Schöneweide – Adlershof – Altglienicke – Grünbergallee – Berlin-Schönefeld Flughafen | ✈ Berlin-Schönefeld | Grünauer Kreuz–Berlin Brandenburg Airport railway, Berlin-Görlitz railway, Baumschulenweg–Neukölln link line, Berliner Ringbahn | |
D Dora | Westend | Westend – Messe Nord/ICC – Westkreuz – Halensee – Hohenzollerndamm – Heidelberger Platz – Bundesplatz – Innsbrucker Platz – Schöneberg – Südkreuz – Tempelhof – Hermannstraße – Neukölln – Köllnische Heide – Baumschulenweg – Schöneweide – Betriebsbahnhof Schöneweide – Adlershof – Grünau – Eichwalde – Zeuthen – Wildau – Königs Wusterhausen | Königs Wusterhausen | Berlin-Görlitz railway, Baumschulenweg–Neukölln link line, Berliner Ringbahn | |
K Konrad | Hermannstraße | Hermannstraße – Neukölln – Köllnische Heide – Baumschulenweg – Schöneweide – Oberspree – Spindlersfeld | Spindlersfeld | Schöneweide–Spindlersfeld branch line, Berlin-Görlitz railway, Baumschulenweg–Neukölln link line, Berliner Ringbahn | |
E Emil EI Elster EII Eiche EIII Erna | Westkreuz | Westkreuz – Charlottenburg – Savignyplatz – Zoologischer Garten – Tiergarten – Bellevue – Hauptbahnhof – Friedrichstraße – Hackescher Markt – Alexanderplatz – Jannowitzbrücke – Ostbahnhof – Warschauer Straße – Ostkreuz – Nöldnerplatz – Lichtenberg – Friedrichsfelde Ost – Biesdorf – Wuhletal – Kaulsdorf – Mahlsdorf – Birkenstein – Hoppegarten – Neuenhagen – Fredersdorf – Petershagen Nord – Strausberg – Hegermühle – Strausberg Stadt – Strausberg Nord | Strausberg Nord | Strausberg–Strausberg Nord railway, Prussian Eastern Railway, Berlin Stadtbahn, Spandau Suburban Line | |
O Otto OI Olaf | Potsdam Hauptbahnhof | Potsdam Hauptbahnhof – Babelsberg – Griebnitzsee - Wannsee – Nikolassee – Grunewald – Westkreuz – Charlottenburg – Savignyplatz – Zoologischer Garten – Tiergarten – Bellevue – Hauptbahnhof – Friedrichstraße – Hackescher Markt – Alexanderplatz – Jannowitzbrücke – Ostbahnhof – Warschauer Straße – Ostkreuz – Nöldnerplatz – Lichtenberg – Friedrichsfelde Ost – Springpfuhl – Poelchaustraße – Marzahn – Raoul-Wallenberg-Straße – Mehrower Allee – Ahrensfelde | Ahrensfelde | Wriezen Railway, Berlin Outer Ring, Prussian Eastern Railway, Berlin Stadtbahn, Berlin-Blankenheim railway, Berlin-Magdeburg railway | |
T Theodor TI Tapir | Warschauer Straße | Warschauer Straße – Ostkreuz – Nöldnerplatz – Lichtenberg – Friedrichsfelde Ost – Springpfuhl – Gehrenseestraße – Hohenschönhausen – Wartenberg | Wartenberg | Berlin Outer Ring, Prussian Eastern Railway | |
N Nordpol | Grünau | Birkenwerder – Hohen Neuendorf – Bergfelde – Schönfließ – Mühlenbeck-Mönchmühle – Blankenburg – Pankow-Heinersdorf – Pankow – Bornholmer Straße – Schönhauser Allee – Prenzlauer Allee – Greifswalder Straße – Landsberger Allee – Storkower Straße – Frankfurter Allee – Ostkreuz – Treptower Park – Plänterwald – Baumschulenweg – Schöneweide – Betriebsbahnhof Schöneweide – Adlershof – Grünau | Zeuthen | Berlin-Görlitz railway, Berliner Ringbahn, Berlin-Szczecin railway, Berlin Outer Ring, Prussian Northern Railway | |
NI Neiße | Schöneweide | Berlin-Pankow – Bornholmer Straße – Schönhauser Allee – Prenzlauer Allee – Greifswalder Straße – Landsberger Allee – Storkower Straße – Frankfurter Allee – Ostkreuz – Treptower Park – Plänterwald – Baumschulenweg – Schöneweide | Grünau | Berlin-Görlitz railway, Berliner Ringbahn, Prussian Northern Railway | |
C Cäsar | Spandau | Spandau – Stresow – Pichelsberg – Olympiastadion – Heerstraße – Messe Süd – Westkreuz – Charlottenburg – Savignyplatz – Zoologischer Garten – Tiergarten – Bellevue – Hauptbahnhof – Friedrichstraße – Hackescher Markt – Alexanderplatz – Jannowitzbrücke – Ostbahnhof – Warschauer Straße – Ostkreuz – Treptower Park – Plänterwald – Baumschulenweg – Schöneweide – Betriebsbahnhof Schöneweide – Adlershof – Altglienicke – Grünbergallee - Schönefeld Flughafen | ✈ Berlin-Schönefeld | Berlin Stadtbahn, Berliner Ringbahn, Berlin-Görlitz railway, Grünauer Kreuz–Berlin Brandenburg Airport railway |
Stations in brackets are serviced at certain times only. only runs Monday through Friday.
