Great Western main line
The Great Western main line is a main line railway in England, that runs westwards from London Paddington to. It connects to other main lines such as those from Reading to Penzance and Swindon to Swansea. Opened in 1841, it was the original route of the first Great Western Railway which was merged into the Western Region of British Railways in 1948. It is now a part of the national rail system managed by Network Rail with the majority of passenger services provided by the current Great Western Railway franchise.
The line has recently been electrified along most of its length. The eastern section from Paddington to was electrified in 1998. Work to electrify the remainder of the route started in 2011 with an initial aim to complete the work all the way to Bristol by 2016, but in that year the section through Bath to Bristol Temple Meads was deferred with no date set for completion because costs had tripled.
History
The line was built by the Great Western Railway and engineered by Isambard Kingdom Brunel as a dual track line using a wider broad gauge and was opened in stages between 1838 and 1841. The final section, between Chippenham and Bath, was opened on completion of the Box Tunnel in June 1841.The alignment was so level and straight it was nicknamed "Brunel's billiard table". It was supplemented with a third rail for dual gauge operation, allowing standard gauge trains to also operate on the route, in stages between 1854 and 1875. Dual gauge was introduced as follows: London to Reading, Reading to , Didcot to , Swindon to Thingley Junction, , Thingley Junction to , Bathampton to Bristol, Bristol station area. The broad gauge remained in use until 1892. Evidence of the original broad gauge can still be seen at many places where bridges are a bit wider than usual, or where tracks are ten feet apart instead of the usual six.
The original dual tracks were widened to four in places, mainly in the east half, between 1877 and 1899: Paddington to , Southall to , West Drayton to , Slough to east side of Maidenhead Bridge, Maidenhead Bridge to , Reading station, Reading to , Pangbourne to Cholsey and Moulsford, Cholsey and Moulsford to Didcot ; also short sections between Didcot and Swindon, and at Bristol.
Following the Slough rail accident of 1900 in which five passengers were killed, improved vacuum braking systems were used on locomotives and passenger rolling stock and Automatic Train Control was introduced in 1908.
Further widenings of the line took place between 1903 and 1910 and more widening work took place between 1931 and 1932.
At the outbreak of World War I in 1914, the Great Western Railway was taken into government control, as were most major railways in Britain. The companies were reorganised after the war into the "big four" companies, of which the Great Western Railway was one. The railways returned to direct government control during World War II before being nationalised to form British Railways in 1948.
The line speed was upgraded in the 1970s to support the introduction of the InterCity 125.
In 1977 the Parliamentary Select Committee on Nationalised Industries recommended considering electrification of more of Britain's rail network, and by 1979 BR presented a range of options that included electrifying the line from Paddington to Swansea by 2000. Under the 1979–90 Conservative governments that succeeded the 1976–79 Labour government, the proposal was not implemented.
In the mid 1990s, the line between London Paddington and Hayes & Harlington was electrified as part of the Heathrow Express project.
In August 2008 it was announced that a number of speed limits on the relief lines between Reading and London had been raised, so that 86% of the line could be used at.
Partial electrification by 2019 allowed replacement of InterCity 125 and sets by new Hitachi Super Express high speed trains – the s and s. It also allowed the introduction of EMUs by GWR on shorter-distance services.
Heritage
The route of the GWML includes dozens of listed buildings and structures, including tunnel portals, bridges and viaducts, stations, and associated hotels. Part of the route passes through and contributes to the Georgian Architecture of the City of Bath World Heritage Site; the path through Sydney Gardens has been described as a "piece of deliberate railway theatre by Brunel without parallel". Grade I listed structures on the line include London Paddington, Wharncliffe Viaduct, the 1839 Tudor gothic River Avon Bridge in Bristol, and Bristol Temple Meads station.Route
Communities served by the Great Western main line include West London ; Iver; Langley; Slough; Burnham; Taplow; Maidenhead; Twyford; Reading; Tilehurst; Pangbourne; Goring-on-Thames; Streatley; Cholsey; Didcot; Swindon; Chippenham; Bath; Keynsham; and Bristol.From London to Didcot, the line follows the Thames Valley, crossing the River Thames three times, including on the Maidenhead Railway Bridge. Between Chippenham and Bath the line passes through Box Tunnel, and then follows the valley of the River Avon.
A junction west of Swindon allows trains to reach Bristol by an alternative route along the South Wales Main Line. Other diversionary routes exist between Chippenham and Bath via the Wessex Main Line, although this involves a reversal at Bradford Junction; and from Reading to Bath via the Berks and Hants Line.
