Stowmarket railway station


Stowmarket railway station is on the Great Eastern Main Line in the East of England, serving the town of Stowmarket, Suffolk. It is down the line from London Liverpool Street and is situated between to the south and to the north. It is also the junction where the Ipswich to Ely Line joins the GEML. Its three-letter station code is SMK.
The station is currently operated by Abellio Greater Anglia, which also runs all trains that serve the station.

History

Opening (1846-1862)

The station was opened by the Ipswich & Bury Railway in 1846 with red brick main buildings in a flamboyant Jacobean manner by Frederick Barnes.
Building the railway from Ipswich to Bury St Edmunds proved challenging. When the Eastern Union Railway opened the line to Ipswich Stoke Hill railway station in 1846 this was located south of the existing tunnel. The Ipswich and Bury Railway built the tunnel which proved a challenge and then a further challenge awaited the railway's engineers at Stowmarket area where local marsh swallowed up a lot of material with test probes finding the bog was 80 feet deep! The railway employed George Stephenson's solution for the Chat Moss bog and a raft of brushwood and faggots was used to give the embankment a firm footing. The River Gipping was also diverted to aid the project.
On 26 November 1846 the first test train ran to Bury St Edmunds with stops at most stations on the route, accompanied by the inevitable lavish celebrations. The official opening followed on 7 December 1846 when a special train ran from Shoreditch to a temporary station at Bury St Edmunds. The Board of Trade inspection took place on 15 December 1846 and the line opened for traffic on 24 December.
The IBR and the EUR were worked as one concern from 1847 and the following year the line from Haughley Junction and Norwich opened in stages: from Haughley to Finningham on 7 June 1848, from Finningham to Burston on 2 July 1849 and finally through to Norwich Victoria on 1 December 1849. Stowmarket now had links to Bury St Edmunds and Norwich.
The EUR was in financial trouble and effectively hemmed in by the Eastern Counties Railway making further expansion difficult. Following negotiations in 1853, The ECR took over the working of the EUR on 1 January 1854, a situation formally sanctioned by the Act of 7 August 1854.
1854 also saw the completion of the link from Bury St Edmunds to Cambridge thus linking Ipswich and Stowmarket to Cambridge.
By the 1860s the railways in East Anglia were in financial trouble, and most were leased to the ECR; they wished to amalgamate formally, but could not obtain government agreement for this until 1862, when the Great Eastern Railway was formed by amalgamation. Thus Stowmarket became a GER station in 1862.

Great Eastern Railway (1862-1922)

The line from Chippenham Junction to Snailwell Junction near Newmarket opened on 1 April 1880 giving Stowmarket a direct link to Ely and the Midlands. From 1883 the North Country Continental used this route to Manchester.
Up until 1913 all shunting was performed by either the train locomotive or horses. From that year a local shunting engine was employed additionally and this also covered shunting duties at nearby Needham Goods Yard.
Additional sidings were installed during World War One for the increased demand in explosive traffic and both the down and up side goods facilities remodelled.

London & North Eastern Railway (1923-1947)

Following the Railways Act 1921 Stowmarket station was operated by the London and North Eastern Railway from 1 January 1923.
During the mid-1920s the LNER rebuilt the two track timber goods shed and a number of industrial concerns were built south of the station on the up side all of which were rail served.
A third signal box – Stowmarket Works – was opened to serve these facilities in 1941.

British Railways (1948-1994)

Following nationalisation in 1948, Stowmarket station became part of the Eastern Region of British Railways.
Stowmarket Works signal box closed in October 1957.
Some shunting at Stowmarket was carried out by horses as late as 1958.
The buildings, which were Grade II listed in 1972, were restored in 1987.
Goods traffic lasted until the mid-1970s, the yard being shunted by a Norwich-based British Rail Class 03 locomotive.
Some ICI traffic lasted a few years longer.
The line through the station was electrified and resignalled by British Rail in 1985 using the 25 kV AC electric system. The first electric train ran on 6 April 1987 with the full electric service starting on 11 May 1987.

