Shin'etsu Main Line
The Shinetsu Main Line is a railway line, consisting of three geographically separated sections, operated by the East Japan Railway Company in Japan. It was originally one continuous line connecting and via ; however, with the opening of the Hokuriku Shinkansen, some sections were transferred to the third-sector railway companies or abandoned.
The name of the line refers to the old names for Nagano and Niigata Prefectures, Shinano and Echigo.
The abandoned section through the Usui Pass was famous for its steep 66.7‰ gradient.
Sections
From 14 March 2015, the line consists of the following three sections.- – : in Gunma Prefecture
- – : in Nagano Prefecture
- – : in Niigata Prefecture
Services
Takasaki–Yokokawa
- Local: 1 or 2 trains per hour
- Excursion train: SL Usui
Shinonoi–Nagano
Naoetsu–Niigata
;Limited express, Rapid, the following services are operated.
Name | Route | Service frequency |
Limited Express Shirayuki | – Naoetsu – Niigata | 5 return trips |
Rapid Ohayo-Shinetsu | Naoetsu – Niigata | 1 down trip |
Rapid Rakuraku-Train-Shinetsu | Naoetsu – Niigata | 1 up trip |
Rapid | Naoetsu – Niigata | 1 return trip |
Rapid | Naoetsu – Nagaoka | 2 down trips 1 up trip |
Rapid | Nagaoka – Niigata | 1 return trip |
;Local
;Excursion train
Stations
Takasaki–Yokokawa
Yokokawa–Shinonoi
The section between Yokokawa and was closed and the section between Karuizawa and Shinonoi was transferred to the ownership of the third-sector railway operator Shinano Railway from 1 October 1997 with the opening of the Hokuriku Shinkansen between Takasaki and Nagano.Shinonoi–Nagano
Nagano–Naoetsu
The section between Nagano and Naoetsu was transferred to the ownership of the third-sector railway operators Shinano Railway and Echigo Tokimeki Railway from 14 March 2015 with the opening of the Hokuriku Shinkansen extension north of Nagano.Naoetsu–Niigata
Rolling Stock
Present
Takasaki–Yokokawa
- 211 series 4/6-car DC EMUs
Shinonoi–Nagano
- 115 series 2/3-car DC EMUs
- 211 series 3-car DC EMUs
- E127-100 series 2-car DC EMUs
- 383 series 6-car DC EMUs
Naoetsu–Niigata
- 115 series 3-car DC EMUs
- E129 series 2/4 car DC EMUs
- ET127 series 2-car DC EMUs
- E653-1100 series 4-car DC/AC EMUs
Former
Takasaki–Yokokawa
- 115 series
- 107 series
Naoetsu–Niigata
- 485 series - Hokuetsu, Kubikino, Ohayo-Shinetsu, Rakuraku-Train-Shinetsu, Moonlight Echigo, Minori, Hakuchō, etc.
- 489 series - Noto etc.
- 583 series - Kitaguni
- 181 series, 183 series - Toki etc.
- 165 series
- 70 series
History
The Hokuetsu Railway opened the Naoetsu to Nagaoka section in 1897, extending the line to Niigata in 1904. That company was nationalised in 1907. In 1909, the Imperial Japanese Railway authories invited bids for the electrification of the route. A German company was selected to provide the engines and General Electric supplied the turbines at the power station. In 1912, the rack section was electrified using third rail at 600 V DC, this being the first use of this method in Japan. The electrification allowed for the use of faster and longer trains which reduced journey times and also pollution from the steam engines.
Double-tracking
The Karuizawa to Nagano section was double-tracked between 1917 and 1920, with the Nagaoka to Miyauchi section double-tracked in 1931, and the Niitsu - Kamo section in 1944. Double-tracking of the remainder of the Niigata to Naoetsu line was undertaken in sections between 1958 and 1973.Double-tracking of the remainder of the Takasaki to Kaminagano line was undertaken in sections between 1963 and 1973, commencing with the replacement of the rack mechanism with an adhesion only electrified operation on the 1 in 15 grade. The rack equipment was initially kept as a contingency, and removed two months after the adhesion-only operation commenced and had proved its reliability.
The Kurohime to Myoko-Kogen section was double-tracked in conjunction with a realignment in 1980. The Mure to Kurohime section was also realigned and prepared for double-tracking, but the second track was not laid.
Electrification
The Miyauchi to Nagaoka section was electrified in 1947 at 1,500 V DC in conjunction with the electrification of the Joetsu Line, with the Nagaoka to Niigata section electrified in 1962, the same year the Takasaki to Yokokawa section was commissioned to facilitate the extension to Nagano the following year via the new adhesion line through the Usui Pass mentioned above. The Nagano to Naoetsu section was electrified in 1966, and extended to Miyauchi in 1969.Separation into sections
In 1997, following the opening of the Nagano Shinkansen, the Yokokawa to Karuizawa section was closed, and the Karuizawa to Shinonoi section transferred to the third-sector Shinano Railway.On 14 March 2015, following the extension of the Hokuriku Shinkansen to, the to section was also spun off to the following two third-sector operating companies owned primarily by the respective prefectures and municipalities.
- Shinano Railway Kita-Shinano Line
- Echigo Tokimeki Railway Myōkō Haneuma Line
Former connecting lines
- Nagano Station: The Zenkoji Hakuba Railway Co. opened a 7 km line to Susohana Guchi in 1936. A proposal for the line to be extended to Hakuba on the Oito Line did not eventuate, and the line closed in 1944.
- Kuroi Station: The Kubiki Railway Co. opened a 15 km gauge line to Uragawara between 1914 and 1916, with the line closing in 1971.
- Raikoji Station: The Nagaoka Railway Co. opened a 39 km line to Teradomari between 1915 and 1921. This company introduced Japan's first diesel railcar in 1928, and in 1951 electrified 31 km of the line at 750 V DC in 70 days, completing the balance the following year. Significant typhoon damage occurred in 1966, and in 1972, passenger services ceased between Raikoji and Nishinagaoka, with the entire line becoming freight-only three years later. The line closed in 1995.
- Nagaoka Station: The Tochio Railway opened a 27 km gauge line to Tochio and Yūkyūzan between 1915 and 1924. The line was electrified at 600 V DC in 1948, with this being raised to 750 V DC in 1956. CTC signalling was commissioned in 1961, freight services ceased in 1967, and the line closed between 1973 and 1975.
- Higashi Sanjo Station: The Echigo Railway Co. opened the 8 km line to Echigo Nagasawa in 1927, and was nationalised two months later. Freight services ceased in 1960, and the line closed in 1985.
- Kamo Station: The Kanbara Railway Co. operated a line to Gosen on the Ban'etsu West Line from 1923 until 2002.