Services
Main line and local services are provided by Great Western Railway. The stations served by trains between London Paddington and Bristol Temple Meads are:,,,, and. Some trains between London and Bristol do not call at Didcot Parkway.Fast trains from Paddington to London Heathrow Airport are operated by Heathrow Airport Holdings as the Heathrow Express. Local services on this route are operated by TFL Rail.
CrossCountry operate trains between Reading and Oxford, using the Great Western main line as far as Didcot and South Western Railway operate a limited number of trains between Bath and Bristol.
Great Western Railway also operate a train between London Paddington – Cardiff Central every 30 minutes, with hourly extensions to Swansea. At Swansea/Cardiff there is a connecting Transport for Wales boat train to/from Fishguard Harbour for the Stena Line ferry to Rosslare Europort in Ireland. An integrated timetable is offered between London Paddington and Rosslare Europort with through ticketing available. Daytime and nocturnal journeys are offered in both directions daily. Additionally, 2–3 Great Western Railway trains continue to Pembroke Dock on weekends during the Summer season to connect with ferry services to Ireland.
Infrastructure
Between London and Didcot there are four tracks, two for each direction. The main lines are mostly used by the faster trains and are on the south side of the route. The relief lines on the north side are used for slower services and those that call at all stations, as only London Paddington, Slough, Maidenhead, Twyford, Reading and Didcot Parkway stations have platforms on the main lines. Between Didcot and Royal Wootton Bassett, a series of passing loops allow fast trains to overtake slower ones. This section is signalled for bi-directional running on each line but this facility is usually only used during engineering working or when there is significant disruption to traffic in one direction.The summit of the line is at Swindon, and falls away in each direction: Swindon is above Paddington, and above Bristol Temple Meads. The maximum gradient between Paddington and Didcot is 1 in 1320 ; between Didcot and Swindon it is 1 in 660 but west of Swindon, gradients as steep as 1 in 100 are found in places, such as Box Tunnel and to the east of.
The line is electrified between Paddington and Langley Burrell using 25 kV AC overhead supply lines; the Reading to Taunton line and the South Wales Main Line are also electrified.
The line speed is. The relief lines from Paddington to Didcot are limited to as far as Reading, and then to Didcot. Lower restrictions apply at various locations. The line is one of two Network Rail-owned lines equipped with the Automatic Train Protection system, the other being the Chiltern Main Line.
Tunnels, viaducts and major bridges
Major civil engineering structures on the Great Western main line include the following.Railway structure | Length | Distance from London Paddington | Location |
Subway Tunnel | – | West of Royal Oak | |
Spring Bridge Road Car Park Tunnel | – | West of Ealing Broadway | |
Hanwell Viaduct | – | West of Hanwell | |
Wharncliffe Viaduct | – | West of Hanwell | |
Hanwell Bridge | – | West of Hanwell | |
Maidenhead Viaduct | – | East of Maidenhead | |
Seven Arch Viaduct | – | West of Twyford | |
River Loddon Viaduct | – | West of Twyford | |
Kennet Bridge | – | East of Reading | |
Gatehampton Viaduct | – | East of Goring & Streatley | |
Moulsford Viaduct | – | East of Cholsey | |
River Avon Viaduct | – | East of Chippenham | |
Chippenham Viaduct | – | West of Chippenham | |
Box Tunnel | – | Between Chippenham and Bath Spa | |
Middle Hill Tunnel | – | Between Chippenham and Bath Spa | |
Sydney Gardens East Tunnel | – | East of Bath Spa | |
Sydney Gardens West Tunnel | – | East of Bath Spa | |
Dolemeads Viaduct | – | East of Bath Spa | |
Arches and St James Viaduct | – | West of Bath Spa | |
Twerton Viaduct | – | Between Oldfield Park and Keynsham | |
Twerton Short Tunnel | – | Between Oldfield Park and Keynsham | |
Twerton Long Tunnel | – | Between Oldfield Park and Keynsham | |
Saltford Tunnel | – | Between Oldfield Park and Keynsham | |
St Annes Park Arches Viaduct | – | Between Keynsham and Bristol Temple Meads | |
St Annes Park No.3 Tunnel | – | Between Keynsham and Bristol Temple Meads | |
St Annes Park or No.2 Tunnel | – | Between Keynsham and Bristol Temple Meads | |
Main River Viaduct | c. | Between Keynsham and Bristol Temple Meads | |
Main Down Viaduct | – | Between Keynsham and Bristol Temple Meads | |
The Feeder | Between Keynsham and Bristol Temple Meads | ||
Floating Harbour | – | Between Keynsham and Bristol Temple Meads |
Line-side monitoring equipment
Line-side train monitoring equipment includes hot axle box detectors and 'Wheelchex' wheel impact load detectors, sited as follows.Name & Type | Line | Location |
Maidenhead HABD | Up Relief | |
Maidenhead HABD | Up Main | |
Waltham WILD | Up Relief, Down Relief, Up Main, Down Main | |
Twyford HABD | Down Relief, Down Main | |
Basildon HABD | Up Relief, Down Relief, Up Main | |
Cholsey WILD | Up Relief, Down Relief, Up Main, Down Main | |
Wantage Road HABD | Up Main | |
Bourton HABD | Down Main | |
Studley HABD | Up Main | |
Twerton HABD | Down Main |
Planned developments
Since 2011, the Great Western has been undergoing a £5 billion modernisation by Network Rail.Reading railway station saw a major redevelopment with new platforms, a new entrance, footbridge and lifts; the work was completed a year ahead of schedule in July 2014.
