Massachusetts Bay Transportation Authority
The Massachusetts Bay Transportation Authority is the public agency responsible for operating most public transportation services in Greater Boston, Massachusetts. Earlier modes of public transportation in Boston were independently owned and operated; many were first folded into a single agency with the formation of the Metropolitan Transit Authority in 1947. The MTA was replaced in 1964 with the present-day MBTA, which was established as an individual department within the Commonwealth of Massachusetts before becoming a division of the Massachusetts Department of Transportation in 2009.
The MBTA and Philadelphia's Southeastern Pennsylvania Transportation Authority are the only US transit agencies that operate all five major types of terrestrial mass transit vehicles: light rail vehicles ; heavy rail trains ; regional rail trains ; electric trolleybuses ; and motor buses. In 2016, the system averaged 1,277,200 passengers per weekday, of which heavy rail averaged 552,500 and the light-rail lines 226,500, making it the fourth-busiest subway system and the busiest light rail system in the United States.
The MBTA is the largest consumer of electricity in Massachusetts, and the second-largest land owner.
In 2007, its CNG bus fleet was the largest consumer of alternative fuels in the state. The MBTA operates an independent law enforcement agency, the Massachusetts Bay Transportation Authority Police.
History
Mass transportation in Boston was provided by private companies, often granted charters by the state legislature for limited monopolies, with powers of eminent domain to establish a right-of-way, until the creation of the MTA in 1947. Development of mass transportation both followed and shaped economic and population patterns.Railways
Shortly after the steam locomotive became practical for mass transportation, the private Boston and Lowell Railroad was chartered in 1830. The rail, which opened in 1835, connected Boston to Lowell, a major northerly mill town in northeast Massachusetts' Merrimack Valley, via one of the oldest railroads in North America. This marked the beginning of the development of American intercity railroads, which in Massachusetts would later become the MBTA Commuter Rail system and the Green Line D branch.Streetcars
Starting with the opening of the Cambridge Railroad on March 26, 1856, a profusion of streetcar lines appeared in Boston under chartered companies. Despite the change of companies, Boston is the city with the oldest continuously working streetcar system in the world. Many of these companies consolidated, and animal-drawn vehicles were converted to electric propulsion.Subways and elevated railways
Streetcar congestion in downtown Boston led to the subways in 1897 and elevated rail in 1901. The Tremont Street subway was the first rapid transit tunnel in the United States. Grade-separation added capacity and avoided delays caused by cross streets. The first elevated railway and the first rapid transit line in Boston were built three years before the first underground line of the New York City Subway, but 34 years after the first London Underground lines, and long after the first elevated railway in New York City; its Ninth Avenue El started operations on July 1, 1868 in Manhattan as an elevated cable car line.Various extensions and branches were added at both ends, bypassing more surface tracks. As grade-separated lines were extended, street-running lines were cut back for faster downtown service. The last elevated heavy rail or "El" segments in Boston were at the extremities of the Orange Line: its northern end was relocated in 1975 from Everett to Malden, MA, and its southern end was relocated into the Southwest Corridor in 1987. However, the Green Line's Causeway Street Elevated remained in service until 2004, when it was relocated into a tunnel with an incline to reconnect to the Lechmere Viaduct. The Lechmere Viaduct and a short section of steel-framed elevated at its northern end remain in service, though the elevated section will be cut back slightly and connected to a northwards viaduct extension in 2017 as part of the Green Line Extension.
Public enterprise
The old elevated railways proved to be an eyesore and required several sharp curves in Boston's twisty streets. The Atlantic Avenue Elevated was closed in 1938 amidst declining ridership and was demolished in 1942. As rail passenger service became increasingly unprofitable, largely due to rising automobile ownership, government takeover prevented abandonment and dismantlement. The MTA purchased and took over subway, elevated, streetcar, and bus operations from the Boston Elevated Railway in 1947.In the 1950s, the MTA ran new subway extensions, while the last two streetcar lines running into the Pleasant Street Portal of the Tremont Street Subway were substituted with buses in 1953 and 1962. In 1958 the MTA purchased the Highland Branch from the Boston and Albany Railroad, reopening a year later as rapid transit line.
While the operations of the MTA were relatively stable by the early 1960s, the privately operated commuter rail lines were in freefall. The New Haven Railroad, New York Central Railroad, and Boston and Maine Railroad were all financially struggling; deferred maintenance was hurting the mainlines while most branch lines had been discontinued. The 1945 Coolidge Commission plan assumed that most of the commuter rail lines would be replaced by shorter rapid transit extensions, or simply feed into them at reduced service levels. Passenger service on the entire Old Colony Railroad system serving the southeastern part of the state was abandoned by the New Haven Railroad in 1959, triggering calls for state intervention. Between January 1963 and March 1964, the Mass Transportation Commission tested different fare and service levels on the B&M and New Haven systems. Determining that commuter rail operations were important but could not be financially self-sustaining, the MTC recommended an expansion of the MTA to commuter rail territory.
On August 3, 1964, the MBTA succeeded the MTA, with an enlarged service area intended to subsidize continued commuter rail operations. The original 14-municipality MTA district was expanded to 78 cities and towns. Several lines were briefly cut back while contracts with out-of-district towns were reached, but, except for the outer portions of the Central Mass Branch, West Medway Branch, Blackstone Line, and B&M New Hampshire services, these cuts were temporary; however, service on three branch lines was dropped permanently between 1965 and 1976. The MBTA bought the Penn Central commuter rail lines in January 1973, Penn Central equipment in April 1976, and all B&M commuter assets in December 1976; these purchases served to make the system state-owned with the private railroads retained solely as operators. Only two branch lines were abandoned after 1976: service on the Lexington Branch was discontinued in January 1977 after a snowstorm blocked the line, while the Lowell Line's full-service Woburn Branch was eliminated in January 1981 due to poor track conditions.
The MBTA assigned colors to its four rapid transit lines in 1965, and lettered the branches of the Green Line from north to south. Shortages of streetcars, among other factors, caused bustitution of rail service on two branches of the Green Line. The A branch ceased operating entirely in 1969 and was replaced by the 57 bus, while the E branch was truncated from Arborway to Heath Street in 1985, with the section between Heath Street and Arborway being replaced by the 39 bus.
The MBTA purchased bus routes in the outer suburbs to the north and south from the Eastern Massachusetts Street Railway in 1968. As with the commuter rail system, many of the outlying routes were dropped shortly before or after the takeover due to low ridership and high operating costs.
