Ontario Highway 407


King's Highway 407 is a tolled 400-series highway in the Canadian province of Ontario. Comprising a privately leased segment as well as a publicly owned segment, the route spans the entire Greater Toronto Area around the city of Toronto, travelling through the suburbs of Burlington, Oakville, Mississauga, Brampton, Vaughan, Markham, Pickering, Whitby, and Oshawa before ending in Clarington, north of Orono. At 151.4 km long, this is the fourth longest freeway in Ontario's 400 series network, after Highways 417, 400, and 401. The segment between Burlington and Brougham in Pickering is leased to and operated by the 407 ETR Concession Company Limited and is officially known as the 407 Express Toll Route. It begins at the junction of the Queen Elizabeth Way and Highway 403 in Burlington, and travels across the GTA to Brock Road in Pickering. East of Brock Road, the tollway continues east as Highway 407, a toll route operated by the provincial government, for to Highway 35/115 in Clarington. The route interchanges with nine freeways: the QEW, Highway 403, Highway 401, Highway 410, Highway 427, Highway 400, Highway 404, Highway 412, and Highway 418. Highway 407 is an electronically operated toll highway; there are no toll booths along the length of the route. Distances are calculated automatically using transponders or licence plates, which are scanned at entrance and exit points.
Highway 407 was planned in the late 1950s as a freeway bypassing the Toronto segment of Highway 401, the busiest highway in the world.
However, construction did not begin until 1987. During the early 1990s, the provincial government proposed tolling the highway to alleviate a revenue shortfall. The central sections of Highway 407 opened in 1997, and the remaining sections were built quickly over the following four years, with the final segment opening in mid-2001.
Despite being included in the 400-series network, the Highway 407 ETR section is not considered part of the provincial highway network due to it now being privately operated.
The segment is operated privately under a 99-year lease agreement with the provincial government, which was sold in 1999 for about C$3.1 billion to a consortium of Canadian and Spanish investors operating under the name 407 International Inc.
The privatization of the Highway 407 ETR section has been the source of significant criticism, especially regarding the increases in tolls, plate denial, and false charges. In addition, the safety of segments constructed following the sale of the freeway has been called into question.
Phase 1 of a provincially-owned and tolled extension of the route, known solely as Highway 407, opened to traffic from Brock Road in Pickering to Harmony Road in Oshawa on June 20, 2016. Included as part of this extension was construction of a tolled north-south link between Highways 401 and 407 known as Highway 412. Phase 2 later extended the provincially owned portion of Highway 407 to Highway 35 / Highway 115 in Clarington. This construction was completed in two stages, with Phase 2A opening on January 2, 2018 as a extension to Taunton Road, and Phase 2B opening on December 9, 2019 as a extension to Highway 35 and Highway 115. Included as part of this extension was construction of another tolled north-south link between Highways 401 and 407 known as Highway 418.
Unusually, the highway does not reach or pass through any of its three control cities: Hamilton, Toronto, or Peterborough. Hamilton is accessed by following either the QEW or Highway 403 beyond its western terminus in Burlington. Toronto proper is bypassed, but is used as a control city due to the similar sizes of the suburban municipalities the highway passes through in Halton and Durham Regions. In the east, Peterborough is reached by briefly following the Highway 35/Highway 115 concurrency north, and then continuing northeast on Highway 115 alone.

Route description

Highway 407 is a controlled-access highway that encircles the GTA, passing through Burlington, Oakville, Mississauga, Brampton, Vaughan, Markham, Pickering, Whitby, Oshawa, and Clarington, as well as travelling immediately north of Toronto.
Although the general public felt that tolling made the highway a luxury rather than its original purpose of relieving traffic on Highway 401, Highway 407 ETR has had average daily trip counts of over 350,000 vehicles in June 2014.
The 407 ETR is contractually responsible for maintaining high traffic levels as justification for increasing tolls, but conduct their own traffic studies. Despite increased usage, parallel roads that Highway 407 was intended to supplement continue to grow congested, forcing the MTO to revisit costly widening projects of Highway 401 and the QEW.
Highway 407 has been designed with aesthetics and environmental concerns in mind by featuring landscaped embankments, 79 storm drainage ponds, as well as a curb and gutter system.
Unlike most other Ontario highways, it features concrete pavement as opposed to top-coated asphalt. Because of this, the high-mast lighting along the urban portions of the route feature fewer luminaires than asphalt-surfaced freeways.

