The dam is named after the town of Toston, Montana, which is just away. A $1.12 million dam was originally proposed in 1935. This project never was built. A smaller dam, whose construction would cost $900,000, was proposed in 1938, and the Montana State Water Conservation Board sought Public Works Administration funds to help construct the dam. This effort proved successful, and the federal agency gave the state $820,000 to build the dam. The project was the second-most-expensive hydro effort in the state at the time. The dam was built on a natural ridge of rock which ran perpendicular to the Missouri River on a point about above Big Spring. An inlet gate was built slightly upstream of the dam which connected to an underground pipeline that exited the ground downstream and connected to an irrigation canal running eastward. A ditch diverted water on the west down a canal for more irrigation purposes. About of Northern Pacific Railroad track was moved and raised to prevent it from being inundated by the Toston Reservoir. The dam was completed 1940.
Operation
Toston Dam is owned and operated by the Montana Department of Natural Resources and Conservation. The dam includes inflatable Flashboards made of rubber at the crest of the dam, which can be used to raise the dam's height slightly. Toston Reservoir, behind the dam, has a storage capacity of of water. About of land are irrigated by the dam. Toston Dam originally did not generate power. But in 1979, the Montana state legislature passed a bill which would have allowed a state rural electrical cooperative to install generators at the dam. Governor Thomas Judge vetoed the bill, and the DNRC installed the generators instead. The agency's sole purpose was to generate revenues which it could then use to fund other projects throughout the state. Despite opposition, the agency went ahead in December 1982 with its $23 million plan to install a generating plant. But the power plant did not go online until 1989. Toston Dam generates approximately $900,000 a year in net revenues for the DNRC, which it uses to maintain other state-owned recreation, irrigation, and flood-control projects. Major upgrades have occurred at Toston Dam in the past several years. A $26 million refurbishment in 1989 added the power plant, the inflatable flashboards, and improvements to maintenance and access roads. In 2002, the state spent $450,000 installing automatic "rakes" along the crest of the dam to clear debris. The rakes prevent damage to the dam, and helped to greatly reduce the number of times the power plant had to be shut down in order to clean the penstocks. In 2005, a bridge was built over the crest of the dam to give maintenance workers access to the dam face and to give the public access to the east side of the river.
Conservation issues
Toston Dam is threatened with environmental degradation due to invasive species. In 2009, the Montana Department of Fish, Wildlife and Parks warned that the reservoir had been invaded by northern pike which had escaped from private ponds upstream. Northern pike are an aggressive predatory fish which feed on trout and other species highly prized by fishermen. A year later, the state sought approval to remove the limit on daily catches of northern pike to protect several trout species, which had come under severe pressure from the pike. In April 2011, the pike problem became so severe that the FWP announced an even more aggressive plan to try to remove the predatory fish from Toston Reservoir and other upstream waters. In 2010, FWP officials announced that non-native milfoil had invaded Toston Reservoir and Fort Peck Dam Reservoir. Milfoil is classified by the state of Montana as a Priority 1B noxious weed, one of the highest priority invasive species.