The Old Colony Railroad had a South Quincy station at Water Street in southern Quincy. In December 1867, it was renamed Quincy Adams. A stone station building was constructed in 1869; it was identical to the still-extant station at Avon, which was built around the same time. The 1926 Report on Improved Transportation Facilities and 1945–47 Coolidge Commission Report recommended the Cambridge-Dorchester Line receive a branch to Braintree along the Old Colony right-of-way. Quincy Adams station closed along with the rest of the Old Colony system on June 30, 1959, and was later demolished.
Red Line opening
The MBTA received a $21 million federal grant in July 1976 for the construction of South Quincy station. The station opened on September 10, 1983 as an infill station on the Braintree Branch. Quincy Adams had been scheduled to open along with Braintree, but construction delays caused opening to be three years late. The station has been accessible since at least 1989. The station ultimately cost $32 million to build. From their openings until 2007, a double entry fare and single exit fare were charged at Quincy Adams and Braintree when leaving the subway, as a proxy for distance-based fares. The extra fares was discontinued as part of a fare increase and service change on January 1, 2007. Similar charges existed until 1980 for the inner stations on the Braintree Branch.
Garage issues
Until 2012, access to the garage had only been from ramps off I-93 and Route 3, with the Burgin Parkway entrance leading only to a 160-space surface lot. In July 2012, after the closure of the garage at Quincy Center due to structural issues, the 130-space lower level of the garage was made accessible from Burgin Parkway as well. Although built to last 50 years, the $28 million garage at Quincy Adams began suffering concrete damage due to water leakage and ill-fitting structural elements. Repairs were performed to the Quincy Adams and Braintree garages in the mid 1990s. In 2015, the MBTA began a $4.4 million project to address urgent structural issues with the two garages, though full repair or replacement was still needed. The garage is being fully renovated from May 2018 through December 2021 at a cost of $35 million; the station and garage will remain open during the whole project. A separate $10.5 million project, lasting from August 2018 to October 2021, will replace three existing elevators and add a redundant platform elevator.
Independence Avenue entrance
Until December 2018, the only pedestrian access to the station was via the park and ride garage off Burgin Parkway. The MBTA opened a pedestrian entrance on the east side of the station leading to Independence Avenue in 1981. However, the streets surrounding that entrance were frequently used for parking by riders seeking to avoid paying for the parking garage. In the late 1980s, the entrance was closed, leaving neighborhood residents without station access. Some neighborhood residents climbed over the gate to use the station. The entrance was a point of contention between the cities of Quincy and Braintree; in February 2014, officials from the two towns proposed that a lock system be created where only nearby residents could enter from Independence Avenue. The garage improvements included repairs to the pathway from Independence Avenue, but the MBTA claimed that the entrance was a "city issue" and did not plan to reopen it as part of the project. In April 2018, the city announced that the gate would be opened by September of that year. The gate was ultimately opened on December 3, 2018.
Bus service
The station was built with a large busway for MBTA bus routes, with entry from Centre Street and exit to Burgin Parkway, but it has remained very underutilized throughout the history of the station. The busway has never served as a terminal for any MBTA bus route, and only route uses it. However, several other services have used the busway at various times. In November 1985, one-week trials were run of MBTA service directly from and Quincy Adams to Logan International Airport. The Quincy Adams service was considered successful and became permanent; it was later contracted to Plymouth & Brockton in November 1987. From 1988 to 1990, service continued past Quincy Adams to Plymouth. In November 1990, the terminal was moved from Quincy Adams to a parking lot near Braintree to free garage spots for MBTA commuters. In February 1990, two special routes, 201 –Museum of Fine Arts and 202 Quincy Adams–Museum of Fine Arts, were run during a Monet exhibition at the museum. Beginning in August 1999, Interstate Coach operated reverse commute bus service from Boston to a business park in Canton, with intermediate stops at and Quincy Adams. The service was operated byBloom Bus Lines after it acquired Interstate in August 2003, but discontinued in July 2004. Beginning with the 1994 season, the MBTA subsidized private-carrier service from, Alewife, Riverside, and Quincy Adams to Gillette Stadium for New England Patriots home games. Service from the latter three stations lasted until the 2000 season.