In the 1970s, the MBTA received a boost from the Boston Transportation Planning Review area-wide re-evaluation of the role of mass transit relative to highways. Producing a moratorium on highway construction inside Route 128, numerous mass transit lines were planned for expansion by the Voorhees-Skidmore, Owings and Merrill-ESL consulting team. The removal of elevated lines continued, and the closure of the Washington Street Elevated in 1987 brought the end of rapid transit service to the Roxbury neighborhood. Between 1971 and 1985, the Red Line was extended both north and south, providing not only additional subway system coverage, but also major parking structures at several of the terminal and intermediate stations.
In 1981, seventeen people and one corporation were indicted for their roles in a number of kickback schemes at the MBTA. Massachusetts Secretary of Transportation and MBTA Chairman Barry Locke was convicted of five counts of bribery and sentenced to 7 to 10 years in prison.
21st century
By 1999, the district was expanded further to 175 cities and towns, adding most that were served by or adjacent to commuter rail lines, though the MBTA did not assume responsibility for local service in those communities adjacent to or served by commuter rail.in Boston, a major MBTA, Amtrak and bus transportation hub
, opened in April 2012.
electronic countdown sign. After years of delays, the first countdown signs on the Red Line were activated in 2012.
A turning point in funding occurred in 2000. Prior to July 1, 2000, the MBTA was reimbursed by the Commonwealth of Massachusetts for all costs above revenue collected. Beginning on that date, the T was granted a dedicated revenue stream consisting of amounts assessed on served cities and towns, along with a dedicated 20% portion of the 5% state sales tax. The MBTA now had to live within this "forward funding" budget.
The Commonwealth assigned to the MBTA responsibility for increasing public transit to compensate for increased automobile pollution from the Big Dig. However, these projects have strained the MBTA's limited resources, since the Big Dig project did not include funding for these improvements. Since 1988, the MBTA has been the fastest expanding transit system in the country, even as Greater Boston has been one of the slowest growing metropolitan areas in the United States. The MBTA subsequently went into debt, and rates underwent an appreciable hike on January 1, 2007.
In 2006, the creation of the MetroWest Regional Transit Authority saw several towns subtract their MWRTA assessment from their MBTA assessment, though the amount of funding the MBTA received remained the same. The next year, the MBTA started commuter rail service to the Greenbush section of Scituate, the third branch of the Old Colony service. Rhode Island also paid for extensions of the Providence/Stoughton Line to T.F. Green Airport in 2010 and Wickford Junction in 2012. A new station on the Fairmount Line, the Talbot Avenue station, opened in November 2012.
On June 26, 2009, Governor Deval Patrick signed a law to place the MBTA along with other state transportation agencies within the administrative authority of the Massachusetts Department of Transportation, with the MBTA now part of the Mass Transit division.
The 2009 transportation law continued the MBTA corporate structure and changed the MBTA board membership to the five Governor-appointed members of the Mass DOT Board.
Charlie Baker administration (2015–present)
In February 2015, there was record breaking snowfall in Boston from the 2014–15 North American winter causing severe delays on all MBTA subway lines. and many long-term operational and financial problems with the entire MBTA system coming under greater public attention, Massachusetts Governor Charlie Baker indicated at the time that he was reluctant to discuss the financing issues but that he would "have more to say about that in a couple of weeks." Baker subsequently announced the formation of a special advisory panel to diagnose the MBTA's problems and write a report recommending proposals to address them. The special advisory panel formed the previous February released its report in April 2015. The next month, Baker appointed a new MassDOT Board of Directors and proposed a five-year winter resiliency plan with $83 million being spent to update infrastructure, purchase new equipment, and improve operations during severe weather.Ground was broken for the $38.5 million renovation of Ruggles Station, in Roxbury, in August 2017. This was followed by the start of construction on the Green Line Extension the following June. In April 2018, the MBTA Silver Line began operating a route from Chelsea to South Station.
A Red Line derailment that resulted in train delays for several months brought more attention to capital maintenance problems at the T. After complaints from many riders and business groups, the governor proposed adding $50 million for an independent team to speed up inspections and capital projects, and general efforts to speed up existing capital spending from $1 billion to $1.5 billion per year. Replacement of the Red Line signal system were accelerated, including equipment that was damaged in the derailment. Baker proposed allocating to the MBTA $2.7 billion from the state's five-year transportation bond bill plus more money from the proposed multi-state Transportation Climate Initiative.
A December 2019 report by the MBTA’s Fiscal and Management Control Board panel found "safety is not the priority at the T, but it must be." The report said "there is a general feeling that fiscal controls over the years may have gone too far, which coupled with staff cutting has resulted in the inability to accomplish required maintenance and inspections, or has hampered work keeping legacy system assets fully functional."
COVID-19 pandemic
In February 2020, the COVID-19 pandemic began to impact Massachusetts. When the stay-at-home order was issued the following month, businesses closed or sent staff to work from home, and people were advised to avoid riding public transit unless necessary. At the lowest point, MBTA ridership dropped about 78% on buses, 92% on the subway, on 71% paratransit, and 97% on commuter rail. Bus and subway ran on a modified Saturday schedule; commuter rail was on a reduced schedule and ferries were shut down completely. To facilitate social distancing from drivers, buses started running fare-free with rear-door-only boarding, passengers were required to wear face masks, and the agency began frequently sanitizing vehicles and stations. Driver availability was limited as some employees contracted the virus. The T received $827 million in federal aid for FY2020 and FY2021 to make up for increased costs and lost revenue.In June, the MBTA announced that commuter rail tickets and passes valid as of March 10 would be valid for 90 days, starting on June 22. It also made various fare changes to encourage riders to shift from potentially crowded bus or subway, including discounted ten-ride tickets, half-price tickets for youth, and Zone 1A fares extended to Lynn and River Works stations.
Services
Buses
See also: List of MBTA bus routesXDE40 Hybrid bus
AN440LF
The MBTA bus system is the nation's sixth largest by ridership and comprises over 150 routes across the Greater Boston area. The area served by the MBTA's bus operations is somewhat larger than its subway and light rail service area, but is significantly smaller than that served by the MBTA's commuter rail operation. At least eight other regional transit authorities also provide bus services within that larger area, these being the Rhode Island Public Transit Authority, Brockton Area Transit Authority, Cape Ann Transportation Authority, Greater Attleboro Taunton Regional Transit Authority, Lowell Regional Transit Authority, Merrimack Valley Regional Transit Authority, Montachusett Regional Transit Authority, and Worcester Regional Transit Authority. All of these authorities have their own fare structures and some subcontract operation to private bus companies. In many cases, their buses serve as feeders to the MBTA commuter rail.
Within MBTA's bus service area, transfers from the subway are free if using a CharlieCard ; transfers to the subway require paying the difference between bus and the higher subway fare. Bus-to-bus transfers are free unless paying cash. Many of the outlying routes run express along major highways to downtown. The buses are colored yellow on maps and in station decor.
