Simplon Tunnel
The Simplon Tunnel is a railway tunnel on the Simplon railway that connects Brig, Switzerland and Domodossola, Italy, through the Alps, providing a shortcut under the Simplon Pass route. It is straight except for short curves at either end. It actually consists of two single-track tunnels built nearly 15 years apart. The first to be opened is long; the second is long, making it the longest railway tunnel in the world for most of the twentieth century, from 1906 until 1982, when the Daishimizu Tunnel opened.
Culminating at a height of only above sea level, the Simplon Tunnel was also the lowest direct Alpine crossing for 110 years, until the opening of the Gotthard Base Tunnel in 2016. The tunnel has a maximum rock overlay of approximately, also a world record at the time. Temperatures up to have been measured inside the tunnel.
Work on the first tube of the Simplon Tunnel commenced in 1898. The Italian king Victor Emmanuel III of Italy and the president of the Swiss Confederation Ludwig Forrer opened the tunnel at Brig on 10 May 1906. The builders of the tunnel were Hermann Häustler and Hugo von Kager. Work on the second tube of the tunnel started in 1912 and it was opened in 1921.
History
Shortly after the opening of the first railway in Switzerland, each region began to favour a separate north-south link through the Alps towards Italy. Eastern Switzerland supported a line through the Splügen Pass or the Lukmanier Pass, Central Switzerland and Zürich favoured the Gotthard Pass and Western Switzerland supported the Simplon route.In 1871 the first line was completed through the Alps, connecting Italy and France with the Fréjus Rail Tunnel.
The Compagnie de la Ligne d'Italie was founded in 1856 to build a connection between Romandy and Italy through the Canton of Valais and the Simplon. On 1 June 1874, it was taken over by the Simplon Company, which was created to promote the project. This merged in 1881 with the company Western Swiss Railways to create the Western Switzerland–Simplon Company. The French financiers of the SOS were able to secure finance for the tunnel in 1886. The company considered 31 proposals and selected one that involved the construction of a tunnel from Glis to Gondo, which would have been fully in Switzerland. From Gondo it would have continued on a ramp through the Divedro valley down to Domodossola.
At a Swiss-Italian conference held in July 1889, it was agreed, however, to build a nearly base tunnel through the territory of both states. In order to secure credit for the tunnel, the SOS joined with the Jura–Bern–Luzern Railway to create the Jura–Simplon Railway.
The participation of the Swiss government led to the signing of a treaty with Italy on 25 November 1895 concerning the construction and operation of a railway through the Simplon from Brig to Domodossola by the Jura–Simplon Railway. The route of the tunnel was determined by military considerations so that the state border between the two countries was in the middle of the tunnel, allowing either country to block the tunnel in the event of war.
On 1 May 1903, the Jura-Simplon Railway was nationalized and integrated into the network of the Swiss Federal Railways, which completed construction of the tunnel.
Construction
The construction of the tunnel was carried out by the Hamburg engineering company Brandt & Brandau, of Karl Brandau and. On average, 3,000 people a day worked on the site. They were mostly Italians, who suffered under very poor working conditions: 67 workers were killed in accidents; many died later of diseases. During the work, there were strikes, which led to the intervention of vigilantes and the Swiss army.With up to of rock over the tunnel, temperatures of up to were expected and a new building method was developed. In addition to the single-line main tunnel, a parallel tunnel was built, with the tunnel centres separated by, through which pipes supplied fresh air to the builders in the main tunnel. It was envisaged that the parallel tunnel could be upgraded to a second running tunnel when required. The first Simplon Tunnel was built almost straight, with only short curves at the two tunnel portals.
On 24 February 1905, the two halves of the tunnel came together. They were out of alignment by only horizontally and vertically. Construction time was years, rather than years, due to problems such as water inflows and strikes.
Silver Medallion by Giannino Castiglioni for the Milan International Exhibition 1906. The South Portal of the Simplon Tunnel is on the obverse.
