Line 4 Sheppard is the newest and shortest subway line of the Toronto subway system, operated by the Toronto Transit Commission. It opened on November 22, 2002, and has five stations along of track, which is built entirely underground in the district of North York along Sheppard Avenue East between Yonge Street and Don Mills Road. All stations are wheelchair accessible and are decorated with unique public art, such as the scenic mural at and the illusionary trompe-l'œil sketches at. The Government of Ontario has announced plans to extend the line east to Sheppard Avenue and McCowan Road in Scarborough.

Name

When the subway opened, it was given the name "Sheppard line" and the official name 4 Sheppard Subway. In October 2013, the TTC announced plans to give the lines official numbers to help riders and visitors navigate the system. The Sheppard line is numbered as Line 4 and new signage reflecting this began being gradually implemented in March 2014. The Toronto Rocket trains also use the numerical system for interchange station announcements, such as announcing "Change for Line 1" when the trains arrive at Sheppard–Yonge station.

History

Origins

The TTC proposed the Sheppard Line as part of the Network 2011 transportation plan, unveiled in 1985, which called for a line from Yonge Street to Victoria Park Avenue. The plan was approved by Metropolitan Toronto, but funding was delayed by the provincial government of David Peterson's Liberal Party.
In 1993, the governing New Democratic Party under Bob Rae proposed provincial funding for four subway/LRT projects for the TTC. Included in these four proposals were plans to build new subway lines along Eglinton and Sheppard Avenues and work was begun on both projects. The NDP was defeated in the 1995 provincial election, and the Progressive Conservatives under Mike Harris were elected. Harris cancelled the Eglinton subway in York but continued work on the Sheppard Line.
Funding for the Sheppard Line was initially rejected by city council. However, after a number of votes on different alterations to the project, the proposal to build the Sheppard Line tunnels only, without tracks, was passed by a narrow margin. After this vote passed city council, a re-vote was taken on the entire Sheppard line project to Don Mills, which then passed by a very narrow margin. James Bow, a Toronto transit reporter, has documented that the political clout of North York Mayor Mel Lastman was crucial to the Sheppard Line proposal being implemented. Councillor Joe Pantalone strongly supported the line, arguing it was a matter of civic equity and that the suburbs deserved good transit, which would – in his opinion – bring development. David L. Gunn, who was general manager of the TTC, opposed the Sheppard line, saying that it "made no sense to build an expensive new subway when the existing system was strapped for cash to make basic repairs" and "if the city wanted to expand transit, it would be better to do it downtown, easing congestion in the busiest parts of the system".

Completion and opening

The Sheppard line was opened on November 22, 2002. It was the city's first new subway line since the opening of the Bloor–Danforth line in 1966. It remained the newest subway infrastructure in Toronto for 15 years until the opening of the Toronto–York Spadina Subway Extension in 2017. It is shorter than had been planned, running from Yonge Street east to Don Mills Road rather than further west to Downsview station and southeast to Scarborough Centre station. Downsview had been built in 1996, ostensibly with the intention of being the western terminus of the Sheppard Line prior to the latter's truncation.
The Sheppard line cost just under C$1billion and took eight years to build. It is the first subway line in Canada that had plain tunnel sections built entirely by tunnel boring machine. The Sheppard line is the only subway line in Toronto that does not have any open sections. All stations on the line are in cut-and-cover sections with the expansion of Sheppard station having required an S-shaped diversion of Yonge Street. Just east of Leslie station, there is an enclosed bridge over the east branch of the Don River.
It is the first line to have accessibility elevators at every station. The automated system to announce each stop was installed in January 2006.
Stations are built to accommodate the TTC's standard subway trains of six cars, but part of each platform has been blocked off since only four-car trains are needed to carry the amount of traffic on the line. The line was designed so that it can be extended at both ends, allowing for the construction of the westward and eastward branches that had been planned. Likewise, the Sheppard line level of Sheppard–Yonge station is constructed as a roughed-in Spanish solution station in anticipation of increased ridership.
Platform screen doors were proposed for the Sheppard line. Installed at the edge of the platforms, platform screen doors would align themselves with the subway-car doors when in station for safety and suicide prevention. The system was dropped because of the financial cost.

Rolling stock

From its opening in November 2002 to May 2016, the line was operated solely with four-car T1 subway trains with two staff members operating the trains – one driver and one guard who operates the doors. On May 30, 2016, new four-car Toronto Rocket subway trains were introduced on this line. They replaced the older T1 subway trains, which were moved to Line 2 Bloor–Danforth. The TRs are based on Bombardier Transportation's Movia-styled train sets and are the first TTC trains which have no separators between the cars. This allows passengers to walk freely from one end to the other, unlike Toronto's previous subway cars. The change to TR trains was necessary because Line 4 trains are based in Davisville Yard, which is accessed via Line 1 Yonge–University. That line will operate using an automatic train control system, which is scheduled to go online in phases between 2017 and 2020, and the T1 trains are not compatible with this system. Since October 9, 2016, Line 4 is serviced entirely by four-car TR trains, which are operated by one staff member who both drives the train and operates the doors.

