Genesis Solar Energy Project


The Genesis Solar Energy Project is a concentrated solar power station located in the Mojave Desert on of Bureau of Land Management land, in eastern Riverside County, California. The plant is owned/managed by Genesis Solar, LLC, a subsidiary of . The Genesis Solar Energy Project is located about west of Blythe, in the Lower Colorado River Valley. The plant was built in the Colorado Desert along an ancient trade route that native people had traveled for thousands of years. The route traversed the Sonoran Desert and enabled trade between the Colorado River and the coast.
The solar power plant consists of two independent 125 MW net sections, using solar trough technology. This was one of three of the world's largest solar plants, that began supplying power in 2013 and 2014, located in the deserts of Riverside and San Bernardino counties. The Project power block and solar arrays occupy about of the site. The rest are the evaporation ponds, access road, administration buildings and some fenced open area. The 1840 Solar Collector Assemblies are each, yielding of total solar aperture.
A June 2014 report details the project's potential impact on bird populations.

Production

Genesis Solar Energy Project's production is as follows.
Maximum production was estimated at 580,000 MW·h per year.