The Silver Line is the MBTA's first service designated as bus rapid transit, even though it lacks many of the characteristics of bus rapid transit. The first segment began operations in 2002, replacing the 49 bus, which in turn replaced the Washington Street Elevated section of the Orange Line. A full subway fare was charged, with free transfers to the subways downtown until January 1, 2007, when the fare system was revised to categorize the service as a "bus" for fare purposes. The "Washington Street" segment runs along various downtown streets, and mostly in dedicated bus lanes on Washington Street itself. Two Washington Street routes start at Dudley Station in Roxbury and one terminates at Downtown Crossing on Temple Place and one to South Station on Essex Street
The "Waterfront" section opened at the end of 2004, and connects South Station to Logan Airport with route SL1 via Ted Williams Tunnel and South Boston with route SL2. A new service to Chelsea opened April 21, 2018 via the same tunnel that SL1 uses and stops at the Airport Station of the Blue Line. The buses that run the Waterfront section are 2004-05 dual-mode buses, trackless trolley in the Silver Line tunnel and diesel outside. Service to Logan Airport began in June 2005. The Waterfront segment is classified as a "subway" for fare purposes. A transfer between segments is possible at South Station.
A "Phase III" tunneled segment was proposed to connect the two segments for through service, but it was controversial due to high cost and the fact that many did not consider Phase I to be adequate replacement service for the old Elevated. All Phase III tunneling proposals have been suspended due to lack of funds, as has the Urban Ring, which was intended to expand upon existing crosstown buses.
The MBTA contracts with private bus companies to provide subsidized service on certain routes outside of the usual fare structure. These are known collectively as the HI-RIDE Commuter Bus service, and are not numbered or mapped in the same way as integral bus services.
Four routes connecting to Harvard Station still run as trackless trolleys; there was once a much larger trackless trolley system.
In FY2005, there were on average 363,500 weekday boardings of MBTA-operated buses and trackless trolleys, or 31.8% of the MBTA system. Another 4,400 boardings occurred on subsidized bus routes operated by private carriers.
In June 2020 in the aftermath of COVID-19 pandemic, the MBTA had begun providing real-time information on crowding. The information would be available on the MBTA website, E Ink screens, and in the Transit app. At conception the service is was only available on bus routes 1, 15, 16, 22, 23, 31, 32, 109, and 110, and it remains unclear if further lines or transit modes will be introduced in the future or if this feature will remain permanent. This feature however is not new, since 2019 Google Maps has provided this data.
Subway
The subway system has three heavy rail rapid transit lines, and two light rail lines. The system operates according to a spoke-hub distribution paradigm, with the lines running radially between central Boston and its environs. It is common usage in Boston to refer to all four of the color-coded rail lines which run underground as "the subway" or "the T", regardless of the actual railcar equipment used.All four subway lines cross downtown, forming a quadrilateral configuration, and the Orange and Green Lines also connect directly at two stations just north of downtown. The Red Line and Blue Line are the only pair of subway lines which do not have a direct transfer connection to each other. Because the various subway lines do not consistently run in any given compass direction, it is customary to refer to line directions as "inbound" or "outbound". Inbound trains travel towards the four downtown transfer stations, and outbound trains travel away from these hub stations.
The Green Line has four branches in the west: B, C, D, and E. The A branch formerly went to Watertown, filling in the north-to-south letter assignment pattern, and the E branch formerly continued beyond Heath Street to Arborway.
The Red Line has two branches in the south, Ashmont and Braintree, named after their terminal stations.
The colors were assigned on August 26, 1965 in conjunction with design standards developed by Cambridge Seven Associates, and have served as the primary identifier for the lines since the 1964 reorganization of the MTA into the MBTA. The Orange Line is so named because it used to run along Orange Street, as the former "Orange Street" also was the street that joined the city to the mainland through Boston Neck in colonial times; the Green Line because it runs adjacent to parts of the Emerald Necklace park system; the Blue Line because it runs under Boston Harbor; and the Red Line because its northernmost station used to be at Harvard University, whose school color is crimson.
The four transit lines all use standard rail gauge, but are otherwise incompatible; trains of one line would have to be modified to run on another. Orange and Blue Line trains are similar enough that modification of some Blue Line trains for operation on the Orange Line was considered, although ultimately rejected for cost reasons. Also, some of the new Blue Line cars from Siemens Transportation were tested on the Orange Line after hours, before acceptance for revenue service on the Blue Line. There are no direct track connections between lines, except between the Red Line and Ashmont-Mattapan High Speed Line, but all except the Blue Line have little-used connections to the national rail network, which have been used for deliveries of railcars and supplies.
Opened in September 1897, the four-track-wide segment of the Green Line tunnel between Park Street and Boylston stations was the first subway in the United States, and has been designated a National Historic Landmark. The downtown portions of what are now the Green, Orange, Blue, and Red line tunnels were all in service by 1912. Additions to the rapid transit network occurred in most decades of the 1900s, and continue in the 2000s with the addition of Silver Line bus rapid transit and planned Green Line expansion.
In FY2005, there were on average 628,400 weekday boardings on the rapid transit and light rail lines, or 55.0% of the MBTA system.
On January 29, 2014, the MBTA completed a countdown clock display system, alerting passengers to arriving trains, at all 53 heavy rail subway stations. The MBTA introduced countdown clocks in underground Green Line stations during 2015. Unlike the other countdown clocks which count down in minutes, the Green Line clocks count down the number of stops away the train is.
Commuter rail
The MBTA Commuter Rail system is a regional rail network that reaches from Boston into the suburbs of eastern Massachusetts. The system consists of twelve main lines, three of which have two branches. The rail network operates according to a spoke-hub distribution paradigm, with the lines running radially outward from the city of Boston. Eight of the lines converge at South Station, with four of these passing through Back Bay station. The other four converge at North Station. There is no passenger connection between the two sides; the Grand Junction Railroad is used for non-revenue equipment moves accessing the maintenance facility. The North–South Rail Link has been proposed to connect the two halves of the system; it would be constructed under the Central Artery tunnel of the Big Dig.Special MBTA trains are run over the Franklin Line and the Providence/Stoughton Line to Foxborough station for New England Patriots home games and other events at Gillette Stadium. The CapeFLYER intercity service, operated on summer weekends, uses MBTA equipment and operates over the Middleborough/Lakeville Line. Amtrak runs regularly scheduled intercity rail service over four lines: the Lake Shore Limited over the Framingham/Worcester Line, Acela Express and Northeast Regional services over the Providence/Stoughton Line, and the Downeaster over sections of the Lowell Line and Haverhill Line. Freight trains run by Pan Am Southern, Pan Am Railways, CSX Transportation, the Providence and Worcester Railroad, and the Fore River Railroad also use parts of the network.
