Link Train


The Link Train is an automated people mover at Toronto Pearson International Airport in Mississauga, Ontario, Canada.
The wheelchair-accessible train runs 24 hours a day, seven days a week and is completely free-of-charge to ride. In 2012, it transported 17,000 passengers daily, 60 to 70% of whom were airport staff.

History

The original proposal for an automated people mover system at Pearson Airport was submitted in May 2002. Six months later, on November 15, 2002, a $55-million contract was signed with DCC Doppelmayr Cable Car GmbH of Wolfurt, Austria, followed by four years of construction, and the system opened to the public on July 6, 2006. The new service initially operated alongside its predecessor, the Link shuttle bus system.
The system cost $150 million.

Design and rolling stock

The Link Train uses a pair of Cable Liner trains. They use a cable-hauled, drive and tension system. Each train has capacity for 175 passengers with baggage or 2,500 passengers per hour per direction.
The two trains, plus a small work car, cost a total of when delivered. They were refurbished in 2013, and received a new paint scheme, new seats, and a seventh car.

Stations and operation

The two fully elevated lines, running side-by-side, are long, and have a travel time of four minutes one way. They serve a total of three stations:
Both lines operate independently in shuttle mode with a total capacity of up to 2,180 pphpd. The trains run on rubber tires on a smooth steel surface and all propulsion is provided by the cable. The absence of onboard motors, braking systems and gearboxes eliminates excessive noise, oil spills from the trains, and dust from brakes. Doppelmayr asserts that a cable-driven APM is the most environmentally responsible solution for transportation in high density applications.
Length
ConfigurationDual track shuttle with two trains operating independently
Operating Speed
Headway250 s
Dwell Time36 s
GuidewayElevated steel tube truss
System Capacity2,500 pphpd
Stations3
TrainsTwo 7-car trains
Train Capacity25 passengers/vehicle, 175 passengers/train

Disruptions

On March 30, 2009, the Link Train was put out of service for extensive maintenance due to engineering design flaws. During this time, service was replaced by an inter-terminal shuttle bus contracted to Penetang-Midland Coach Lines. Normal service resumed in July 2009.
On March 16, 2013, the Link Train was shut down for approximately eight months during construction of the Union Pearson Express. The trains were refurbished during this time and received a seventh car, new seats, and a new paint scheme.

Connections

The Union Pearson Express airport rail link service between Pearson Airport and Union Station in Downtown Toronto opened on June 6, 2015, in time for the 2015 Pan American Games. It directly serves Terminal 1, with a connection to Terminal 3 via the Link Train.
A number of public transport bus services in the GTA have a stop on the lower level of Terminal 1; these include the Toronto Transit Commission, MiWay, Brampton Transit, and GO Transit. The TTC has an additional stop on the lower level at Terminal 3, served after departing Terminal 1.
As originally proposed, Line 5 Eglinton was to connect Pearson Airport with Scarborough by 2018 as part of the Transit City plan.
However, when the four Transit City lines were found to be $2.4 billion over their funding envelope in January 2010, parts of the network were deferred, including the western section of the Eglinton LRT. A future extension could eventually reach the airport, completing the line as envisioned. As of 2020 planning for the western extension is underway and Metrolinx hopes to complete the line by 2030-31.