MBTA boat


The MBTA boat or MBTA ferry system is a public boat service providing water transportation in Boston Harbor. It is operated by Boston Harbor Cruises under contract to the Massachusetts Bay Transportation Authority. The system consists of three routes that terminate in downtown Boston. F1 service runs from Rowes Wharf to Hewitt's Cove in Hingham. F2H service runs from Long Wharf to Hewitt's Cove, with some trips stopping at Logan Airport, Pemberton Point in Hull, and/or some of the Boston Harbor Islands. F4 service runs in the inner harbor between Long Wharf and the Charlestown Navy Yard. Two additional seasonal routes, not funded by the MBTA but included on some MBTA documents, run from Boston to Salem and Winthrop.
In the 19th century, numerous steamship routes ran from Boston to various destinations in the inner harbor, North Shore, and South Shore, plus routes to elsewhere in New England and to Europe. Ferry service declined in the late 19th century and 20th century due to competition from railways, streetcars, and finally automobiles; by the 1930s, only summer routes plus the East Boston ferry remained. Year round service to Hull was reintroduced in 1963, and was then the only commuter ferry service in the country. This was followed by Hingham service in 1975, tourist-oriented Charlestown service in 1979, and Quincy service in 1996 – as well as several other short-lived routes. Most routes were either unsubsidized or state-funded; from 1986 to 2002, they gradually became subsidized by the MBTA. Service to Quincy and Hull was combined in 1998; in 2013, the Quincy terminal was replaced by Hingham due to wharf damage.
The MBTA owns two ferries used on the F2H route; BHC owns ferries used on the F1 and F4 routes. The ferry system has the highest on-time performance and farebox recovery ratio of MBTA service types. However, it is only a small component of MBTA service: in 2014, the three MBTA-funded routes carried 5,070 passengers per weekday – about 0.3% of total MBTA ridership.

Routes

Inner Harbor ferry

Boat service between Boston and Charlestown ended in 1786 after the completion of the Charles River Bridge. The Winnisimmet Ferry to Chelsea ran until January 1917, with a brief revival starting on May 15, 1990 during early Big Dig construction. Boston Harbor Cruises began tourist-oriented service, funded by the National Park Service, between Long Wharf and the Navy Yard in June 1979. In June 1987, this was switched to general-purpose ferry service funded by the Boston Redevelopment Authority. In October 1988, the Massachusetts Department of Public Works began a four-year reconfiguration of the interchange between the Tobin Bridge and the Charlestown High Bridge. Charlestown ferry service was then increased, with funding from the DPW via the MBTA, and increased again in 1989. In 2004, the MBTA began directly funding the service.
Two additional routes – the F3 Lovejoy Wharf–Boston Navy Yard and F5 Lovejoy Wharf–World Trade Center via Moakley Courthouse – began operation in 1997 during Big Dig construction. They were discontinued on January 21, 2005 due to low ridership. The F5X Lovejoy Wharf–World Trade Center express route was not funded by the MBTA and was run until February 24, 2006. A one-year pilot of a privately funded Lovejoy Wharf–Fan Pier route, intended mostly as a private employee shuttle, began in January 2019. It is overseen by the Massachusetts Convention Center Authority on behalf of private companies in the Seaport, rather than by the MBTA. The fare for public riders was substantially reduced in April 2019.
F4 service was indefinitely suspended on March 17, 2020 due to reduced ridership during the COVID-19 pandemic. On June 22, 75% of weekday service was restored, though weekend service remains suspended.

East Boston

Ferry service to East Boston began in 1832 and lasted until 1952. City-run service ran from a wharf at Lewis Street to Long Wharf from 1995 to 1997; it was discontinued due to extremely low ridership as the Blue Line provided a faster and more frequent service along the same corridor.
In 2011, then-mayor Thomas Menino proposed ferry service between East Boston and Fan Pier on the South Boston Waterfront, a route without current direct transit service. In August 2012, the Federal Highway Administration awarded $1.28 million to the city for the purchase of two boats. In September 2012, the Boston Redevelopment Authority accepted the grant and agreed to rehabilitate the East Boston Marine Terminal for the ferries, which were then expected to begin operation in 2013. In August 2014, the MBTA opened bidding for providing the two boats for East Boston service. However, the grant was less than the actual cost of two boats, and plans for the service stalled.