Also, not every train reaches the nominal terminus of a line. For example, every other train on runs only to Frohnau, five stops before Oranienburg, and the last stop on towards Erkner which is reached by every train is Friedrichshagen. Similarly, some northbound trains terminate at Gesundbrunnen, and most trains run only to Strausberg or even Mahlsdorf, rendering Strausberg Nord the least served stop on the whole network.
Route Changes in 2009
On 31 August 2009 a few semi-permanent changes to the line routes were applied. Because of renovations to Ostkreuz station, including dismantling the tracks connecting the Stadtbahn and the Ringbahn -- could not turn west at this station any more. The line thus followed the Ringbahn and then branches northwards past Schönhauser Allee, like and, and terminated at Pankow.
- To compensate for the diminished throughput on the Stadtbahn, the was extended westwards to Spandau.
Route Changes in 2012
- was shortened to operate only between Ostkreuz and Erkner.
- was extended to Spandau.
- operated every 10 minutes between Westkreuz and Wartenberg.
Route Changes in 2017
- was introduced, operating from Waidmannslust to Teltow Stadt, to replace lost S85 service on 10 December 2017.
- was extended from Ostkreuz back to Westkreuz on 21 August 2017, and was further extended to Spandau on 10 December 2017, replacing the S5.
- was shortened from Spandau to Westkreuz on 10 December 2017.
- was shortened from Westkreuz back to Ostbahnhof on 5 October 2017, and was further truncated to Ostkreuz on 10 December 2017.
- was diverted from Waidmannslust to Pankow, replacing the S9 on 10 December 2017.
- was diverted from Pankow to Spandau on 10 December 2017 replacing the previous S5 service.
Service hours
History
From the beginnings till the end of World War II
With individual sections dating from the 1870s, the S-Bahn was formed in time as the network of suburban commuter railways running into Berlin, then interconnected by the circular railway connecting the various terminal railway stations, and in 1882 enhanced by the east-west cross-city line. The forming of a distinct identity for this network began with the establishment of a special tariff for the area which was then called the "Berliner Stadt-, Ring- und Vorortbahnen", and which differed from the normal railway tariff. While the regular railway tariff was based on multiplying the distance covered with a fixed price per kilometer, the special tariff for this Berlin tariff zone was based on a graduated tariff based on the number of stations touched during the travel.The core of this network, that is the cross-city East-West line and the circular Ringbahn, and several suburban branches were converted from steam operation to a third-rail electric railway in the latter half of the 1920s. The Wannsee railway, the suburban line with the highest number of passengers, was electrified in 1932/33. A number of suburban trains remained steam-hauled, even after the Second World War.
After building the East-West cross-city line connecting western suburban lines, which until then terminated at Charlottenburg station with eastern suburban lines which had terminated at Frankfurter Bahnhof, the logical next step was a North-South cross-city line connecting the northern suburban lines terminating at Stettiner Bahnhof with the southern suburban lines terminating at the subsidiary stations of the Berlin Potsdamer Bahnhof. The first ideas for this project emerged only 10 years after the completion of the East-West cross-city line, with several concrete proposals resulting from a 1909 competition held by the Berlin city administration. Another concrete proposal, already very close to the final realisation, was put forward in 1926 by Professor Jenicke of Breslau university.
