Swindon railway station


Swindon railway station is on the Great Western Main Line in South West England, serving the town of Swindon, Wiltshire. It is down the line from and is situated between and on the main line. It is managed by Great Western Railway, which also operates all the trains.
It is an important junction, where the former Great Western Railway line to and, the main line to, and the South Wales Main Line via diverge.
It is approximately from the central bus station and the town centre. It is served by GWR services from Paddington to Bristol Temple Meads,, Cheltenham Spa via Gloucester, and the rest of South Wales, and to.

History

The main line of the Great Western Railway was built and opened in stages. Construction began in late 1835, and by the end of August 1840 the line was open between and , also between Bristol and Bath. The section from Faringdon Road to a temporary terminus at was opened on 17 December 1840; this passed to the north of the market town of Swindon ; but the only intermediate station opened at that time was at.
Meanwhile, the Cheltenham and Great Western Union Railway had in 1836 been authorised to link the GWR with Gloucester and Cheltenham, and for this line, a junction at Swindon had been decided upon. The GWR line was planned by Isambard Kingdom Brunel to rise from both London and Bristol to a summit near Swindon, and to have easy gradients east of that summit, and steeper gradients to the west. Brunel, and his colleague Daniel Gooch, decided in October 1840 that one locomotive would not be able to manage the whole distance without taking on fuel; and it would be necessary to change locomotives part-way. Reading was chosen as one place to change engines, being both a major station and, at just under 36 miles, approximately one-third of the 118-mile distance from Paddington to Bristol. They also felt that it would be convenient to change locomotives at Swindon; not only was this almost two-thirds of the way and the site of the junction for the Cheltenham line, it was also the summit of the line; and a train from London could have its fast locomotive replaced by a slower but more powerful locomotive for the journey on to Bristol. Accordingly, it was necessary to provide locomotive maintenance facilities at Swindon.
The proximity of the North Wilts Canal was also a factor, since it would enable coke for the locomotives and coal for the workshops to be supplied from the Somerset Coalfield at a reasonable price. A station was then planned around the junction, and opened at the same time as the first portion of the Cheltenham line ; the GWR main line was extended from Hay Lane to on the same day, 31 May 1841. The GWR had engaged the Westminster firm of Messrs. J. & C. Rigby to build several stations, including all those between and ; this firm was also given the construction contracts for all of the buildings at Swindon, including the station and its refreshment rooms, the locomotive repair shops, 300 houses and other buildings needed for the workers. The GWR was short of money, and in late 1841 the contractors, instead of asking for payment, agreed to give Swindon station and its refreshment rooms to the GWR free of charge, and to lease back the refreshment rooms for 99 years at one penny per year. Part of the deal was that In this "reasonable period", not only could the passengers be refreshed but the locomotive would also be changed. Messrs. Rigby would then be able to use the profits from the refreshment rooms to recover their financial outlay. Not long after the contract was finalised, Rigby then sublet the rights to S. Y. Griffiths of Cheltenham for seven years, for which Griffiths paid Rigby £6,000 up front and then £1,100 per year. Before this expired, Rigby sold the lease to J. R. Phillips for £20,000 in August 1848.
With the railway passing through the town in early 1841, the Goddard Arms public house in Old Swindon was used as a railway booking office in lieu of a station. Tickets purchased included the fare for a horse-drawn carriage to the line at the bottom of the hill.
Swindon railway station opened in 1842 with construction of the GWR's engineering works continuing. Until 1895, every train stopped here for at least 10 minutes to change locomotives. Swindon station hosted the first recorded railway refreshment rooms, divided according to class. Swindonians, for a time, were eminently proud that even the current King and Queen of the time had partaken of refreshments there. The station in 1842 was built of three storeys, with the refreshment rooms on the ground floor, the upper floors comprising the station hotel and lounge. Until 1961, when Swindon Town station closed, the station was known as Swindon Junction.
The original building was demolished in 1972, with today's modern station and office block erected on the site.
The Travel Centre at Swindon was APTIS-equipped by the end of October 1986, making it one of the very first stations with the ticketing system which was eventually found across the UK at all staffed British Rail stations by the end of the 1980s.
On 2 June 2003 Platform 4 opened. Prior to this all westbound trains had used Platform 3 and eastbound services Platform 1. Services terminating or starting here on the lines to via Chippenham and use platform 2, a west-facing inset bay.

Awards

All services at Swindon are operated by Great Western Railway.
The station is served by frequent intercity trains to London Paddington eastbound and westbound to Bristol, Cheltenham Spa and Cardiff along the Great Western Main Line as well as a local service to via the Wessex Main Line.
The typical off-peak service in trains per hour is:
Additional services run during the peak periods and some existing services are extended further afield. One train is extended beyond Swansea to and a number of trains are extended beyond Bristol Temple Meads to, and.

Panel box

The railway in the vicinity of Swindon station and for a distance of about 20–30 miles in each direction towards Didcot, Bristol, South Wales and Gloucester was controlled from a signal box situated behind platform number 4. The panel box is a Western Region Integra design built by Henry Williams and opened in March 1968. The box was decommissioned in February 2016 and the panel was moved for preservation to Didcot Railway Centre.

Plans

It was announced in December 2005 that stations in the Thames Valley region were to be upgraded.
In August 2014, Network Rail completed the redoubling of the track between Swindon and Kemble in order to improve rail services between London and Cheltenham/Gloucester, and to allow for maintenance work in the Severn Tunnel when Swansea services are diverted via Gloucester. When originally laid in 1842 the line was double-track throughout, however some of the second track were removed in 1968/69., the Office of Rail Regulation was receiving submissions to restore this project to Network Rail's plans for 2009–2014. The project cost was estimated at £50.2 million and received backing from the South West Development Agency and others but stalled when it was left out of the new Coalition Government's Spending Review in October 2010. Work commenced in January 2013 and was completed in August 2014.
On 1 March 2011, Secretary of State for Transport Philip Hammond announced that plans for electrifying the Great Western main line west from Didcot through Swindon to Bristol and Cardiff had resumed at a planned cost of £704 million. The electrification project had first been announced by the previous Government's Transport Secretary Andrew Adonis, on 23 July 2009.