The first commuter rail service in the United States was operated over what is now the Framingham/Worcester Line beginning in 1834. Within the next several decades, Boston was the center of a massive rail network, with eight trunk lines and dozens of branches. By 1900, ownership was consolidated under the Boston and Maine Railroad to the north, the New York Central Railroad to the west, and the New York, New Haven and Hartford Railroad to the south. Most branches and one trunk line – the former Old Colony Railroad main – had their passenger services discontinued during the middle of the 20th century. In 1964, the MBTA was formed to subsidize the failing suburban railroad operations, with an eye towards converting many to extensions of the existing rapid transit system. The first unified branding of the system was applied on October 8, 1974, with "MBTA Commuter Rail" naming and purple coloration analogous to the four subway lines. The system continued to shrink – mostly with the loss of marginal lines with one daily round trip – until 1981. The system has been expanded since, with four lines restored, six extended., and a number of stations added and rebuilt.
Several further expansions are planned or proposed. The South Coast Rail project, for which preliminary construction began in 2014, would extend the Stoughton section of the Providence/Stoughton Line to Taunton, with two branches to New Bedford and Fall River. Extensions of the Providence/Stoughton Line to Kingston, the Middleborough/Lakeville Line to Buzzards Bay, and the Lowell Line into New Hampshire are also proposed. Infill stations at Boston Landing, Blue Hill Avenue, West Station, and South Salem are under construction or planned.
Each commuter rail line has up to eleven fare zones, numbered 1A and 1 through 10. Riders are charged based on the number of zones they travel through. Tickets can be purchased on the train, from ticket counters or machines in some rail stations, or with a mobile app. If a local vendor or ticket machine is available, riders will pay a surcharge for paying with cash on board. Fares range from $2.25 to $12.50, with multi-ride and monthly passes available. In 2016, the system averaged 122,600 daily riders, making it the fourth-busiest commuter rail system in the nation.
The MBTA commuter rail network was the first in the nation to offer free on-board Wi-Fi. It offers Wi-Fi-enabled coaches on all train sets.
Ferries
The MBTA boat system comprises several ferry routes via Boston Harbor. One of these is an inner harbor service, linking the downtown waterfront with the Boston Navy Yard in Charlestown. The other routes are commuter routes, linking downtown to Hingham, Hull, and Salem. Some commuter services operate via Logan International Airport.All boat services are operated by private sector companies under contract to the MBTA. In FY2005, the MBTA boat system carried 4,650 passengers per weekday. The service is provided through contract of the MBTA by Boston Harbor Cruises.
Paratransit
The MBTA contracts out operation of "The Ride", a door to door service for people with disabilities. Paratransit services carry 5,400 passengers on a typical weekday, or 0.47% of the MBTA system ridership. The two private service providers under contractual agreement with the MBTA for The Ride: Veterans Transportation LLC, and National Express Transit.In September 2016, the MBTA announced that paratransit users would be able to get rides from transportation network companies Uber and Lyft. Riders would pay $2 for a pickup within a few minutes instead of $3.15 for a scheduled pickup the next day. The MBTA would pay $13 instead of $31 per ride.
Bicycles
Conventional bicycles are generally allowed on MBTA commuter rail, commuter boat, and rapid transit lines during off-peak hours and all day on weekends and holidays. However, bicycles are not allowed at any time on the Green Line, or the Ashmont–Mattapan High-Speed Line segment of the Red Line. Buses equipped with bike racks at the front may always accommodate bicycles, up to the capacity limit of the racks. The MBTA claims that 95% of its buses are now equipped with bike racks, except for trackless trolleys which still lack this capability.Due to congestion and tight clearances, bicycles are banned from Park Street, Downtown Crossing, and Government Center stations at all times.
However, compact folding bicycles are permitted on all MBTA vehicles at all times, provided that they are kept completely folded for the duration of the trip, including passage through faregates. Gasoline-powered vehicles, bike trailers, and Segways are prohibited.
No special permit is required to take a bicycle onto an MBTA vehicle, but bicyclists are expected to follow the rules and hours of operation. Cyclists under 16 years old are supposed to be accompanied by a parent or legal guardian. Detailed rules, and an explanation of how to use front-of-bus bike racks and bike parking are on the MBTA website.
The MBTA says that over 95% of its stations are equipped with bike racks, many of them under cover from the weather. In addition, over a dozen stations are equipped with "Pedal & Park" fully enclosed areas protected with video surveillance and controlled door access, for improved security. To obtain access, a personally registered CharlieCard must be used. Registration is done online, and requires a valid email address and the serial number of the CharlieCard. All bike parking is free of charge.
Parking
, the MBTA operates park and ride facilities at 103 locations with a total capacity of 55,000 automobiles, and is the owner of the largest number of off-street paid parking spaces in New England. The number of spaces at stations with parking varies from a few dozen to over 2,500. The larger lots and garages are usually near a major highway exit, and most lots fill up during the morning rush hour. There are some 22,000 spaces on the southern portion of the commuter rail system, 9,400 on the northern portion and 14,600 at subway stations. The parking fee ranges from $4 to $7 per day, and overnight parking is permitted at some stations.Management for a number of parking lots owned by the MBTA is handled by a private contractor. The 2012 contract with LAZ Parking was terminated in 2017 after employees were discovered "skimming" revenue; the company paid $5.5 million to settle the case. A new contract with stronger performance incentives and anti-fraud penalties was then awarded to Republic Parking System of Tennessee.
Customers parking in MBTA-owned and operated lots with existing cash "honor boxes" can pay for parking online or via phone while in their cars or once they board a train, bus, or commuter boat., the MBTA switched from to PayByPhone as its provider for mobile parking payments by smartphone. Monthly parking permits are available, offering a modest discount. Detailed parking information by station is available online, including prices, estimated vacancy rate, and number of accessible and bicycle parking slots.
, the MBTA has a policy for electric vehicle charging stations in its parking spaces, but does not yet have such facilities available.
From time to time the MBTA has made various agreements with companies that contribute to commuting options. One company the MBTA selected was Zipcar; the MBTA provides Zipcar with a limited number of parking spaces at various subway stations throughout the system.