Many sections of the S-Bahn were closed during the war, both through enemy action and flooding of the Nord-Süd-Bahn tunnel on 2 May 1945 during the final Battle of Berlin. The exact number of casualties is not known, but up to 200 people are presumed to have perished, since the tunnel was used as a public shelter and also served to house military wounded in trains on underground sidings. Service through the tunnel commenced again in 1947.
The time of expansion
Before the construction of Berlin Wall
After hostilities ceased in 1945, Berlin was given special status as a "Four-Sector City," surrounded by the Soviet Occupation Zone, which later became the German Democratic Republic. The Allies had decided that S-Bahn service in the western sectors of Berlin should continue to be provided by the Reichsbahn, which was by now the provider of railway services in East Germany.Before the construction of the Berlin Wall in 1961, the Berlin S-Bahn had grown to about 335 kilometres. On the 13 August 1961, it was the biggest turning point in the operation and network for the S-Bahn.
As relations between East and West began to sour with the coming of the Cold War, it had become the victim of the hostilities. Although services continued operating through all occupation sectors, checkpoints were constructed on the borders with East Berlin and on-board "customs checks" were carried out on trains. From 1958 onward, some S-Bahn trains ran non-stop through the western sectors from stations in East Berlin to stations on outlying sections in East Germany so as to avoid the need for such controls. East German government employees were then forbidden to use the S-Bahn since it travelled through West Berlin.
After the construction of Berlin Wall
The S-Bahn has also been operated in two separate subnets of the Deutsche Reichsbahn. In East Berlin, the S-Bahn retained a transport share of approximately 35 percent, the mode of transport with the highest passenger share. In the 1970s and 1980s the route network continued to grow. In particular, the new housing estates were connected to the grid in the northeast of the city.The construction of the Berlin Wall led to West Berlin calling for the unions and politicians to boycott the S-Bahn. Subsequently, passenger numbers fell.
However, the Berlin S-Bahn strike brought the S-Bahn to the attention of the public, and aroused the desire for West Berlin to manage its section of the S-Bahn itself. In 1983 negotiations of representatives of the Senate, the SNB and the Deutsche Reichsbahn took place. In December 1983, these were concluded with Allied consent to the agreement between the Deutsche Reichsbahn and the Berlin Senate for the transfer of operating rights of the S-Bahn in the area of West Berlin. The BVG received the oldest carriages from the DR; but the BVG was eager to quickly get to modern standards for a subway. Therefore, soon new S-Bahn trains were purchased on their behalf, which are still in use on the Berlin S-Bahn network as the 480 series.
Even before the Wall fell, there were efforts to substantial re-commissioning of the S-Bahn network in West Berlin.
Reunification
After the Berlin Wall came down in November 1989, the first broken links were re-established, with Friedrichstraße on 1 July 1990, as the first. The BVG and DR jointly marketed the services soon after the reunification. Administratively, the divided S-Bahn networks remained separate in this time of momentous changes, encompassing German reunification and reunification of Berlin into a single city, although the dividing line was no longer the former Berlin Wall. DR and BVG operated individual lines end to end, both into the other party's territories. For example, S2 was all BVG even after it was extended northward and southward into Brandenburg/former East German territory. The main east-west route was a joint operation. Individual trains were operated by either BVG or DR end-to-end on the same tracks. This arrangement ended on 1 January 1994, with the creation of Deutsche Bahn due to the merger between DR and the former West Germany's Deutsche Bundesbahn. All S-Bahn operations in Berlin were transferred to the newly formed S-Bahn Berlin GmbH as a subsidiary of Deutsche Bahn, and the BVG withdrew from running S-Bahn services.Technically, a number of projects followed in the steps of re-establishing broken links in order to restore the former S-Bahn network to its 1961 status after 1990, especially the Ringbahn. In December 1997 the connection between Neukölln and Treptower Park via Sonnenallee was reopened, enabling S4 trains to run 75% of the whole ring between Schönhauser Allee and Jungfernheide. On 16 June 2002, the section Gesundbrunnen – Westhafen also reopened, re-establishing the Ringbahn operations.