South Shore

Ferry service between Boston and Hingham began in 1832; after the South Shore Railroad began operation in 1849, ferries served largely recreational traffic rather than commuters. Service to Hull was added in 1848, and to Nantasket Beach in 1869. Service to the Hingham shipyard ended in 1898, though some service to Crow's Point lasted until 1923. Most of the Nantasket Boat Lines ferries were destroyed in a 1929 fire. The service was increasingly unprofitable to run; only summer service lasted past 1933. Hingham service ended in 1952; the last remains of Nantasket service ended in 1963. Massachusetts Bay Lines restored year-round Pemberton Point–Boston service in March 1963 – then the only commuter ferry service in the country – followed by seasonal Nantasket service in 1964. Bay State Cruises took over the route in 1980. Paragon Park closed in 1985, and Nantasket service ended again in 1992. In 1996, Bay State Cruises sold the Hull route to Boston Harbor Cruises, who obtained an MBTA subsidy.
Renewed Rowes Wharf–Hingham service began with a single round trip on October 6, 1975. The service was initiated by Ed King, then director of the Massachusetts Port Authority. Service was run by several operators, sometimes with state funding, most of the next eight years. In March 1983, Massachusetts Bay Commuter Services began eleven subsidized round trips. The state began subsidizing eight additional round trips by Boston Harbor Commuter Services in 1984 during Southeast Expressway reconstruction. The MBTA began subsidizing service in 1986; after 1991, only Boston Harbor Commuter Services received a subsidy. In the 1990s, expanded ferry service was proposed as an alternative to the controversial return of commuter rail service on the Greenbush Line. Boston Harbor Cruises took over the Hingham–Boston service in 1997.
In 1996, Water Transportation Associates, doing business as Harbor Express, began service between Fore River Shipyard in Quincy and Long Wharf via Logan Airport. Two ferries and five years of operations were funded by then-shipyard owner General Dynamics. Quincy–Logan service began on November 18, 1996, with Long Wharf service added several weeks later. In 1998, the MBTA and BHC failed to reach a subsidy agreement. MBTA-subsidized Hull stops were added to several existing WTA Boston-Hingham trips. After the original funding ran out in 2001, the state funded service for the first half of 2002. In April 2002, the MBTA bought the WTA assets ; the WTA later won the contract to run the service. The MBTA designated the Hingham–Boston service as F1 and Quincy–Boston as F2, with trips serving Hull called F2H. Attempts in 2010 and 2011 to restore summer weekend service to Nantasket failed due to high fuel costs. On July 1, 2013, BHC took over Hingham services from WTA.
Quincy service was temporarily discontinued on October 14, 2013, with boats redirected to Hingham, when a water main break added to existing structural problems with the sea wall at the Quincy wharf. In January 2014, the MBTA made the closure permanent after it was determined that repairs would cost $15 million for five years of additional service, or $50 million for 50 years. The damage also forced the closure of the USS Salem museum. Quincy proposed Squantum Point as an alternative terminal to maintain ferry service to the city. In July 2014, a neighboring shipyard purchased the Quincy site from the MBTA. The Salem was to be moved to East Boston in 2015; however, in February 2016 it was determined that it would stay in Quincy and eventually reopen. In 2019, Quincy submitted an application to the MBTA to establish Squatum–Logan–Boston service in 2020.
Weekend summer service on the F2H route, last operated in 1998 and 1999, was introduced on May 24, 2014. The Hingham Intermodal Center was opened in January 2017, providing a larger waiting area and ticketing facilities. On January 2, 2018, ferry service to Hingham was indefinitely suspended due to ice damage to the dock during severe cold the previous week. Service resumed on January 15 after repairs to the dock.
F1 and F2H was suspended on March 17, 2020 due to reduced ridership during the COVID-19 pandemic. On June 22, 75% of weekday service was restored, though weekend service remains suspended.