Hours of operation
Traditionally, the MBTA has stopped running around 1 am each night, despite the fact that bars and clubs in most areas of Boston are open until 2 am. Like nearly all subways worldwide, the MBTA's subway does not have parallel express and local tracks, so much rail maintenance is only done when the trains are not running. An MBTA spokesperson has said, "with a 109-year-old system you have to be out there every night" to do necessary maintenance. The MBTA did experiment with "Night Owl" substitute bus service from 2001 to 2005, but abandoned it because of insufficient ridership, citing a $7.53 per rider cost to keep the service open, five times the cost per passenger of an average bus route.A modified form of the MBTA's previous "Night Owl" service was experimentally reinstated starting in the spring of 2014 – this time, all subway lines were proposed to run until 3 am on weekends, along with the 15 most heavily used bus lines and the para-transit service "The Ride".
Starting March 28, 2014, the late-night service began operation on a one-year trial basis, with service continuation depending on late-night ridership and on possible corporate sponsorship., late-night ridership was stable, and much higher than the earlier failed experimental service. However, it is still unclear whether and on what basis the program might be extended past its first year. The extended hours program has not been implemented on the MBTA commuter rail operations.
In early 2016, the MBTA decided that Late-Night service would be canceled because of lack of funding. The last night for late-night service was on March 19, 2016. The last train left at 2 a.m. on March 19, 2016.
in 2018 the MBTA further tried "Early Morning and Late Night Bus Service Pilots".
In June 2019, a year after the trials the board voted to make some changes to the schedule which would allow for further late night service to be incorporated long term
Ridership
During Fiscal Year 2013, the entire MBTA system had a typical weekday passenger ridership of 1,297,650. The MBTA's rapid transit lines accounted for 59% of all rides, buses accounted for 30%, and commuter rail accounted for 10% of all rides. The MBTA's ferries and paratransit accounted for the remaining 1% of rides.Passenger ridership has been steadily growing over the years, and between 2010 and 2013, the system saw passenger ridership grow 4.6% or an additional 57,000 daily passengers to the system.
2004 | 2007 | 2010 | 2013 | +/- | |
Rapid transit | - | - | - | - | - |
Red Line | 210,500 | 226,417 | 241,603 | 272,684 | +29.5% |
Green Line | 212,550 | 237,410 | 236,096 | 227,645 | +7.1% |
Orange Line | 154,350 | 216,183 | 184,961 | 203,406 | +31.8% |
Blue Line | 55,600 | 50,515 | 57,273 | 63,225 | +13.7% |
Commuter rail | - | - | - | - | - |
MBTA Commuter Rail | 143,092 | 140,825 | 132,720 | 129,075 | -9.8% |
Bus & trolley | - | - | - | - | - |
MBTA bus & trolley | 382,600 | 355,588 | 374,040 | 387,815 | +1.4% |
Silver Line | 14,100 | 25,715 | 30,026 | 29,839 | +111.6% |
Ferry | - | - | - | - | - |
MBTA boat | 4,674 | 4,900 | 4,372 | 4,464 | -4.5% |
Paratransit and contracted bus | - | - | - | - | - |
The Ride | 8,740 | 9,823 | 9,376 | 9,336 | +6.8% |
Total | 1,172,106 | 1,241,631 | 1,240,441 | 1,327,489 | +10.7% |
Station | Passengers | Lines | |
1. | 25,100 | Red Line, Silver Line, Commuter Rail | |
2. | Downtown Crossing | 23,500 | Red Line, Orange Line, Silver Line |
3. | Harvard | 23,200 | Red Line |
4. | Park Street | 19,700 | Red Line, Green Line, Orange Line, Silver Line note: use Park St. Downtown Crossing connection to access Orange Line and Silver Line |
5. | Back Bay | 18,100 | Orange Line, Commuter Rail |
6. | 17,100 | Orange Line, Green Line, Commuter Rail | |
7. | Central | 16,500 | Red Line |
8. | Kendall/MIT | 15,400 | Red Line |
9. | Forest Hills | 15,200 | Orange Line, Commuter Rail |
10. | Copley | 14,000 | Green Line |
Funding
Fares and fare collection
The MBTA has various fare structures for its various types of service. The CharlieCard electronic farecard is accepted on the subway and bus systems, but not on commuter rail, ferry, or paratransit services. Passengers pay for subway and bus rides at faregates in station entrances or fareboxes in the front of vehicles; MBTA employees manually check tickets on the commuter rail and ferries.Since the 1980s, the MBTA has offered discounted monthly passes on all modes for the convenience of daily commuters and other frequent riders. One-day and seven-day passes, intended primarily for tourists, are available for buses, subway, and inner harbor ferries.
The MBTA has periodically raised fares to match inflation and keep the system financially solvent. A substantial increase effective July 2012 raised public ire including an "Occupy the MBTA" protest. A transportation funding law passed in 2013 limits MBTA fare increases to 7% every two years. A 5% fare increase effective July 1, 2014 was implemented.
Subway and bus
, all subway trips cost $2.40 for CharlieCard holders and $2.90 for CharlieTicket or cash payers. Local bus and trackless trolley fares are $1.70 for CharlieCard holders and $2.00 for others. All transfers between subway lines are free with all fare media. Passengers using CharlieCards can transfer free from a subway to a bus, and from a bus to a subway for the difference in price. CharlieTicket holders can transfer free between buses, but not between subway and bus, except between rapid transit and the Washington Street section of the Silver Line. Paying directly with cash is only available on buses, Green Line surface stops, and the Ashmont-Mattapan Line; a higher price is charged because it slows the process of boarding.The MBTA operates "Inner Express" and "Outer Express" buses to suburbs outside the subway system. Inner Express bus trips cost $3.65 with a CharlieCard or $4.75 without; Outer Express trips cost $5.25 with and $6.80 without. Free transfers are available to the subway and local buses with a CharlieCard, and to local buses with a CharlieTicket.
CharlieTickets are available from ticket vending machines in MBTA rapid transit stations. CharlieCards are not dispensed by the machines, but are available free of charge on request at most MBTA Customer Service booths in stations, or at the CharlieCard Store at Downtown Crossing station. As given out, the CharlieCards are "empty", and must have value added at an MBTA ticket machine before they can be used.
The fare system, including on-board and in-station fare vending machines, was purchased from German-based Scheidt and Bachmann, which developed the technology. The CharlieCards were developed by Gemalto and later by Giesecke & Devrient. In 2006 electronic fares replaced metal tokens, which had been used on and off on transit systems in Boston for over a century.
Until 2007, not all subway fares were identical – passengers were not charged for boarding outbound Green Line trains at surface stops, while double fares were charged for the outer ends of the Green Line D branch and the Red Line Braintree Branch. As part of a general fare hike effective January 1, 2007, the MBTA eliminated these inconsistent fares.