Tendering programme for the Berlin S-Bahn
MTR Corporation, National Express Group, Berlin S-Bahn GmbH and RATP Development had tendered for their procurement process, and were soon followed by train manufacturer Stadler Rail for their operations from 2018 to 2033. The specific contracts are:Ringbahn -
- S41 Südkreuz - Südkreuz
- S42 Südkreuz - Südkreuz
- S46 Westend - Königs Wusterhausen
- S47 Spindlersfeld – Hermannstraße -
- S8 Birkenwerder - - Zeuthen
- S3 Erkner - Spandau
- S5 Westkreuz - Strausberg-Nord
- S7 Ahrensfelde - - Potsdam HBF
- S75 Wartenberg - Ostkreuz
- S9 Berlin-Schönefeld - Spandau
- S1 Wannsee - Oranienburg
- S2 Blankenfelde - Bernau
- S25 Teltow Stadt - Hennigsdorf
- S26 Teltow Stadt - Waidmannslust
- S45 Berlin-Schönefeld - Südkreuz
- S85 Grünau - Pankow
Depots
At Grünau, construction began in 1916 and was completed in 1928. They serviced the following routes:
- Grünau – Südring – Stadtbahn – Lichtenberg
- Grünau – Stadtbahn – Spandau West
- Grünau – Nordring – Gartenfeld
- Zeuthen – Ostring – Bernau
- Königs Wusterhausen – Stadtbahn – Friedrichstraße – Stadtbahn – Erkner – Stadtbahn – Friedrichstraße
- Flughafen Berlin-Schönefeld – Stadtbahn – Friedrichstraße
- Spindlersfeld – Ostring – Blankenburg
- Stettiner Bahnhof
- Papestraße
- Westend
- Bernau
- Hundekehle
- Velten
- Yorckstraße
Rolling stock
Current
In December 2015, S-Bahn Berlin signed a framework contract with the Stadler/Siemens consortium for the supply of up to 1380 electric multiple unit cars. The initial base order, to be completed by 2023, consists of 85 four-car and 21 two-car sets, which will be used on the Ring and the southeastern branches, under Class 483 and 484.Former
- DRG Class ET 125
- DRG Class ET 165
- DRG Class ET 166
- DRG Class ET 167
- DRG Class ET 168
- DRG Class ET 169
- DR Class ET 170
Special Trains
Otherwise museum and tradition trains were primarily used - Class 165. The Viertel train Class ET/EB 167s were being built in 1938 and was converted in 1991.
Expansion
Redevelopment projects
Ostkreuz
In 1988, Deutsche Reichsbahn presented plans for the transformation of Ostkreuz station. The long postponed renovation of the station began in 2007.With nine lines, Ostkreuz is one of the busiest stations on the network. Since the reconstruction is taking place during full operations. Work under the current plans was original projected to be completed by 2016, but it has been delayed and it is now expected to be completed in 2018.
With the progress of construction work on 31 August 2009, the southern connection and platform A were decommissioned. This route had to be realigned as a result. The construction plans envisaged that the connection would be restored by 2014. After its completion, traffic will again be able to be run from the southern Ringbahn onto the Stadtbahn.
In October 2009, the new Regionalbahn station on the Ringbahn was sufficiently complete for S-Bahn trains on the Ringbahn to use it temporarily. Demolition of the Ringbahn platform could then start and the new platform, including a concourse, could be built. This was put into operation on 16 April 2012, after a 16-day possession.
Berlin–Görlitz railway (Baumschulenweg–Grünauer Kreuz)
Rehabilitation work at Grünauer Kreuz on the Berlin–Görlitz railway began on 12 July 2006. In 2010 and 2011, rebuilt stations were put into operation in several stages at Baumschulenweg and Adlershof and the bridges over the Britz Canal and the Teltow Canal were replaced. During the reconstruction, the platform at Adlershof was relocated directly above Rudower Chaussee.Other major construction projects are planned along the route:
- Rebuilding of Schöneweide station, including the construction of a new road underpass
- Replacement of bridges over Sterndamm
- Construction of additional electronic interlocking equipment along the route
- Conversion of Wildau station
- Renewal of the mainline tracks and the re-establishment of the overhead contact line system
New lines
Berlin-Schönefeld Airport-Berlin Brandenburg Airport extension
In preparation for the opening of Berlin-Brandenburg Airport in Schönefeld in the south of Berlin, the S-Bahn line will be extended from the current terminus at Berlin-Schoenefeld Airport in a long curve to the new terminal. Directly below the not yet opened terminal, Berlin Brandenburg, a station has been built with six platform tracks. Four through platform tracks are provided for long-distance services. Two tracks are being built for the S-Bahn on the approach from the west. In early July 2008, the first 185-metre-long section of the station was completed so that the terminal could be built. On 24 July 2009, the airport company transferred the completed shell of the airport railway station and the first part of the tunnel to DB. The new line includes the stations of Waßmannsdorf and Berlin Brandenburg Airport and has a length of approximately 7.8 kilometres. The construction cost was specified as €636 million. This amount also included the cost of construction of long-distance tracks.Planning of line S21 (Second Nord-Süd Bahn: first stage)
The second Nord-Süd Bahn will link the northern ring to the Hauptbahnhof, Potsdamer Platz station and the Wannsee Railway to the southern ring. Today's plans are almost identical to plans submitted to the 1907-1910 Greater Berlin competition by Albert Sprickerhof. Since then, there have been a number of alternatives proposals for such a route. A similar line was included in the plans for Welthauptstadt Germania in the 1930s.The line will be built in sections. In 2005, the zoning approval for the northern part of the route from the Ringbahn to Hauptbahnhof was adopted. In October 2009 a loan agreement was entered into between the Senate and Deutsche Bahn for the first section. This provided for total costs of €226.5 million. On 27 November 2009, the preparatory work for this phase of construction started at the Hauptbahnhof. For the underground excavation in Invalidenstrasse, diaphragm walls were built into the ground and the trench in between was covered with a reinforced concrete lid.
