Interstate 90 in Ohio


Interstate 90 runs east–west across the northern tier of the U.S. state of Ohio. Much of it is along the Ohio Turnpike, but sections outside the turnpike pass through Cleveland and northeast into Pennsylvania.
The entire free section of I-90 in Ohio is called the "AMVETS Highway". Selected stretches are named for various individuals. In Greater Cleveland, portions of I-90 carry various names, such as the Innerbelt Freeway, the Cleveland Memorial Shoreway, the Lakeland Freeway, and the Euclid Spur.

Route description

In the western half of Ohio, I-90 is jointly signed with the Ohio Turnpike/I-80. The Ohio Turnpike–I-90 connector was built in Lorain County in Amherst Township and Elyria Township in 1975.
From the exit east, I-90/State Route 2 travels east along the south shore of Lake Erie through Cuyahoga County to downtown Cleveland. SR 2 separates from I-90 at Detroit Road in Rocky River. I-90 crosses the Cuyahoga River via the George V. Voinovich Bridges, which replaced the Innerbelt Bridge in 2013 through 2016, into downtown Cleveland and, after passing Dead Man's Curve, follows the East Shoreway northeastward along the lakeshore toward Euclid, again co-signed with SR 2. I-90 separates from SR 2 in Euclid and passes through Lake County and Ashtabula County as it continues to travel northeast towards the Pennsylvania state line in Conneaut.
U.S. Route 20 parallels I-90 throughout Ohio, as it does in all locations from Illinois eastward; US 6 also parallels I-90 to a lesser extent throughout the state. East of I-271, SR 84 and SR 307 also closely parallel I-90. These routes are usually easily accessible from I-90's interchanges.

History

The very first portion of I-90 in Ohio was built in 1935. This portion was a part of the Cleveland Memorial Shoreway, running from East 9th Street to East 55th Street. The year 1938 saw the addition of an eastward expansion to the Illuminating Company plant, which was within close proximity of Gordon Park. The interchange with East 9th Street was completed in 1940. 1941 saw an addition of the freeway, running between the former terminus at Gordon Park, to East 140th Street in Euclid. The westernmost part of I-90 in Ohio was built from 1952 to 1955, with the construction of the Ohio Turnpike. The Innerbelt Freeway was built in 1959, and was the main freeway that ran through Cleveland. I-90 opened between SR 528 in Madison and SR 7 in Conneaut on December 15, 1959, and between SR 44 in Concord Township and SR 528 in Madison on June 30, 1960. A part of I-90 running from East 140th Street to the Lakeland Freeway split was built in 1962, with the construction of the Lakeland Freeway. The part connecting the Lakeland Freeway and I-271 was built in the mid-1960s. From the mid-1960s to 1978, the part of Interstate 90 running from the Ohio Turnpike in Lorain County to Interstate 71 was built. That part of the road was opened on November 4th of that year.

Exit list

Related highways

InterstateCityTypeNotes
Interstate 490ClevelandSpur