Plans are underway to extend the Somerville Community Path to downtown Boston, which would create a much larger continuous bikeway accessible from the Minuteman. At the Bedford end, the Minuteman Bikeway connects with the Narrow Gauge Rail Trail and the Reformatory Branch Rail Trail.
History
The path comprising the current Minuteman Bikeway has a long history. The trail closely approximates the route that Paul Revere took on his famous ride in 1775, which heralded the beginning of the American Revolution. Along the way to becoming a railroad, the path's right-of-way was laid out east of Lexington in 1846 by the Lexington and West Cambridge Railroad and west of Lexington in 1873 by the Middlesex Central Railroad. Railbanking of the line was first proposed in 1974, three years before passenger rail service was discontinued, and a full seven years before rail service was discontinued altogether. In 1991, the final plan for the conversion was approved, and construction started on the original section of the bikeway. The path was dedicated in 1992 and completed the following year. In 1998 the bikeway was extended from East Arlington to Alewife station. In 2002 it was repaved in Arlington and in 2004 the Bedford Depot Park Enhancement Project was completed at its western terminus. In 2008, the bikeway was the fifth inductee into the national Rail-Trail Hall of Fame by the Rails-to-Trails Conservancy. The property is currently owned by the Massachusetts Bay Transportation Authority and leased to the municipalities through which it passes on an interim basis. The MBTA at one point planned to use this right-of-way to extend the Red Line to Arlington Center and Arlington Heights. Beginning in Spring 2015, the crossing of the path through Arlington Center is expected to be rebuilt to be less discontinuous.
New connections under contemplation include one from Lexington to the Battle Road Trail and one to the Charles River bike path via Fresh Pond Reservation and the abandoned Watertown Branch Railroad. A portion of the latter path, at the Watertown end, has been completed and design work on the remaining section to Cambridge is expected to be finished in 2016. In April 2014, state officials announced that the Somerville Community Path would be extended alongside the Green Line Extension, creating a continuous 4.5 mile route from the Minuteman Bikeway to Boston’s Charles River Bike Path. Officials had contemplated abandoning the path portion of the GLX in order to save costs, but after hiring new management, a contractor agreed to the parallel path while still cutting costs.