This stage involves the construction of a curve to the Westhafen and an eastern connection to Wedding inside the northern Ringbahn. Structural preparation for these junctions to these lines had already been made during the construction of the North–South mainline in 2006. From there, the existing line will run in a southerly direction to the Berlin Hauptbahnhof east of the North–South mainline. The realization of an intermediate station under the working name of Perleberger Brücke is provided as an option. It is proposed to build this 1,600-meter-long section by 2016.
Planning of line S21 (Second Nord-Süd Bahn: second stage)
The construction of the second section of the S21 is to begin no earlier than 2018 and is expected to be completed in 2023. The new S-Bahn line will run in a tunnel from near the Hauptbahnhof past the Reichstag to Potsdamer Platz. It will run next to the existing Nord-Süd Tunnel to Brandenburg Gate and separate from it to run to Potsdamer Platz. The first north-south S-Bahn tunnel was designed in 1939 with room for an additional two tracks at Potsdamer Platz and to its south for the new line. The cost of the S-Bahn line has been estimated at €317 million. The benefits of additional expenditure to the east of the Reichstag are still under investigation. This would increase the cost to about €330 million.There are currently no dates set for the other phases of construction to the southern Ringbahn. It has so far only been defined in the Berlin land use plan.
Proposals for further extensions
Since reunification, there have been suggestions that lines that have not been used since 1961 or 1980 should be rebuilt and connected to the network by some new lines. Many of these plans have changed several times since then or have been abandoned.Following a decision of the Berlin House of Representatives, the goal is essentially to restore the S-Bahn network to its extent in 1961. This was stated in an agreement between Deutsche Bahn, the Federal Ministry of Transport and the Senate on 4 November 1993. The network was to be restored by 2002. On this basis, the plans were included in the land use plan of 1995. In a study of the transport development by the then Department for Transport and Commerce in 1995, a plan was published for a network. Only the Jungfernheide–Stresow, Spandau–Staaken and Zehlendorf–Düppel sections, which had existed until 1980, were not incorporated in these plans. This political commitment is now only symbolic as some projects are now aimed at points beyond the original destinations or to miss them entirely. Budgetary difficulties, changing traffic flows and alternative development projects using Regionalbahn trains have led to the cancellation or postponement of projects that had already been developed.
New stations
Accidents
Since the foundation of the Berlin S-Bahn, a number of accidents have occurred.- On 15 December 1945, there was a head-on collision between a S-Bahn and a Nahgüterzug on the single-track Schöneweide–Spindlersfeld branch line. There were four dead and one seriously injured. The accident was caused by human error on the part of the dispatcher, who forgot the local freight train coming from Spindlersfeld and due to missing automatic block signaling and allowed a S-Bahn journey to Spindlersfeld.
- On August 15, 1948, a train arriving from Oranienburger Straße in the north-south S-Bahn tunnel collided with a stopped train in the curve of the Spree underpass. 63 people were injured. The reason given was that the railcar personnel did not exercise the required care for "line of sight" operation, by driving at about in a blind curve. Both were initially dismissed without notice, but were acquitted by a court and remained on duty.
- In the late afternoon of 18 December 1979, an S-Bahn train operating on the northern Berlin outer ring between Mühlenbeck and the Karow Cross collided with a just approaching freight train. The driver was killed in the accident, 20 passengers were injured, five of them seriously.
