Ghatkopar is a suburb in eastern Mumbai. The area is served by the railway station on the Central Line of the Mumbai Suburban Railway and the metro station on Line 1 of the Mumbai Metro.Mumbai Metro Project
The Versova-Andheri-Ghatkopar Metro corridor of the Mumbai Metro project is an 11.07 km long double line corridor on an elevated viaduct. The route uses Standard Gauge air-conditioned trains with 12 elevated stations. It has a carrying capacity of 60,000 persons per hour and the commuting time on the entire stretch is 21 minutes. The commute time between Versova and Ghatkopar was reduced by 70 minutes by this line. Metro started running successfully from July 2014.