Electrification and operation
Operations commenced through the tunnel on 19 May 1906. Because of its length among other things, it has operated with electric traction rather than steam from the beginning. The official decision to use electricity was made only half a year before its opening by the then-still-new SBB. Brown, Boveri & Cie were commissioned to carry out the electrification. They decided in 1904 to use the three-phase system being introduced in Italy, with a three-phase power supply of 3,400 volts at 15.8 Hz using two overhead wires with the track acting as the third conductor. BBC had no electric locomotives and initially acquired three locomotives built for the Ferrovia della Valtellina—the owner of the lines from Colico to Chiavenna and Tirano, which had been electrified with this system in 1901 and 1902—from their owner, the Rete Adriatica railway company. These three locomotives hauled all traffic through the tunnel until 1908. On 2 March 1930, the Simplon tunnel was converted to 15 kV, 16.7 Hz AC.Expansion
Between 1912 and 1921, the second tube, known as Simplon II, was built. On 7 January 1922 the northern section from the north portal to the passing loop in the middle of the tunnel was brought into operation, followed on 16 October 1922 by the southern section from the passing loop to the south portal.Second World War
During the Second World War, on both sides of the border there were preparations for the possible detonation of the tunnels. The explosives attached to the tunnel on the Swiss section were not removed until 2001. In Italy, the German army planned, as part of its 1945 withdrawal, to blow up the tunnel, but were thwarted by Italian partisans with the help of two Swiss officials and Austrian deserters.Present and future
Car-carrying shuttle trains
There is a car-carrying shuttle between Brig and Iselle di Trasquera, which provides a 20-minute train journey as an alternative to driving over the Simplon Pass. The service began on 1 December 1959. As roads over the Simplon Pass steadily improved throughout the 1970s and 1980s the tunnel's shuttle schedule was cut back, then ended altogether on 3 January 1993. Almost twelve years later, on 12 December 2004, the car shuttle service began again and now runs about every 90 minutes.Piggyback transport
In the early 1990s, a project to implement the rolling highway system of piggyback operations for transalpine freight on the Lötschberg–Simplon axis was implemented. Such operations were possible under the previous profile of the Simplon Tunnel, but capacity would have been heavily restricted because its height was too low to carry trucks at the permitted maximum corner height of. The clearance in the tunnel was therefore increased by lowering the rail trackbed. This work began in 1995 and lasted eight years. At the same time, the tunnel vault was rehabilitated, while the drainage tunnel was rebuilt. A total of of rock was removed with pneumatic breakers.In addition, a new railway electrification system was installed using overhead electric rail instead of the tensioned cable normally used for overhead electrification so that the required height clearance could be achieved. In the late 1980s, a long overhead electric rail had been tested at. Before this experiment, trains running under overhead electric rails in Switzerland had been limited to and internationally to.
Restricted rail operations were maintained during the entire construction period.
Expansion of access routes
In order to expand the Lötschberg-Simplon axis into a powerful transit axis, various extensions to the access lines have been made in recent years and decades. The largest projects have dealt with the northern access from Basel-Bern via Lötschberg. Between 1976 and 2007 there were three major transformations. First, the remaining single-track line between Spiez and Brig was dualled. Later, adjustments were made to the tunnel profile for piggyback traffic; in places only widening one track was possible. Finally, the Lötschberg Base Tunnel opened in 2007, although part of this is still single-track in order to save costs.Clearances were also raised for the piggyback traffic on the Italian side as well on the Simplon southern approach. Here, too, for financial reasons, at times only one line was cleared for the rolling highway. South of Domodossola, the single line to Novara via Lake Orta was electrified and modernized.
The classic approach to the Simplon from Paris and Lausanne—less important for today's transit traffic—was upgraded in the context of a nationwide rail upgrading project, Rail 2000, between 1985 and 2004. Further adjustments are proposed. In November 2004, the new line between Salgesch and Leuk in the Rhone Valley was completed to replace the last single-track bottleneck on the route. Under the ZEB package, the maximum speed on the long straight sections of the Rhone valley lines will be increased from.
2011 fire
On 9 June 2011, a section ofthe Simplon II tunnel's roof was seriously damaged when a northbound
BLS freight train caught fire and stopped
into the tunnel. The temperature exceeded
and took more than two weeks to cool back to normal.
By agreement all repairs to the tunnels are the responsibility of
the SBB, which expected to reopen the tunnel
in December 2011. The other tunnel remained in service.
Repair work was completed in November 2011.
Facts and figures
- Length of tunnel I:
- Length of tunnel II:
- Elevation at north portal, Brig:
- Elevation at crest of the tunnel:
- Elevation at south portal, Iselle:
- Gradient on north side: 2 ‰
- Gradient on south side: 7 ‰
- Maximum rock overlay:
- Start of construction on north side: 22 November 1898
- Start of construction of south side: 21 December 1898
- Breakthrough: 24 February 1905
- Inauguration: 19 May 1906
- First electrical operation: 1 June 1906
Spiral tunnel