Burlington–Vaughan

Highway 407 begins in Burlington within Halton Region at the Freeman Interchange between Highway 403 and the QEW, from which it branches off northward. The six-lane route passes under Brant Street, Upper Middle Road, and Guelph Line before it interchanges with Dundas Street. It briefly enters greenspace as it curves gently to the northeast, avoiding the nearby Niagara Escarpment. The route is crossed by Walkers Line, east of which residential subdivisions line the south side and green space lines the north. At an interchange with Appleby Line, the highway straightens and travels parallel to Dundas Street before passing over Bronte Creek and under the Canadian National Railway's Halwest Subdivision.
East of Bronte Creek, Highway 407 enters an agricultural area, interspersed with woodlots. It enters Oakville at the Tremaine Road overpass, then gradually swerves to the north as it encounters an interchange with Bronte Road. The route crosses Sixteen Mile Creek just north of Glenarchy Conservation Area, then travels parallel to the creek for several kilometres. It swerves north after an interchange with Neyagawa Boulevard, near the hamlet of Glenarchy. After diverging from the creek, it curves northeast, parallel to and north of Burnhamthorpe Road, where it interchanges with Trafalgar Road. Highway 407 then encounters Highway 403 at a large interchange where it curves sharply to the northwest; Highway 403, meanwhile, curves from the southeast to the northeast.
Now travelling parallel to and immediately west of the Halton–Peel regional boundary and Oakville–Mississauga city boundary, the six-lane Highway 407 progresses northwest alongside a power transmission corridor, with residential areas to the east and farmland to the west. The route continues as such northwest to Highway 401, passing under Lower Base Line and Eglinton Avenue and interchanging at Britannia Road and Derry Road before crossing the Canadian Pacific Railway's Galt Subdivision. At Highway 401, the route makes a sharp curve to the northeast, while interconnecting ramps weave across both freeways over several kilometres. It enters Peel Region at the Winston Churchill Boulevard overpass and follows another power transmission corridor just north of the Brampton–Mississauga boundary.
, facing southwest; this sections of Highway 407 parallels the boundary between Mississauga and Milton.
Highway 407 swerves east and encounters an interchange with Mississauga Road just prior to crossing the Credit River and the Orangeville Brampton Railway, after which it enters the urban GTA. After passing interchanges with Mavis Road and Hurontario Street, the route encounters Highway 410 at another sprawling interchange located over Etobicoke Creek. Over the next, the route nudges northward into Brampton, interchanging with Dixie Road and Bramalea Road and meeting another CN railway line, before crossing Steeles Avenue. Highway 407 curves back to the northeast as it interchanges with Airport Road and passes beneath another CN line, before encountering the final interchange in Peel Region at Goreway Drive. It crosses the West Humber River and former Highway 50 in Claireville Conservation Area before curving east into Vaughan, in York Region.

