Interstate 215 (California)
Interstate 215 is a north–south auxiliary Interstate Highway in the Inland Empire region of the Greater Los Angeles urban area in Southern California. It has portions designated as the Barstow, Escondido, and Armed Forces Freeways. I-215 is a bypass auxiliary route of I-15, running from Murrieta to northern San Bernardino. While I-215 connects the city centers of both Riverside and San Bernardino, its parent I-15 runs to the west through Corona and Ontario.
Part of I-215 was once signed as Interstate 15E, but this was changed in 1974 as almost all of the Interstates around the country with directional suffixes were eventually renumbered or eliminated.
Route description
The southern terminus of I-215 is at the junction of I-15 in the city of Murrieta, in southwestern Riverside County. It then runs north through Menifee and Perris and along March Air Reserve Base before joining State Route 60 near Moreno Valley.I-215 overlaps with SR 60 for about in Riverside and splits from it at SR 91, where it then travels through Colton, Grand Terrace and San Bernardino before rejoining I-15 near the small San Bernardino neighborhood of Devore.
This route is an alternative to I-15 for drivers traveling from Phoenix, Las Vegas, or San Bernardino, to the San Diego metropolitan area. This route offers more of a distance advantage since it is an alternative to I-15's alignment that is about to the west of, and roughly parallel to, I-215. The distance between the two I-15/I-215 junctions is almost shorter using I-215 rather than I-15.
However, the traffic and time "advantage" on I-215 is limited by three factors: the segment between the I-15/I-215 "Devore junction" and San Bernardino only has two lanes in each direction, it is co-signed with SR 60 through Riverside, and that, while there are three lanes in each direction between Murrieta Hot Springs Road and SR 60, each city along this part of the corridor is undergoing rapid population growth, which has contributed to increased traffic congestion during and outside of peak hours.
I-215 is also used by local residents as the major north–south route for the urbanized portions of the San Bernardino–Riverside–Ontario metropolitan area.
I-215 is part of the California Freeway and Expressway System, and is part of the National Highway System, a network of highways that are considered essential to the country's economy, defense, and mobility by the Federal Highway Administration. I-215 is eligible for the State Scenic Highway System, but it is not officially designated as a scenic highway by the California Department of Transportation. On January 24, 1957, the State Highway Commission defined the Escondido Freeway as what is now Routes 15 and 215 from Route 805 to Route 91. This entire segment was previously Route 395 when it was named. From the SR 60/SR 91 interchange in Riverside to I-10 near San Bernardino, the highway is known as the Riverside Freeway. Between Highland Avenue in San Bernardino and its northern terminus, I-215 is named the Barstow Freeway. Unofficially, I-215 is known as the Armed Forces Freeway between SR 60 and I-15, given its proximity to the March Air Reserve Base.
History
The highway that is currently I-215 first opened in 1963 as part of U.S. Route 395. The "mileposts" in Riverside County reflect this since they do not start at zero at the I-15 interchange in Murrieta. Around 1968, U.S. 395 was renumbered as I-15. This segment of US 395 was again renumbered in 1972 as I-15E. Next in 1974, this route was renumbered as State Route 194. In 1982, this route was then renumbered as I-215 north of SR 60, and as State Route 215 south of SR 60. Once SR 215 was upgraded to Interstate Highway standards, it became part of I-215 in 1994. Prior to its upgrade to Interstate standards, there were traffic signals at SR 74, as well as at Alessandro Boulevard ; two railroad crossings had also intersected the I-215 expressway at SR 74 and south of Cactus Avenue at then-March Air Force Base.Due to the fact that the I-215 designation was overlaid upon existing freeways between the southern junction with SR 60 and the city of San Bernardino, the SR 60/SR 91/I-215 interchange in the city of Riverside has been widely known for its confusing nature concerning the numbering of I-215. While SR 60 continues east-and-west through this interchange, and SR 91 continues southwest, the I-215 designation continues away from this interchange on SR 60 east and the former northern portion of SR 91. Travelers following I-215 in either direction need to "change freeways" at this interchange, instead of just following through lanes. The interchange was reconstructed to include some high-speed flyovers, one of which carries I-215 southbound traffic. In addition, when I-215 temporarily co-signs SR 60 in Riverside, the mileposts for I-215 supersede mileposts for SR 60. Motorists traveling east-west on SR 60 must begin counting exits at a new number, in the reverse order, during the I-215 overlap.
San Bernardino widening project
A joint project between Caltrans and SANBAG of San Bernardino County to widen I-215 between Orange Show Road and University Parkway in San Bernardino began in 2007. With its completion, the project added one general use lane and one carpool lane in each direction, bringing the total number of lanes from six to 10 lanes across. The 7.5-mile, $723 million project included the reconstruction of all underpasses and overpasses within the project as well as connector ramps between I-215 and SR 210. This major expansion and revitalization project will help reduce congestion and improve traffic flow on this freeway that serves as a gateway to the Victor Valley, Riverside County, Orange County, Los Angeles County and points beyond. The widening was completed in late 2013, and all construction signage and equipment were completely removed by Spring of 2014.- Phase 1 status: Reconstruction of 5th Street Bridge. Work began in January 2007 and was completed in November 2008, approximately six months ahead of schedule and $2 million under budget. The 5th Street bridge was built in phases with the new bridge being constructed alongside the old structure to allow for continuous use of the east/west corridor during construction.
- Phase 2 status: Freeway widening between Orange Show Road and Rialto Avenue. Construction began on Phase 2 in December 2007 and was completed in July 2010. In addition to the reconstruction of various bridges, the freeway was widened from three to five lanes in each direction through this stretch of road. Aesthetic wallscapes depict the City’s iconic symbols including palm trees, the San Bernardino mountain range, fountains representing the local springs and more.
- Phase 3 status: Freeway widening between Rialto Avenue to Massachusetts Avenue. Construction began in September 2009 and finished in mid-2013. This phase received $128 million in American Recovery and Reinvestment Act of 2009 funds, one of the largest allocations of funding to a construction project in the country. As part of this phase, the freeway was widened from three to five lanes in each direction along with the reconstruction of various bridges and underpasses. Following construction completion, all fast-lane entrances and exits were eliminated with drivers using new 5th Street and Baseline Street on-ramps that connect directly to the newly constructed bridges. This new configuration provides more balanced access to the west and east sides of the city. Also, residents living alongside the northbound side of the freeway have a soundwall to help block out freeway noise.
- Phase 4 status: freeway widening between Massachusetts Avenue and University Parkway. Construction began in January 2010 and was completed in November 2012. A key feature in this phase was the construction of I-215/SR 210 connector ramps. Drivers now have direct access to these freeways in all directions. In addition to a general-purpose and carpool lane added in each direction south of the I-215/SR 210 interchange, a southbound auxiliary lane and a northbound general-purpose lane have been added between University Parkway and the I-215/SR 210 interchange.
Future