Residential development

From its opening in 2002 to 2014, the Sheppard line spurred over $1billion of construction of new housing, including several high-rise condominium towers, along its route as transit-oriented developments. Since 2000, condominium towers have been built around all five stations on the line, with the most new development being centred around Bayview and Bessarion. The Daniels Corporation built a six-tower development, called NY Towers, north of Highway 401 between Bayview and Bessarion; Arc Condominiums on the northeast corner of Bayview/Sheppard; and terraced condos just east of their NY Towers. Shane Baghai built a multi-tower development in the area.
In 2007, the Leslie and Bessarion stations were the least used stations in the system; in 2015, four of twenty planned buildings of Concord Adex Investments' new condominium complex, Concord Park Place, located between these two stations, have been completed. The complex is being developed on the site of a former Canadian Tire warehouse/distribution centre, though Canadian Tire retains a retail location there. There is also development around Swedish furniture chain IKEA in the immediate area.

Ridership

From late 2002 to 2011, ridership on the Sheppard subway rose from about 10.7million riders annually to a peak of 15.9million. However, in 2014, ridership on the line dropped by five percent to 15.1million.
The following list shows the typical number of customer-trips made on the Sheppard subway on an average weekday:
Note: 2017 figures are unavailable.

Station art

Line 4 features artwork in each station, such as the scenic mural at Sheppard–Yonge station, Bayview station's trompe-l'œil and Leslie station's individual tiles each containing the words "Sheppard & Leslie".

Criticism

The line has been derided as a "subway to nowhere", a "stubway", or a "white elephant"., the total ridership on the Sheppard subway line is approximately 50,000 per average weekday, similar to a few of the TTC's busiest streetcar and bus routes, though these routes are generally much longer than Sheppard's length. The Sheppard line feeds passengers into the Yonge segment of Line 1 Yonge–University. During the City of Toronto's 2008 budget crisis, the TTC considered shutting the line down on weekends or entirely.
Jarrett Walker, a transportation consultant and the author of the book Human Transit, says "Sheppard's technology makes it both expensive to abandon and expensive to extend; that's the trap."
Councillor Josh Colle, who chaired the TTC from December 2014 to December 2018, said in May 2015 that, given the existing Sheppard subway's performance, he cannot rationalize spending more money to expand it east from Don Mills or west from Sheppard–Yonge. He estimates that the Sheppard subway receives a subsidy of more than $10 per ride.
According to the Metro commuter newspaper, between the opening of the Sheppard line in 2002 and December 2014, there was over $1billion in development along that corridor, much of it in the vicinity of Bayview, Bessarion and Don Mills stations. The latter station has a density suitable for a subway at 10,182 people per square kilometre. Yet, despite this, a majority of commuters along the Sheppard subway drive to work rather than using public transit. According to Royson James of the Toronto Star, residents in the area are commuting to jobs throughout the Greater Toronto Area where driving is almost always more effective than taking public transit. James states that subways are designed for corridors with four to eight times the ridership along Sheppard.

Future expansion

Several informal proposals have been made to extend the line in both directions. The original proposal for the Sheppard line was for a major subway line running from Sheppard West station on the University portion of Line 1 to Scarborough Centre station. Instead, funding was only approved for a truncated line with several phased expansions.

Eastward extension

The TTC considered the eastward extension of the Sheppard line to Scarborough Centre station as one of its top priorities for rapid-transit expansion, which would expand rapid transit in Scarborough for the first time since the completion of Line 3 Scarborough. The eastward extension would include new stations at Consumers Road, Victoria Park Avenue, Warden Avenue, Kennedy Road, Agincourt GO Station, and Progress Avenue, terminating at the existing Scarborough Centre Station on Line 3 Scarborough. The expansion proposal also included the possible addition of a station at Willowdale Avenue between Sheppard–Yonge and Bayview stations on the existing portion of the line.
The TTC estimates that a Sheppard subway to Scarborough Centre would have 7,800 riders per hour while 10,000 per hour is the minimum number of riders per hour considered appropriate for a subway. The maximum capacity of the subway is about 30,000 riders per hour, approximately the load the Yonge line carries in the morning rush.