Vaughan–Pickering

Immediately after crossing into Vaughan, Highway 407 encounters the first of three large interchanges with other 400-series highways in York Region. The Highway 427 interchange is a four-level partial stack located just north of Steeles Avenue in Vaughan and adjacent to the 407 ETR Concession Company offices. The interchange features weaved ramps which connect to former Highway 27, located just to the east. The route continues eastward, parallel to and between Steeles Avenue and Highway 7. It dives through the Humber River valley alongside a CN line and along the northern border of Thackeray Conservation Lands, passing beneath a CP line. After an interchange with Pine Valley Drive, the route becomes sandwiched between the industrial lands of the Pine Valley Business Park and the Emery Creek Corporate Park. A partial interchange with Weston Road lies just west of the large four-level stack interchange with Highway 400, the only of its kind in Ontario. An interchange with Jane Street is interwoven into the east side of the Highway 400 interchange, below which pass the tunnels of the Line 1 Yonge–University subway, with the Highway 407 station located to the south.
Still travelling alongside a power transmission corridor, Highway 407 crosses a complex rail wye which provides access to the CN freight yards to the north. After interchanging with Keele Street, the route gently curves northward, passing under the CN Newmarket Subdivision, which carries the GO Transit Barrie Line and crossing the Don River. It curves back eastward as it interchanges with Dufferin Street, travelling adjacent to and south of Highway 7. After interchanges with Bathurst Street and Yonge Street, Highway 407 crosses the CN Bala Subdivision, which carries the GO Transit Richmond Hill Line. After an interchange with Bayview Avenue, the highway swerves south and enters Markham. A partial interchange with Leslie Street precedes the third and final large freeway–freeway junction at Highway 404.
East of Highway 404, the freeway travels generally parallel to the Rouge River. It interchanges with Woodbine Avenue and Warden Avenue, east of which the route travels alongside a CN line and crosses the GO Transit Unionville Line. Highway 407 continues straight eastward into a residential area, interchanging with Kennedy Road, McCowan Road, and Markham Road, where it crosses the river and diverges from both the CN line and power transmission corridor. The route interchanges with Ninth Line and Donald Cousens Parkway before exiting the urban GTA and curving northeast over a CP line and into Rouge Park.
Until the opening of the first phase of 407E in June 2016, the final interchange along Highway 407 was with York–Durham Line, the boundary between York Region and Durham Region as well as Markham and Pickering. The route curves eastward, then crosses West Duffins Creek north of the community of Whitevale and south of the future Pickering Airport and planned community of Seaton. Sandwiched between farm fields, the highway is crossed by North Road, where a future interchange is planned,
and Sideline 24. Highway 407 ended just south of Brougham at a signalized intersection with Brock Road until the end of 2015, where it continued eastward as Highway 7. A new interchange has been built in conjunction with the provincially-maintained and tolled extension, Highway 407E, which was constructed east of this point, and ties in with the current freeway, eliminating the at-grade intersection.

Pickering–Clarington

Immediately east of Brock Road, drivers enter the provincially-operated portion of the highway which is referred to as Highway 407. This route runs parallel to Highway 7, Durham Regional Road 3, and Durham Regional Road 4 through the North of Pickering, Whitby, Oshawa, and Clarington, until its eastern terminus at Highway 35 and Highway 115.
Major interchanges of this route include Highway 412 and Highway 418, which are both spurs connecting Highway 407 with Highway 401 in Whitby and Clarington. Both Phase 1 of the 407 East Extension, as far as Harmony Road in Oshawa and Highway 412 opened to traffic on June 20, 2016. Phase 2A of the 407 East Extension, as far as Taunton Road in Clarington opened to traffic on January 2, 2018. Both Phase 2B of the 407 East Extension, as far as Highway 35 and Highway 115 in Clarington and Highway 418 opened to traffic on December 9, 2019.

Tolls

Unlike most other toll highways, Highway 407 features no toll booths. Rather, a system of cameras and transponders allows for automatic toll collection. It is one of the earliest examples of a highway to exclusively use open road tolling. Highway 407 is otherwise designed as a normal freeway; interchanges connect directly to crossroads. A radio antenna detects when a vehicle with a transponder has entered and exited the highway, calculating the toll rate. For vehicles without a transponder, an automatic license plate recognition system is used. In both cases, monthly statements are mailed to users. The automatic plate recognition system is linked to several provincial and U.S. state motor vehicle registries.
Toll rates are set by both the 407 ETR and the Province of Ontario for each of the respective sections they own. However, the province set out limitations in the 407 ETR lease contract for maintaining traffic volumes to justify toll rates. Despite this, rates have increased annually against the requests of the provincial government, resulting in several court battles and the general public regarding the route as a luxury.

Plate denial

As part of the contractual agreement with the government, the MTO is required to deny licence plate validation stickers to drivers who have an outstanding 407 ETR bill over 125 days past due.
This process was temporarily halted in February 2000 due to numerous false billing claims. Following a judicial decision by the Ontario Divisional Court on November 7, 2005, the Ontario Registrar of Motor Vehicles was ordered to begin denying the validation or issue of Canadian license plates and vehicle permits for 407 ETR users who have failed to pay owed fees. On November 22, 2005, the MTO announced that it would appeal the decision but would begin to deny plates until the appeal was decided. On February 24, 2006, the Ontario Court of Appeals denied the government leave to appeal the 2005 decision. As a result, plate denial remains in place.