North Shore

Two summer-only routes to the North Shore are not funded by the MBTA but are included on MBTA maps:
Steamboat service between Salem and Boston was run at various points between 1818 and 1931; because of competition from the Eastern Railroad, it was largely intended for recreation. Service to Winthrop was operated during several periods between 1840 and 1898; it too was largely out-competed by the Boston, Revere Beach and Lynn Railroad for the commuter market. Lynn service was operated in the 1870s, and between 1892 and 1908. Ferry service between Boston and Salem was operated during the summer of 1998 by WTA, funded by a state grant. BHC ran unsubsidized service in the summers of 1999 and 2000. Salem service resumed on June 22, 2006, with a ferry funded largely by a $2.3 million state grant. It was operated by WTA during the summers of 2006 to 2011; BHC took over the service without subsidy in 2012. In 2009, Salem began allowing MBTA Commuter Rail passes to be used on certain peak-hour trips.
Winthrop service, run by BHC under a three-year state grant, began on August 2, 2010 and lasted until 2012. A local charter operator ran some unsubsidized service in 2013. Service resumed on April 16, 2016 with a town-owned vessel operated by town employees. The Marina Bay stop was added on August 16, 2016. The Boston terminal was at Fan Pier from April to June 2017, then Rowes Wharf for the remainder of the summer. Central Wharf became the Boston terminal in 2018. The service's high cost and low reliability has attracted criticism; it was not run for six weeks in 2019 due to mechanical issues and lack of staff.
The Lynn Ferry formerly operated from Lynn Ferry Terminal to Central Wharf. Service began on May 19, 2014 with three weekday round trips, as a two-year pilot program funded by the state. Fares were $3.50; MBTA Commuter Rail passes from Zone 2 or above were accepted for fares. Although the state spent $8.5 million on the terminal and $4.5 million in federal funds was secured for a larger ferry, the service was not run in summer 2016 due to lack of $700,000 in operations funding. Service resumed for June—September 2017 with funding from MassDOT, with one daily round trip timed for commuting. Fares were doubled to $7, and MBTA passes were not accepted. Due to low ridership in 2017 – just 30 daily passengers – the service was not resumed in 2018.

Operation

All MBTA-funded services are operated by Boston Harbor Cruises under contract to the MBTA. The Salem route is also operated by Boston Harbor Cruises, but under contract to the town. It is the most reliable mode of MBTA service, with on-time performance typically above 95%. In 2014, the MBTA-funded portion of the system carried 5,070 passengers per weekday – about 0.3% of total MBTA ridership.
Until 2017, the MBTA owned two ferries, the Lightning and the Flying Cloud, both built in 1996. They were largely replaced by the new catamarans Champion in October 2017, and Glory in May 2018. The MBTA-owned ferries are used for the F2H route, while BHC-owned ferries are used for the F1 and F4 routes., the MBTA plans to overhaul the older catamarans in 2020–22; new double-ended ferries for route F4 are also being considered.

Finances and averted cuts

MBTA boat services have the highest farebox recovery ratio of any MBTA service type – 55% in 2012. However, the service still operated at a $5 million annual loss to the MBTA and carried a relatively small percentage of passengers, which resulted in calls for its discontinuance or modification. In 2012, facing a substantial budget gap, the MBTA proposed substantial service cuts and fare increases. All ferry routes were to be cut, resulting in $3.7 million savings for the agency. Temporary measures were found to avoid some service cuts including the ferries; however, weekend Quincy service was eliminated and fares raised 35% in an attempt to eliminate the subsidy required. State lawmakers also then proposed that Massport take over the ferries from the MBTA.
By 2014, farebox recovery increased to 62%. In 2018, the MBTA bid operation of all three routes in a single contract; BHC was the only bidder despite the MBTA's attempts to find a competitor. The cost was originally $17.2 million for the first year with annual increases ; the MBTA negotiated the cost down to $13.6 million.