- In 1987, there were several derailments of BVG S-Bahn trains in the Berlin Nord-Süd Tunnel. After a train had been derailed before and behind the platform Friedrichstraße with the first bogie, there was a major incident in March 1987, when a northbound train derailed in the narrow left turn of the Spree underpass. The BVG railcar 275 227 slid along the tunnel wall for about 50 meters, severely damaging the cable and the car itself. There was no personal injury.
- On October 20, 1987 another train derailed with the penultimate bogie of the train in the tight right turn in front of the Berlin Brandenburger Tor station. The last derailed car fell out of profile and crashed into the platform, breaking a three-meter-long piece out of the edge and tearing a signal off the wall. On 2 November 1987, exactly at the same place, there was again a derailment of the last car. This also got out of profile and rammed again the platform edge. Both accidents caused considerable damage, but no personal injury. As a cause for the total of six derailments was found:
- *While the BVG began to profile its wheel profiles according to the current UIC standard, the track layouts of the Deutsche Reichsbahn in the north-south S-Bahn tunnel did not meet the current requirements, which apparently led to compatibility problems.
- *After the transfer of the West Berlin S-Bahn to the BVG, the DR had completely removed the previously existing guard rails from the tight curves.
- *The Deutsche Reichsbahn had dismantled all curve lubrication devices on the track arches, which had greatly increased the tendency to climb the wheel arches. In connection with the other two points it had to come to the derailments. As a consequence, the DR rebuilt the lubricators and imposed a speed reduction from. The BVG marked all the quarter-trains that already carried the new UIC profile with a yellow line under the company number. These cars were excluded from driving through the tunnel.
- On October 21, 2001 at Ostkreuz and on May 13, 2002 at Hackescher Markt, rear-end collisions occurred which gave rise to the introduction of speed monitoring. At Ostkreuz, two trains of the class 485 collided late on Sunday evening, when the approaching train could not be stopped in time for emergency braking. The driver claimed to have initiated the required speed reduction before the stop signal, however, no evidence could be found to confirm this claim. Instead, the court presumed the driver was inattentive shortly before the end of the shift, and ignored the previous signal. Twelve people were injured and there were 190,000 euros in property damage. Also at Hackescher Markt station, experts were unable to identify any problems with the brake system of the 481 model series involved, which could explain the excessive speed at the entrance to the occupied track of the platform. Here 13 people were injured, again mainly by broken discs. In both cases, a fine was imposed on train drivers who both no longer drive trains.
- On August 10, 2004, a class 480 suburban railway car caught fire in the underground Anhalter station. The cause was a cabling fault in the brake resistor fan. The station suffered severe damage, had to be closed and rehabilitated for several months, but there were no casualties. The costs for the renovation were given as a total of 5.5 million euros. As a result of this accident, it was decided to outfit all underground stations with at least two exits, analogous to the Berlin subway. In practice, this concerns only the stations Oranienburger Straße and Anhalter Bahnhof, the latter received another southern exit in the direction of Tempodrom.
- On November 20, 2006, at 10:25 am, a S-Bahn train on the S25 line in the direction of Hennigsdorf in Südkreuz station hit an occupied track and collided with a work train. The impact threw passengers through the car, injuring 33 of the approximately 100 passengers, two of them seriously injured. The work train, a track gauge, had traveled the track before and covered the rails with a film of water. As a result of this film, the following class 481 S-Bahn train slid out of the area during braking in the station area and landed on the work train. As a consequence of this accident was ordered that the vehicles of the Berlin S-Bahn enter stations more slowly. As a result of the accident, the maximum speed allowed on all 481 Series trains in February 2008 was reduced to. Only after the modification of the anti-slip system are higher speeds to be driven again.
- On May 1, 2009 an S-Bahn train of the class 481 in Kaulsdorf derailed due to a broken wheel. According to S-Bahners, the scheduled main investigation of the derailed train had been postponed for two years. As a consequence, this accident led to the subsequent chaos in 2009, since the test intervals were shortened and therefore at times only 165 out of 552 required quarter trains were available. Eventually, all axes had to be replaced because they were generally considered to be inadequate.
- On August 21, 2012 derailed when crossing a turnout in the northern exit of the station Tegel a moving towards Hennigsdorf S-Bahn line S25. In the accident five passengers were injured, the driver suffered a shock and also had to be cared for medically.
Network map