The privatisation era

In April 1994 Railtrack became responsible for the maintenance of the infrastructure. Railtrack was succeeded by Network Rail in 2002.
Passenger services have been operated by the following franchises:

Passenger station

As mentioned above the station buildings were listed in 1972 and restored in 1987. Historic England describes the station buildings thus:
"Red brick with gault brick dressings under roofs clad in machine tiles. 1-3 storeys on high basements. Composition, in Jacobean style, is symmetrical, comprising a central one storey and attic block linked by single-storey ranges to taller 2-3 storey side blocks. Central block with Dutch gables to west, north and south, the west one facing the entrance and with an attic window. Windows generally are ovolo-moulded cross casements, cornices are saw-toothed. 2 square one-storey pavilions flank main entrance right and left. Recessed linking blocks had retaining walls with taller central doorways enclosing forecourt, but this remains now only to south side. Main outer blocks with cross casements, Dutch gables to all faces, and frontal polygonal towers with doors at the bases and pierced parapets at the top. Gabled roofs carry romantically-placed 2- and 3-flued stacks. Platform canopies supported on square section welded steel piers of late C20. The piers rise to timber braces within which are cast-iron scrolled brackets. Inner face of main west range with 4 arches right and left of central entrance to booking hall."
Nicklaus Pevsner described it as "an elaborate piece of Elizabethan architecture by Frederick J Barnes, 1849. Red and yellow brick, symmetrical, with shaped gables and angle towers."
The Stowmarket area was controlled by two signal boxes – one at the station that exists today as a gate control box and the Yard Box to the south. A third called Stowmarket works existed 1941–1957.
There are two platforms linked by a footbridge. The original footbridge is preserved at Weybourne railway station on the North Norfolk Railway. The down platform was restricted to five coaches for many years but both platforms were lengthened prior to electrification in 1985.
Today there is a small convenience store is located on platform 2. Disabled access between platforms is possible using the Stowupland Road level crossing.
Most of the former railway land is now given over for car parking for the station.

Goods facilities

The down side yard had an extensive array of sidings and a two-track wooden goods shed. Outbound goods traffic at Stowmarket was primarily agricultural in nature with coal being a major inward commodity.
The up side also had a number of sidings some of which were located behind the up platform. Gun cotton was produced here first by Prentices and later by the New Explosives Company Limited.
The latter siding was actually accessed from the down side sidings of the British Acetate Silk Corporation Ltd and a short tunnel under the main line. The site had a number of standard gauge industrial locomotives between 1915 and 1931 although after that date it was shunted by LNER and then BR locomotives. Both sites had a narrow gauge tramways but it is unknown whether these had any locomotives.
Other local rail served businesses included a brewery,a timber merchant, a Co-op milk depot and a manure works.

Locomotive facilities

An inspection pit and coal stage were provided in the early 1920s – probably primarily used by the local shunting locomotive, generally a GER 0-6-0T engine such as a GER Class R24 or similar undertook these duties.
Currently the sidings at Marsh Lane, south of the station and on the site of the former down side goods yard, are used by Direct Rail Services as a locomotive stabling point. A crew office is provided on platform 1.

Services

1850

The March 1850 Bradshaw's Guide saw Eastern Union Railway services to Stowmarket shown on page 33. Four weekday EUR trains from Colchester to Norwich Victoria served Stowmarket. Connections for Bury St Edmunds were made at Haughley Junction just to the north. A similar service operated in the up direction and an arrival in London could be made at 1005.

1964

The September 1964 British Railways Eastern Region timetable saw three service groups regularly serving Stowmarket:
In addition, there were a number of other cross-country trains including:
operate services calling at Stowmarket, comprising services between London Liverpool Street or Ipswich and Norwich, and other trains between Ipswich and or via the Ipswich to Ely Line. Limited additional services to/from Liverpool Street start or terminate at Stowmarket during rush hour.