Subway and bus fare history
Commuter Rail
Commuter rail fares are on a zone-based system, with fares dependent on the distance from downtown. Rides between Zone 1A stations – South Station, Back Bay, most of the Fairmount Line, and eight other stations within several miles of downtown – cost $2.10, the same as a subway fare with a CharlieCard. Fares for other stations range from $5.75 from Zone 1 to $14.50 from Zone 10. All Massachusetts stations are Zone 8 or closer; only T.F. Green Airport and Wickford Junction in Rhode Island are Zone 9 and 10.Interzone fares – for trips that do not go to Zone 1A – are offered at a substantial discount to encourage riders to take the commuter rail for less common commuting patterns for which transit is not usually taken. Discounted monthly passes are available for all trips; 10-ride passes at full price are also available for trips to Zone 1A. All monthly passes include unlimited trips on the subway and local bus; some outer-zone monthlies also offer free use of express buses and ferries. A cash-on-board surcharge of $3.00 is added for trips originating from stations with fare vending machines.
MBTA boat
The Inner Harbor Ferry costs $3.25 per ride, and is grouped as a Zone 1A monthly commuter rail pass. Single rides cost $8.50 from Hull or Hingham to Boston, $17.00 from Hull or Hingham to Logan Airport, and $13.75 from Boston to Logan Airport.The Ride
Fares on The Ride, the MBTA's paratransit program, are structured differently from other modes. Passengers using The Ride must maintain an account with the MBTA in order to pay for service. Fares are $3.35for "ADA trips" originating within of fixed-route bus or subway service and booked in advance, and $5.60 for "premium trips" outside the mandated area.Discounted fares
Discounted fares as well as discounted monthly local bus and subway passes are available to seniors over 65, and passengers who are permanently disabled who utilize a special photo CharlieCard. Holders of these passes are also entitled to 50% off the Commuter Rail fares. Passengers who are legally blind ride for free on all MBTA services with a "Blind Access Card".Children under 12 ride for free with an adult. Military personnel, public servants, and certain government officials ride at no charge upon presentation of proper ID, or if dressed in official work uniforms.
Middle school and high school students receive the aforementioned discounts on fares. Student discounts require a "Student CharlieCard" or "S-Card" issued through the holder's school which is valid year-round. From the first day of school until June 31 of the next year, students can buy a 30-day LinkPass for $30 that allows for unlimited usage of the bus and rapid transit lines until the last day of that month. From July 1 to August 31, students can only load money on and pay as they would with a standard CharlieCard. Passes expire on August 31 and are reissued by the school the following school year.
College students are not eligible for reduced fares, but some colleges offer a "Semester Pass" program.
A special "Youth Pass" program was introduced in 2017, allowing young adults less than 25 years old who reside in participating cities or towns and are enrolled in specific low income programs to pay reduced fares.
Budget
Since the "forward funding" reform in 2000, the MBTA is funded primarily through 16% of the state sales tax excluding the meals tax, which is set at 6.25% statewide, and therefore equal to 1% of taxable non-meal purchases statewide. The authority is also funded by passenger fares and formula assessments of the cities and towns in its service area. Supplemental income is obtained from its paid parking lots, renting space to retail vendors in and around stations, rents from utility companies using MBTA rights of way, selling surplus land and movable property, advertising on vehicles and properties, and federal operating subsidies for special programs.A May 2019 report found the MBTA had a maintenance backlog of approximately $10 billion, which it hopes to clear by 2032 by increasing spending on capital projects.
The Capital Investment Program is a rolling 5-year plan which programs capital expenses. The draft FY2009-2014 CIP allocates $3,795M, including $879M in projects funded from non-MBTA state sources, and $299M in projects with one-time federal funding from the American Recovery and Reinvestment Act of 2009. Capital projects are paid for by federal grants, allocations from the general budget of the Commonwealth of Massachusetts and MBTA bonds. The FY2014 budget includes $1.422 billion for operating expenses and $443.8M in debt and lease payments.
The FY2010 budget was supplemented by $160 million in sales tax revenue when the statewide rate was raised from 5% to 6.25%, to avoid service cuts or a fare increase in a year when deferred debt payments were coming due.
Capital improvements and planning process
The Boston Metropolitan Planning Organization is responsible for overall regional surface transportation planning. As required by federal law for projects to be eligible for federal funding, the MPO maintains a fiscally constrained 20+ year Regional Transportation Plan for surface transportation expansion, the current edition of which is called Journey to 2030. The required 4-year MPO plan is called the Transportation Improvement Plan.The MBTA maintains its own 25-year capital planning document, called the Program for Mass Transportation, which is fiscally unconstrained. The agency's 4-year plan is called the Capital Improvement Plan; it is the primary mechanism by which money is actually allocated to capital projects. Major capital spending projects must be approved by the MBTA Board, and except for unexpected needs, are usually included in the initial CIP.
In addition to federal funds programmed through the Boston MPO, and MBTA capital funds derived from fares, sales tax, municipal assessments, and other minor internal sources, the T receives funding from the Commonwealth of Massachusetts for certain projects. The state may fund items in the State Implementation Plan – such as the Big Dig mitigation projects – which is the plan required under the Clean Air Act to reduce air pollution.
In 2005, the administration of then-governor Mitt Romney announced a long range transportation plan that emphasized repair and maintenance over expansion.
Due to the financial constraints on the MBTA budget, it is expected that funds for all further expansion projects will be funded with money outside the MBTA's budget. A state transportation bond bill is being used to fund the Green Line Extension to Somerville and Medford, and planning South Coast Rail commuter rail service to Fall River and New Bedford.
Projects underway and future plans
Blue Line
There is a proposal to extend the Blue Line northward to Lynn, with two potential extension routes having been identified. One proposed path would run through marshland alongside the existing Newburyport/Rockport commuter rail line, while the other would extend the line along the remainder of the BRB&L right of way.In addition, the MBTA has committed to designing an extension of the line's southern terminus westward to Charles/MGH, where it would connect with the Red Line. This was one of the mitigation measures the Commonwealth of Massachusetts agreed to offset increased automobile emissions from the Big Dig, but it was later replaced in this agreement by other projects.
Green Line
To settle a lawsuit with the Conservation Law Foundation to mitigate increased automobile emissions from the Big Dig, the Commonwealth of Massachusetts agreed to extend the Green Line north to Somerville and Medford, two suburbs currently under-served by the MBTA. This plan starts at a relocated Lechmere station, and terminates at College Avenue in Medford and Union Square in Somerville. The original settlement-imposed deadline was December 31, 2014. There will be an expected daily ridership of 8,420. After projected costs increased to $3 billion, the project was halted in 2015 and scaled back. The revised project broke ground in June 2018 and is expected to serve passengers beginning in late 2021.Another mitigation project in the initial settlement was restoration of service on the E branch between Heath Street and Arborway/Forest Hills. A revised settlement agreement resulted in the substitution of other projects with similar air quality benefits. The state Executive Office of Transportation promised to consider other transit enhancements in the Arborway corridor.
