The is owned by eni Liverpool Bay Operating Company Ltd, a subsidiary of eni UK Ltd. It is built near the site of a former colliery, which closed in August 1996. Approval for the site was given in February 1993, to be constructed by Hamilton Oil. BHP bought Hamilton Oil in 1991. The amount of gas to be brought onshore would be enough to provide electricity for half of Wales. Construction took place in 1994. eni bought BHP Billiton's interest in the Liverpool Bay Development in April 2014. The gas comes from the Triassic Ormskirk Sandstone Formation.
Operation
It is just off the A548, next to the North Wales Coast Line and run by eni Liverpool Bay Operating Company Ltd, with offices at Llaneurgain House at Northop Country Park. The nearest town is Prestatyn, to the west. The plant has a capacity to treat per day at standard conditions of sour gas from offshore. The gas is brought ashore via a diameter, 33 km long pipeline. The plant separates methanol, water and condensate from the gas stream. The gas is sweetened with an amine solvent to remove sulphur compounds down to 3.3 ppm hydrogen sulphide and 35 ppm mercaptans. The hydrocarbon dew-point of the gas is reduced by mechanical refrigeration to a quality suitable for pipeline transportation. The treated gas is piped to Connah's Quay Power Station at 30 bar via a 27 km pipeline. Any gas surplus to the fuel requirements of the power station is further treated and delivered to the Burton Point terminal of the National Transmission System. In the series of fields, the Douglas field is only an oil field.
The Douglas Complex is from the Welsh coast. It is powered by two 42MW gas turbines. Gas is part-processed at the complex.
Gas fields
These were previously owned by BHP PetroleumGreat Britain plc, LASMO Ltd and a small amount by Centrica. The Centrica share was purchased by Eni UK Ltd, and the Lasmo share was owned by Eni ULX Ltd. eni now owns 100% of this development after it purchased BHP Billiton's shares in April 2014.
Hamilton
Discovered in June 1990. Production started in February 1997.
Hamilton North
Discovered in May 1991. Production started in December 1995.