Indian Railway Service of Mechanical Engineers


The Indian Railway Service of Mechanical Engineering is one of the group 'A' central service of the Indian railways. The officers of this service are responsible for managing the Mechanical Engineering Organisation of the Indian Railways.IRSME officers are drawn from the Engineering Service Examination Exam.All appointments to the Group 'A' services are made by the President of India.

Recruitment

The recruitment to the cadre is done through two sources
Conducted for the selection of top ranking officials at the government of India.
Both of these selection exams are conducted by the Union Public Service Commission of India. The UPSC is responsible for recruiting middle and top-level bureaucrats for the Government of India.

Role and Function

The main areas of responsibility
This organisation was central to all rolling stock operations when the only modes of traction were Steam Locomotives and Diesel Electric Locomotives. With the use of electric traction on the trunk routes, the responsibility of traction operations has been shared with the Electrical Department.
All the coaches and wagons are maintained by the Mechanical Department. The air-conditioning part of the coaches on the system was maintained by the Electrical Department. A Railway Board order to bring the entire rolling stock under unified maintenance of the Mechanical Department in 2003 was held in abeyance under pressure from Electrical Department Unions.
This has been adopted in 2016 wherein all locomotives including crew is now under electric department. The entire rolling stock maintenance including MEMU and train lighting of coaches is now under mechanical department.
Accordingly, at Railway Board level post of MEMBER MECHANICAL is redesignated as MEMBER ROLLING STOCK.

Train Operations

The responsibilities and assignments of train operations are loosely referred to as Open Line. A great deal of emphasis is placed on open line experience. Indeed, there are few cases of people who have succeeded in the organisation without a significant tenures on the Open Line.
From a general public's point of view the most exciting tasks are related to accident relief and traffic restoration. IRSME is responsible for designing, acquiring / building and maintenance of the accident relief infrastructure and organisation. In times of emergency, the appropriate officer is responsible for mobilising the Accident Relief Medical Equipment and Accident Relief Trains. Accidents are times of great stress and anxiety. Inquiries and investigation into the cause can carry on for months after a :Category:Railway accidents in India|major accident.

Production Units

The Indian Railways does a great deal of manufacturing and would rival any other engineering house in India. The overall manufacturing is split between the Production Units and the zonal workshops

Repair and Manufacturing

The zonal railways have workshops that manufacture and repair equipment. These workshops can be very large. It is only the organisational structure that prevents them from being called Production Units.

Organisation

The IRSME is headed by a Member in the Railway Board. Member is better known by the acronym MM, now Railway Board has redesignated as MEMBER ROLLING STOCK.
In each of the zones the organisation is headed by a Principal Chief Mechanical Engineer. The PCME reports to the General Manager of the Railway. The office of the Member of the Railway Board guides the PCME on technical matters and policy.
At the divisional level the Sr Divisional Mechanical Engineers head the organisation. The Sr DME reports to the Divisional Railway Manager of the Division. Technical supervision is provided by the zonal Principal Chief Mechanical Engineer.
at entry level ADME commands 500-15000 staff and 100-250 trains;
Workshops are headed by Chief Works Managers. Since workshops are managed by the zonal Railways, the CWMs report to the PCME.
Production Units, the manufacturing plants of the Indian Railways, are managed directly by the ministry. The General Managers of the PUs report to the Railway Board. The Production Units are