Rates

The rate rose for tolls in 2019 and again in 2020.
On December 31, 2019, it was announced that the highway would have seasonal toll rates.
As of February 1, 2020, the base tolls for driving on the 407 ETR are as follows:
To compensate for opening delays, tolling of both the Highway 407 extension and Highway 412 did not commence until February 2017.
As of June 1, 2019, the following tolls applies for motorists utilizing these tollways. The rate stayed the same in 2018 and rose in 2019. These tolls also apply to Highway 418:

Lease Ownership

As of August 2019, ownership of the 407 ETR Concession Company Limited, the operator/manager of the highway, is as follows:
The concession has been called a "cash cow" for SNC-Lavalin, while local media has commented on the "huge jump" or "soar" in profits.
YearRevenue
Net Income
Annual Net income
increase
Interest expense
Dividends paid
Cumulative
Dividends paid
Long-term
debt outstanding
Approx Average
interest rate
on long-term debt
Net long-term
debt added
Dividend payout ratioEBIT
Times interest earned
Expenses Operating Expenses
2019$1,505.3$575.77%$$1,050$$8,913%$182%$301.7196.2
2018$1,390.3$539.014%$390$920$6,927$8,3684.6%$170%$287179.7
2017$1,267.7$470.126%$372$845$5,607$8,2984.6%$558180%$269.7163.9
2016$1,101.5$372.920%$345$790$5,162$7,7354.6%$570.8211%$254.6149.7
2015$980$311.239%$331$750$4,372$7,1334.7%$336.7241%$248.2162.2
2014$887$222.9$320.3$730$3,622$6,7994.9%$552327%$230.3151.9
2013$801$248.7$296.3$690$2,892$6,2044.9%$460277%$199136.4
2012$734$174.4$294$600$2,202$5,7735.2%$390344%$186.4125.8
2011$675$128.3$281.6$460$1,602$5,3655.3%$41.7358%$179.6121.2
2010$624$77$283$300$1,142$5,2556.0%$317389%----
2009$560$58.2$274.5$190$842$4,1036.2%$92326%----
2008$546.5$119$257$135$652$4,6815.5%$67113%----
2007$519$60.3$266$120$517$4,5946.5%$113199%----
2006$455.7$48.5$250.4$145$397$3,5886.4%$98276%----
2005$420.2$234.8$85$251.7$4,1895.5%-----
2004$383$235.6$62.9$166.7$4,2615.7%$236-----
2003$343.3$233.7$55.3$103.8$3,9226.2%$72-----
2002$311$167.8$48.5$3,550-----
2001$244$161.4$0$3,663$656.8-----
2000$189.5$128$3,355$450-----
1999$112$70$2,889$2,811-----
Total$14,050$2,883$5,637$7,977N/AN/AN/A$8,393%----

Market Valuation

Initial construction cost was pegged at 1.5 billion. The toll concession was sold for $3.1 billion.
In 1998, MPP E. J. Douglas Rollins claimed that the province had as much as $104 billion invested in the highway.
On October 5, 2010, the Canadian Pension Plan announced that an agreement was reached with the owners of the roadway to purchase 10% stake for $894 million.
This implied a value of close to $9 billion for the highway in its then-current state.
In April 2019, SNC-Lavalin Group Inc. announced the sale of 10.01% of the highway to the Ontario Municipal Employees Retirement System for $3.25 billion, implying a $32.5 billion valuation of the entire highway. After the sale, the company would own only 6.76% of the highway. In August 2019, a court cleared the sale of the 10% SNC stake to CPPIB instead of OMERS.

Controversies

Highway 407 ETR has been the subject of several controversies over its two decades of existence.

Privatization

The privatization of the road, the toll rate increases, and the 99-year lease period have been widely criticized.
Cost-savings measures and the ensuing safety concerns resulted in an independent Ontario Provincial Police investigation shortly before the opening of the freeway.
An expert panel of engineers, assembled by the Professional Engineers Ontario, released a report outlining concerns regarding the decreased loop ramp radii and a lack of protective guardrail at sharp curves, in addition to the lack of a concrete median barrier to separate the opposite directions of travel. However, it was also argued that the large grass median was sufficient to prevent cross-over collisions, given that Highway 410 has a similar median.