Orange and Red Lines
In October 2013, MassDOT announced plans for a $1.3 billion subway car order for the Orange and Red Lines, which would replace and expand the existing car fleets and add more frequent service. The MassDOT Board awarded a $566.6 million contract to a China based manufacturer CNR to build 404 replacement railcars for the Orange Line and Red Line. The other bidders were Bombardier Transportation, Kawasaki Heavy Industries and Hyundai Rotem. CNR began building the cars at a new manufacturing plant in Springfield, Massachusetts, with initial deliveries expected in 2018 and all cars in service by 2023. The Board forwent federal funding to allow the contract to specify the cars be built in Massachusetts, in order to create a local railcar manufacturing industry. In addition to the new rolling stock, the $1.3 billion allocated for the project will pay for testing, signal improvements and expanded maintenance facilities, as well as other related expenses. Sixty percent of the car's components are sourced from the United States. Replacement of the signal systems, which will increase reliability and allow more frequent trains, is expected to be complete by 2022, with a total cost of $218 million for both lines.Urban Ring
The Urban Ring is a project of the Massachusetts Bay Transportation Authority and the Commonwealth of Massachusetts, to develop new public transportation routes that would provide improved circumferential connections among many existing transit lines that project radially from downtown Boston, allowing easier travel between locations outside of downtown. The project corridor passes through various neighborhoods of Boston, Chelsea, Everett, Malden, Medford, Somerville, Cambridge, and Brookline. The capital cost for this version of the plan is estimated at $2.2 billion, with a projected daily ridership of 170,000. 53% of the route is either in a bus-only lane, dedicated busway, or tunnel. The Urban Ring would have a higher collective ridership than the Orange Line, Blue Line, or the entire commuter rail system.Commuter rail
There are several proposed extensions to current commuter rail lines. An extension of the Stoughton Line known as South Coast Rail is proposed to serve Fall River, and New Bedford. Critics argue that building the extension does not make economic sense.A extension of the Providence Line past Providence to T. F. Green Airport and Wickford Junction in Rhode Island opened in 2012. The Rhode Island Department of Transportation is also studying the feasibility of serving existing Amtrak stations in Kingston and Westerly as well as constructing new stations in Cranston, East Greenwich, and West Davisville. Federal funding has also been provided for preliminary planning of a new station in Pawtucket.
In September 2009, CSX Transportation and the Commonwealth of Massachusetts finalized a $100 million agreement to purchase CSX's Framingham to Worcester tracks, as well as some other track, to improve service on the Framingham/Worcester Line. A liability issue that had held up the agreement was resolved. There is also a project underway to upgrade the Fitchburg Line to have cab signaling and to construct a second track along a run near Acton which is shared with freight traffic, so that the Fitchburg to Boston trip will be able to take only about an hour. Completion is expected in December 2015.
The state of New Hampshire created the New Hampshire Rail Transit Authority and allocated money to build platforms at Nashua and Manchester. An article in The Eagle-Tribune claimed that Massachusetts was negotiating to buy property which has the potential to extend the Haverhill Line to Plaistow, New Hampshire.
Massachusetts agreed in 2005 to make improvements on the Fairmount Line part of its legally binding commitment to mitigate increased air pollution from the Big Dig. These improvements, including four new infill stations, were supposed to be complete by December 31, 2011. The total cost of the project was estimated at $79.4 million, and it was expected to divert 220 daily trips from automobiles to transit., three of the new stations were open; the fourth station has been delayed by community opposition. In 2014, the MBTA announce it would purchase Diesel Multiple Unit self-propelled rail cars for the Fairmount Line with eventual expansion to five other lines to be known as the Indigo Line. The planned DMU procurement was canceled in 2015.
No direct rail connection exists between North Station and South Station, effectively splitting the commuter rail network into separate pieces. A North–South Rail Link has been proposed to unite the two halves of the commuter rail system, to allow more convenient and efficient through-routed service. However, because of high cost, Massachusetts withdrew its sponsorship of the proposal in 2006, in communications with the United States Department of Transportation. Advocacy groups continue to press for the project as a better alternative than expanding South Station, which would also be costly but provide fewer overall improvements in service.
Management and administration
In 2015, Massachusetts Governor Charlie Baker signed new legislation creating a financial control board to oversee the MBTA. The Fiscal and Management Control Board started meeting in July 2015 and is charged with bringing financial stability to the agency. The Fiscal and Management Control Board reports to Massachusetts Secretary of Transportation Stephanie Pollack. Three of the five members of the MBTA Fiscal and Management Control Board are also members of the Massachusetts Department of Transportation. The Massachusetts Secretary of Transportation leads the executive management team of MassDOT in addition to serving in the Governor's Cabinet. The MBTA's executive management team is led by its General Manager, who is currently also serving as the MassDOT Rail and Transit Administrator, overseeing all public transit in the state.The MBTA Advisory Board represents the cities and towns in the MBTA service district. The municipalities are assessed a total of $143M annually. In return, the Advisory Board has veto power over the MBTA operating and capital budgets, including the power to reduce the overall amount.
Key people
MassDOT Board of Directors
- Massachusetts Secretary of Transportation Stephanie Pollack
- Dominic Blue
- Ruth Bonsignore
- Lisa Calise
- Russell Gittlen
- Dean Mazzarella
- Robert Moylan, Jr.