Electrification from Airport Junction to the west
The Crossrail project covered electrification of the line from Airport Junction to Maidenhead and, following a number of announcements and delays, the government announced in March 2011 that it would electrify the line as far as Bristol Temple Meads.Following delays to the original plan, and a major escalation of costs, the Conservative government announced in July 2017 that, for the time being, electrification would only be completed as far as Thingley Junction, west of Chippenham. Electrification of other lines, including Bristol Parkway to Temple Meads and Didcot to Oxford was also postponed. The government argued that bi-mode trains would fill in the gaps pending completion of electrification, although the Class 800 trains are slower in diesel mode than under electric power. Electrification as far as Didcot Parkway was completed in December 2017, and to Thingley Junction in December 2019.
Other proposals
Network Rail plans to install European Rail Traffic Management System in-cab signalling on the Great Western line; this is a pre-requisite for the Super Express trains to run at 140 mph. Some or all of the resignalling work will be undertaken during the electrification work.Further capacity improvements are also scheduled at Swindon, adding to recent changes and the new Platform 4.
Crossrail services are planned to terminate at Reading. Some of the current suburban services into London Paddington are planned to be transferred to the new Crossrail service, which will free up some surface-level capacity at Paddington.
Other more distant aspirations include resignalling and capacity improvements at Reading; the provision of four continuous tracks between Didcot and Swindon ; and resignalling between Bath and Bristol to enable trains to run closer together.
Access to Heathrow Airport from the west remains an aspiration and the 2009 Heathrow Airtrack scheme, abandoned in 2011, proposed a route south of the Great Western main line to link the airport with Reading. Plans for electrification of the line will make it easier to access Heathrow from Reading, since lack of electrification between Reading station and Airport Junction was a limiting factor. Plans under consideration in 2014 included new tunnels between Heathrow and Langley.
Network Rail intends to replace the ATP system with ETCS – Level 2 from 2017 to 2035 along with the introduction of the new IEP trains.
Signalling Solutions is to resignal the from Paddington to, including the Airport branch, as part of the Crossrail project.
Calls for station reopenings
There are calls for the reintroduction of Corsham station due to recent growth of the town. The original station was closed to passengers in 1965.A local group is campaigning for the reopening of Saltford station between Bath and Bristol, to coincide with electrification.
There have also been calls to reopen the former Wantage Road station. Oxfordshire County Council included a proposal for a new station to serve Wantage and Grove in their 2015–2031 local transport plan.
Major incidents
- Slough rail accident – 16 June 1900 – An express train from Paddington to ran through two sets of signals at danger and collided with a local train heading for Windsor. Five passengers were killed and 35 seriously injured.
- Ealing rail crash – 19 December 1973 – A train from Paddington to Oxford derailed after a loose battery box cover on the Class 52 "Western" locomotive hauling the train struck lineside equipment, causing a set of points to move under the train. Ten passengers were killed and 94 injured.
- Southall rail crash – 19 September 1997 – An InterCity 125 service from to Paddington, operated by Great Western Trains, failed to stop at a red signal and collided with a freight train entering Southall goods yard. Seven people were killed and 139 were injured. The incident severely damaged public confidence in the safety of the rail system. It was found that the train's AWS was faulty, and the driver had been distracted. Great Western Trains was fined £1.5 million for violations of health and safety law in connection with the accident.
- Ladbroke Grove rail crash – 5 October 1999 – A Thames Trains service from Paddington to passed a signal at danger at the gantry protecting a main set of points between the one-way and bi-directionally used lines. The train ran the wrong way down the line and was hit head-on by a First Great Western HST service from to Paddington at a closing speed of approximately. 31 people died, including both drivers, with more than 520 people injured. Thames Trains was fined £2 million for violations of health and safety law. Network Rail pleaded guilty to charges under the Health and Safety at Work Act 1974 in relation to the accident. It was subsequently fined £4 million and was also ordered to pay £225,000 in costs.
Rolling stock