Toll Rate Approval

The Ontario provincial government has quarreled with 407 ETR over toll rates and customer service, but is largely tied down by the lease contract. On February 2, 2004, the government delivered notice to 407 ETR that they are considered to be in default of their contract because of 407 ETR's decision to raise toll rates without first obtaining provincial clearance. The court's initial decision sided with 407 ETR: on July 10, 2004, an independent arbitrator affirmed that 407 ETR has the ability to raise toll rates without first consulting the government. The government filed an appeal of this decision but was overruled by an Ontario Superior Court decision released on January 6, 2005; however, a subsequent ruling by the Ontario Court of Appeal on June 13, 2005 granted the government permission to appeal the decision.
The government also faced off against 407 ETR in court regarding plate denial around this time.
The public has accused the 407 ETR of predatory billing practices, including false billing and continued plate denial after bankruptcy. In 2016, after a 4-year legal battle, consumers won an $8 million class action lawsuit.

Comparative Toll Rates

The 407 ETR and Cobequid Pass Toll Highway are the only two toll highways in Canada.
Some other toll rates are:

Planning and initial construction

Although construction of Highway 407 did not begin until 1987, planning for the bypass of Highway 401 north of Toronto began in the late-1950s. Concepts for the new "dual highway" first appeared in the 1959 plan for Metropolitan Toronto.
Land adjacent to several hydro corridors was acquired for the future freeway in the 1960s, but sat vacant as the Ontario Department of Highway opted instead to widen Highway 401 to a twelve-lane collector-express system. The Highway 401 expansion project was considered a success and construction of Highway 407 was shelved for almost thirty years. The plan was revisited in the mid-1980s as congestion in Toronto pushed roads beyond capacity. In 1986, Premier David Peterson was given a helicopter tour of the city during rush-hour; construction of the highway was announced soon thereafter, and began in 1987.
The Ontario government's normal process for highway construction was not possible given the financial constraints of the recession of the early 1990s. The Peterson government sought out private sector partnerships and acquired innovative electronic tolling technology. Two firms bid on the project, with the Canadian Highways International Corporation being selected as the operator of the highway.
Financing for the highway was to be paid by user tolls lasting 35 years, after which it would return to the provincial system as a toll-free 400-series highway.
The succeeding government of Bob Rae announced on March 31, 1995, that the corridor reserved for Highway 403 between Burlington and Oakville would instead be built as a western extension of Highway 407.
The first segment of Highway 407, between Highway 410 and Highway 404, was ceremoniously opened to traffic on June 7, 1997; no tolls were charged for a month to allow motorists to test-drive the freeway. Several other sections were well underway at this point. A extension westwards to Highway 401 was opened just months later on December 13, 1997.
That section was connected with Highway 403 to the south on September 4, 1998,
with a temporary two lane ramp connecting to Trafalgar Road.
In the east, an extension to Markham Road, at what was then the southern terminus of Highway 48, was completed in early 1998. However, due to the protest of local residents and officials concerning traffic spill-off, the freeway was opened only as far as McCowan Road on February 18.
The short segment from McCowan Road to Markham Road remained closed for over a year, as locals feared the funneling of traffic onto Main Street, which is named Markham Road south of the freeway. Both Markham and McCowan were widened to four lanes between Highway 407 and Steeles Avenue at this time. This did not alleviate concerns, but on June 24, 1999, the extension opened to continued protest regardless.