- Steve Poftak
- Joseph Sullivan
- Betsy Taylor
- Monica Tibbits-Nutt
MBTA Fiscal and Management Control Board
- Joseph Aiello
- Monica Tibbits-Nutt
- Brian Lang
- Brian Shortsleeve
- Chrystal Kornegay
Other key people
- MBTA General Manager Steve Poftak
- MBTA Deputy General Manager Jeff Gonneville
- MBTA Acting Chief Financial Officer Michael Abramo
- MBTA Chief Operating Officer Todd Johnson
- MBTA Blue Line Deputy Director
- MBTA Green Line Deputy Director Ted Timmons
- MBTA Orange Line Deputy Director
- MBTA Red Line Deputy Director
- MBTA Bus & Silver Line Deputy Director Karen Burns
- Customer Service Director Carla Howze
- Director of Communications and Coordination Darrin M. McAuliffe
General managers
- Edward Dana: 1947–1959
- Willis B. Downey : 1959–1960
- Thomas McLernon: 1960–1965
- Rush B. Lincoln Jr.: 1965–1967
- Leo J. Cusick: 1967–1970
- Joseph C. Kelly : 1970
- Joseph C. Kelly: 1970–1975
- Bob Kiley: 1975–1979
- Robert Foster: 1979–1980
- Barry Locke: 1980–1981
- James O'Leary: 1981–1989
- Thomas P. Glynn: 1989–1991
- John J. Haley Jr.: 1991–1995
- Patrick Moynihan: 1995–1997
- Robert H. Prince: 1997–2001
- Michael H. Mulhern: 2002–2005
- Daniel Grabauskas: 2005–2009
- Richard A. Davey: 2010–2011
- Jonathan Davis : 2011–2012
- Beverly A. Scott: 2012–2015
- Frank DePaola : 2015–2016
- Brian Shortsleeve : 2016–2017
- Steve Poftak : 2017–2017
- Luis Manuel Ramírez: 2017–2018
- Jeff Gonneville : 2018–2018
- Steve Poftak: 2019–present
Major facilities and offices
- Albany Street, South End
- Cabot Garage, South Boston
- Arborway, Jamaica Plain
- Bartlett Garage, Roxbury
- Charlestown/Bennett Garage
- Everett Shops
- Fellsway Garage, Medford
- Lynn Garage
- North Cambridge
- Southampton Street Garage, South Boston
- Quincy Garage
- Blue Line: Orient Heights Yard
- Green Line: Riverside Yard and Reservoir Yard
- Orange Line: Wellington Yard
- Red Line: Cabot Yard
- 10 Park Plaza, Boston
- 45 High Street, Boston
- MBTA Transit Police: 240 Southampton Street, Boston
- Senior & Transportation Access Pass / Disability Office: CharlieCard Store, Downtown Crossing Station concourse, Boston
- Customer Service Window: CharlieCard Store, Downtown Crossing Station concourse, Boston
- Revenue Operations: 32 Alford Street, Charlestown
Employees and unions
Structurally, the employees of the MBTA function as part of a handful of trade unions. The largest union of the MBTA is the Carmen's Union, representing bus and subway operators. This includes full and part-time bus drivers, motorpersons and streetcar motorpersons, full and part-time train attendants, and Customer Service Agents. Further unions include the Machinists Union, Local 264; Electrical Workers Union, Local 717; the Welder's Union, Local 651; the Executive Union; the Office and Professional Employees International Union, Local 453; the Professional and Technical Engineers Union, Local 105; and the Office and Professional Employees Union, Local 6.
Within the authority, employees are ranked according to seniority. This is categorized by an employee's five or six-digit badge number, though some of the longest serving employees still have only three or four-digits. An employee's badge number indicates the relative length of employment with the MBTA; badges are issued in sequential order. The rating structure determines many different things, including the rank in which perks are to be offered to employee, such as: When offering the choice for quarter-annual route assignments, overtime offerings, and even the rank to transfer new hires from part-time roles to a full-time role.
Law enforcement and security
The MBTA maintains its own police force which actively patrols all areas and vehicles used by the Authority. MBTA Police conduct routine vehicle patrol, routine foot patrol, incident investigations, and specialized patrol with K-9 dogs, and other specialized methods of explosive and narcotics detection.The MBTA also maintains several closed-circuit television facilities located throughout its service area. The cameras monitor various areas including trains stations, and MBTA vehicles throughout the system on a 24-hour basis. MBTA phone numbers pasted onto the front of the fare gates can place customers having a problem directly into contact with one of these operations centers.
Criticism
Fares and financial issues
Ahead of the MBTA's 2009 restructuring with the Massachusetts Department of Transportation, the MBTA had a total debenture of over US$8 billion. As a direct result, MBTA fares and parking fees have increased significantly. On July 1, 2012, MBTA fares went up as well as multiple service cuts, another fare hike took place on July 1, 2016.On the last day of Winter in 2015, seventy two Massachusetts legislators participated in the "GovOnTheT" an exercise where Steve Kropper and Michele Rapp challenged officials with a one-hour commute or less, to take a train, subway, bus or ferry to the State House in Boston.
Rail vs. bus service
When the Orange Line was rebuilt in the 1980s, it was rerouted from deteriorating elevated railway structures to instead follow existing rail right-of-way, to greatly reduce land acquisition and construction costs. This had the side effect of changing its course away from the lower income areas of Everett, Chelsea, and Roxbury, toward the more affluent towns of Malden and Medford, as well as sections of the Jamaica Plain neighborhood.To mitigate this, the MBTA set up a new bus line served by articulated buses equipped with specialized dispatching equipment, and a few of the features of a bus rapid transit route. The MBTA named this new service the Silver Line, and classified it as though it were a high-capacity rail transit service, though it fails to meet full service standards for a BRT route. The Silver Line service has been criticized in many respects, most notably for its slow speed and the fact that it operates in mixed street traffic, subject to gridlock and collisions, earning it the nickname "Silver Lie" among some critics. A rating from the Institute for Transportation and Development Policy determined that the MBTA Silver Line was best classified as "Not BRT" after local decision makers gradually decided to do away with most BRT-specific features.
Radial vs. circumferential routes
Transportation advocates in Boston have complained that rail transit riders cannot travel from one outlying area to another without first traveling to the downtown hub stations, changing lines, and traveling outbound again. Some of the radial transit lines, notably the Green Line, are so overcrowded that service is very slow, unreliable, and capacity-limited because of rush-hour "crush loads". There are several crosstown bus lines, such as the #1, #66, CT2, and CT3 routes, but they are slow, unreliable, and subject to bus bunching because they must operate in mixed street traffic.The MBTA Urban Ring Project would provide faster and more reliable circumferential service, and relieve overcrowding in the downtown hub stations. This issue has been studied as early as 1972, in the Boston Transportation Planning Review, and has been in detailed planning stages since before 2000, but has only been partially implemented due to lack of funding. A similar problem also occurs in the Washington Metro system, where customers cannot travel between suburbs on the same side of Washington without going through downtown, and Chicago's Metra and CTA systems, where all lines lead into and out of the central business district, rather than around it.
In popular culture
In 1951, the growing subway network was the setting of "A Subway Named Mobius", a science fiction short story written by the American astronomer Armin Joseph Deutsch. The tale described a Boston subway train which accidentally became a "phantom" by becoming lost in the fourth dimension, analogous to a topological Mobius strip. In 2001, a half-century later, the narrative was awarded a Retro Hugo Award for Best Short Story at the World Science Fiction Convention.In 1959, the satirical song "M.T.A." was a hit single, as performed by the folksingers the Kingston Trio. It tells the absurd story of a passenger named Charlie, who cannot pay a newly imposed 5-cent exit fare, and thus remains trapped in the subway system. The song was still well known in 2006, when the MBTA named its new electronic farecards the "CharlieCard" and "CharlieTicket".