Westward extension

A separate westward extension to Sheppard West station considered the creation of stations at Senlac Road, Bathurst Street, and Faywood Boulevard. Lower population density made this expansion a much lower priority, as the minimal increase in ridership was insufficient to justify the costs. The approval of the Spadina subway extension to the Vaughan Metropolitan Centre in York Region renewed interest in this phase, as a subway connection between Sheppard West and Sheppard–Yonge stations would significantly lower commuting times for York University students. The tunnel from Sheppard–Yonge to Welbeck Road was built for train storage at the time of original construction.
In 2013, this extension was listed as being considered as a "Unfunded Future Rapid Transit Project" in the City of Toronto's "Feeling Congested?" report.

Transit City

In March 2007, the City of Toronto and the TTC released the Transit City proposal to begin a new round of transit expansion using light rail technology on dedicated rights-of-way instead of subway technology. Under this plan, the Sheppard East subway extension had been replaced by a light rail line running from Don Mills Station along Sheppard Avenue East to Meadowvale Road, where it would meet the northern terminus of an extended Line 3 Scarborough. Under this proposal, there would be no direct connection between North York City Centre and Scarborough City Centre.
In 2009, a westward extension was again considered by the TTC to link the line to Wilson Subway Yard. It was immediately dismissed due to cost.

Rob Ford era

As a result of the election of Rob Ford as mayor of Toronto in 2010, the western extension of the Sheppard subway to Sheppard West Station and the eastern extension to Scarborough Centre were considered a priority again. Ford indicated in a December 2010 interview with The Globe and Mail newspaper that all other transit projects would come second to completing the Sheppard line. Ford stated "I'm just focusing on doing the Sheppard subway underground".
On March 31, 2011, Toronto Mayor Rob Ford announced that the proposed Sheppard East LRT line would be replaced by western and eastern extensions for the Sheppard Subway so that the completed line would run from Sheppard West Station to Scarborough Centre. The Province of Ontario approved this plan, which is estimated to cost $4.2billion. The City of Toronto will assume complete financial responsibility for the project, which is proposed to be funded through a public–private partnership, as well as surplus funds from the proposed Eglinton Crosstown line, if there will be any. Massive redevelopment along the route would be needed to generate these funds, as the current population density and projected ridership is too low to support the cost of the expansion by itself.
Metrolinx estimates that the Sheppard West extension to Sheppard West would be long, add two stations, and cost $1.48billion. The Sheppard East extension would be long, add seven stations, and cost $2.75billion.
Gordon Chong, head of the TTC agency tasked with analyzing the new subway plans, has said it is possible that no new transit development will occur along Sheppard.

Stintz's alternative

On January 23, 2012, TTC chair Karen Stintz suggested a plan to extend the line two stops eastwards funded by making the eastern portion of Line 5 Eglinton at street level. This motion was defeated by the TTC board. She then got 24 councillors to sign a petition calling for a special council meeting for February 8 of that year.
In the meeting, council voted to build the Eglinton project according to the original Transit City plan, build an at-grade Finch LRT, and to appoint a panel to recommend whether to pursue the eastward extension of the Sheppard subway or construct the Sheppard East LRT instead. The panel reported back to council on March 31, 2012. At this council meeting, council approved light rail rather than a subway extension for Sheppard. On April 26 of that year, the motion to build the LRT was announced by the Minister of Transportation after being approved unanimously by Metrolinx. The plan still needs to be approved by Ontario's cabinet, though on June 29, 2012, the Board of Directors of Metrolinx unanimously approved the same motion approved by Metrolinx in April.

Tory era and beyond

During the 2014 Toronto mayoral election, incumbent mayor Rob Ford were the only major candidates who supported completing the Sheppard Line east to McCowan and west to Sheppard West station. John Tory, who won the election, did not include anything on the Sheppard corridor in his maps; instead, he favoured SmartTrack. However, he did say that he would proceed with the LRT, although the project would not be a priority for him.
On April 27, 2015, Steven Del Duca, the Ontario Minister of Transportation, said that the LRT project would not start until at least 2021. In July 2016, Toronto City Council approved a one-stop subway extension on Line 2 Bloor–Danforth to Scarborough Centre Station. During this vote, city council also approved putting an extension of Line 4 into Scarborough back into consideration.
In April 2019, Doug Ford, who had since become Premier of Ontario, unveiled a plan for new subways in Toronto, including the new Ontario Line to replace the proposed Relief Line, an extension of Line 1 to Richmond Hill, an eastward extension of Line 2 with new stops, a westward extension of Line 5 Eglinton to Toronto Pearson International Airport and an extension of Line 4 Sheppard east to McCowan Avenue, where it would intersect with the Line 2 extension. However, money was not set aside in the government's budget for the extension.

Service frequency

The frequency for this line is 5–6 minutes at all times.
On September 4, 2005, an overnight service on Sheppard Avenue East was introduced. The 385 Sheppard East Blue Night bus route provides late-night service when the subway is not in operation with the frequency of 30 minutes. This service terminates at Sheppard–Yonge station and follows Sheppard Avenue to Meadowvale.