Privatization and original extensions

When Mike Harris was elected Premier in 1995 on his platform of the Common Sense Revolution, the Ontario government faced an $11 billion annual deficit and a $100 billion debt. Seeking to balance the books, a number of publicly owned services were privatized over the following years. Although initially spared, Highway 407 was sold quickly in the year leading up to the 1999 provincial elections. The highway was leased to a conglomerate of private companies for $3.1 billion. The Ontario corporation, known as 407 International Inc., was initially owned by the Spanish multinational Cintra Infraestructuras, as well as various subsidiaries of the Canada Pension Plan Investment Board and the Montreal-based engineering firm SNC-Lavalin.
The deal included a 99-year lease agreement with unlimited control over the highway and its tolls, dependent on traffic volume; however, the government maintains the right to build a transport system within the highway right-of-way. It is today described as a "value generating monster" and "cash cow" for SNC-Lavalin, and one of the "worst financial missteps" from any government in Ontario's history.
When purchased, the highway travelled from the junction of Highway 403 in Mississauga to Markham Road in Markham. Extensions westward to the QEW and eastward to Highway 7 and Brock Road in Pickering were constructed by the corporation, as mandated in the lease agreement.
The western extension, from Highway 403 southwest to the QEW, was not part of the original Highway 407 concept in 1987; rather, the corridor was originally intended to connect the Hamilton and Mississauga sections of Highway 403. Highway 407 was originally slated to assume the temporary routing for Highway 403 along the Mississauga-Oakville boundary to end at the QEW. However, the Bob Rae led Ontario government altered these plans in 1995, and the corporation constructed this section quickly upon obtaining the lease. Sections opened throughout the middle of 2001: between Neyagawa Boulevard and Highway 403 on June 17; between Bronte Road and Neyagawa Boulevard on June 29; between Dundas Street and Bronte Road on July 18; and between the Freeman Interchange and Dundas Street on July 30. In the east, a final extension between Markham Road and Highway 7 opened a month later on August 30.

Highway 407 East project

A provincially-operated long extension to the 407 ETR, known as Highway 407 East during planning, began construction in 2012, with the project undertaken in two separate phases. Phase 1 was opened on June 20, 2016, consisting of a extension to Harmony Road in Oshawa, as well as the Highway 412. The extension was free of tolls until February 1, 2017. Phase 2A, which opened on January 2, 2018, added a extension to Taunton Road at the future Highway 418 interchange. Phase 2B, which opened on December 9, 2019, added a extension to Highway 35 and Highway 115, as well as the Highway 418.
An environmental assessment to analyze the proposed extension was undertaken in the early 2000s. The assessment also included studies of the two north–south connectors. A preferred route was announced in June 2007, and the EA was completed in June 2009. On March 6, 2007, as part of the FLOW initiative, the Government of Canada and the Province of Ontario confirmed the extension of the 407 to Highway 35 and Highway 115 in Clarington, including the connector highways, with an announced completion date of 2013.
On January 27, 2009, the provincial government announced that the extension would be a tolled highway but owned by the province and with tolls set by the province. The announcement also indicated that the province expected to issue a Request for Proposals later in the year.
The contract, which is valued at $1.6 billion and includes construction and operation of the highway, was eventually awarded to the same consortium that owns 407 ETR.
On June 9, 2010, the MTO approved the extension as far east as Simcoe Street in Oshawa, announcing plans to phase construction of the extension. Local residents and politicians rejected the plan, as had happened with the section between McCowan Road and Markham Road. A motion was proposed in the Ontario Legislature to build the full extension in one project, but failed to pass. Instead, a compromise was issued on March 10, 2011: the first phase would extend Highway 407 to Harmony Road in Oshawa by 2015, including Highway 412; the second phase would then complete the extension to Highway 35 / 115 by 2020, including Highway 418. This timeline was confirmed by Premier Dalton McGuinty on May 24, 2012, and construction began in the first quarter of 2013.
In early December 2015, it was announced that contractor delays would push the opening of the first phase from December 18 to the spring of 2016.
The extension did not open until the morning of June 20, 2016, in the last hours of Spring 2016.
On December 9, 2019, the final portion of the 407 East highway, the section of the highways east of and all of Ontario Highway 418 opened to the public, marking the end of the 407 East project. The final portion was originally projected to be completed in 2020. Unlike when the extension originally opened, tolling started immediacy on the final portion. The highway now east to Ontario Highway 115, providing more options for people living in and around Peterborough to get into Toronto and the western part of the Greater Toronto Area.

Highway widening

Between 2018 and 2019, Highway 407 was widened between Markham Road and Brock Road. The first project, widening the highway to 6 lanes between York-Durham Line and Brock Road, began in Spring 2018 and was completed in August 2018. The second project, which widened the highway to 8 lanes between Markham Road and York-Durham Line, was completed in September 2019.

Future

The future town of Seaton is currently under development with the release of development lands in Durham north of the Gatineau Hydro Corridor and west of Brock Road. This development will include the future Pickering Airport, slated for construction in 2020. Interchanges with future extensions of Rossland Road and Whites Road will be built as part of the large road network planned for the development.